Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000374/LER-2001-001 +
- PLA-7769, Annual Radiological Environmental Operating Report (PLA-7769) +
- ML19253A882 +
- BVY-05-013, January 2005 Monthly Operating Report for the Vermont Yankee Nuclear Power Station +
- ML050530186 +
- ML032250640 +
- ML20058P166 +
- ML20115F047 +
- ML20108D716 +
- ML20147C865 +
- ML20204A780 +
- ML22208A002 +
- ML20058K863 +
- ML23205A028 +
- ML23046A096 +
- 05000413/LER-1988-023-02, :on 881025,Trains a & B Control Room Ventilation Inoperable.Caused by Functional Design Deficiency of Cooling Water Flow Control Valve.Flow to Lube Oil Cooler Increased by Adjusting Valve +
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed +
- 05000325/LER-1994-013, :on 941023,control Bldg Emergency Air Filtration Isolation Occurred.Caused by Personnel Error & Procedure Inadequacy.Chlorinator Sys Operating Procedure Revised +
- 05000353/LER-1990-012-02, :on 900715,reactor Scram Occurred Due to Main Turbine Trip on Low Main Condenser Vacuum Due to Failed Pipe.Caused by Insufficient Pipe Support Resulting in Vibration Induced Metal Fatigue.Pipe Replaced +
- 05000338/LER-1993-015, :on 930427,discovered That Portions of Containment Pressure Channels That Input to Containment Spray hi-hi Pressure Not Tested Monthly.Caused by Personnel Error.Test Procedures Changed +
- ML20033G362 +
- ML19298C513 +
- 05000280/LER-1989-037, :on 891017,steam Generator a Steam Line to Steam Header High Differential Pressure Safety Injection Channel IV Declared Inoperable.Caused by Failure of Pressure Comparator.Comparator Replaced +
- 05000251/LER-1992-006-03, :on 920927,identified That Required Surveillance Not Performed Per TS 4.5.2.b.1.Caused by Personnel Error.All Surveillances in Sys Verified to Have Been Performed Per TS +
- ML15239A175 +
- 05000265/LER-2003-004, For Quad Cities Unit 2 Regarding Reactor Shutdown Due to Degraded Reactor Steam Dryer as a Result of Increased Steam Velocities from Extended Power Uprate +