Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19353A113 +
- PLA-7699, Annual Radiological Environmental Operating Report for 2017 +
- ML20050B067 +
- ML20040C620 +
- ML021070429 +
- ML20078K736 +
- ML20077H683 +
- ML20104B085 +
- ML20093G806 +
- ML20084M488 +
- IR 05000255/1985027 +
- ML20205A293 +
- ML20237L595 +
- ML20058K863 +
- U-602181, Special Rept:On 930812-30,differential Air Temp Instrumentation Inoperable.Caused by Problem W/Power Supply Panel 0EM01J.Replacement Power Supply Unavailable. Engineering Change Request ECN 28103 Processed +
- 05000293/LER-1997-026, :on 971206,automatic Scram Was Initiated.Caused by High Reactor Water Level During Power Ascension.Pilot Valve Clip Was Repositioned Inside Bailey Positioner & Valve Was Stroked Smoothly +
- 05000395/LER-1988-001, :on 880204,three Perimeter Cameras Lost Due to Circuit Breaker Trip.Caused by Electricians Crimping Electrical Lead While Replacing Distribution Panel Cover. Security Procedures Implemented +
- 05000354/LER-1999-006-01, :on 990518,unexpected Actuation of B Channel PCIS Occurred.Caused by Personnel Error.Addl Training Will Be Provided to Operations Personnel to Preclude Addl Unexpected ESF Actuations +
- ML20195C958 +
- 05000267/LER-1983-025-03, /03L-0:on 830721-0806,reactor Operated in Degraded Modes of Limiting Condition for Operation 4.2.10.Caused by 830317 High Moisture Scram.Reactor Power Restricted While Helium Purification Sys Removed Impurities +
- 05000352/LER-1990-028-01, :on 901126,instrumentation & Controls Personnel Discovered That Facility Tech Specs Required Surveillance Requirements Not Met for Two Intermediate Range Monitors.W/ +
- 05000352/LER-1990-031-01, :on 901203,contract Fire Watch Coordinator Discovered That Surveillance Test Procedure ST-7-022-371-1, Unit 1 Fire Door Daily Position Check, Not Performed on 901202 +
- 05000320/LER-1982-037-01, /01P:on 821115,B Once Through Steam Generator Level Indication Failed,Resulting in Indication Being Declared Inoperable.Details Will Be Included in Followup Rept +
- ML20033F368 +
- ML19351E060 +
- 05000272/LER-1988-017, :880919,steam Flow Channels I & II for Steam Generators 12 & 14 & Channel II for Steam Generator 13 Declared Inoperable Due to Low Reading.Cause Not Determined. Steam Flow Channel Recalibr +
- 05000316/LER-1989-006, :on 890224,ESF Actuation Occurred from Instrumentation Indicating Low Level Coincident W/Feedwater Flow/Steam Flow Mismatch on Steam Generator 24.Cause Unknown.Procedures Implemented +
- 05000397/LER-1997-004, :on 970327,plant Operators Manually Scrammed Reactor as Required by TS Due to Indication of Entry Into Region a of power-to-flow Map.Caused by Inadequate Attention to Detail.Established Event Evaluation Teams +
- 05000397/LER-1991-010, :on 910422,inability to Isolate Primary Containment Due to Wiring Separation Error Caused by Inadequate Work Instructions.Initiated Hourly Fire Tour for Accessible Areas +
- 05000269/LER-1917-001, Regarding Loss of Both Keowee Hydroelectric Units Due to Human Error +
- 05000397/LER-2014-001, Regarding Secondary Containment Pressure Exceeded +
- 05000272/LER-2009-001, Chillers Inoperability Exceeds TS Allowed Outage Time +
- BVY-04-108, September 2004 Monthly Operating Report for the Vermont Yankee Nuclear Power Station +
- 05000272/LER-1982-009, Supplemental LER 82-009/03X-1:on 820118 & 25,Cardox Fire Suppression Sys for 1A,1B & 1C Diesel Generator Areas & Fuel Oil Storage Area 12 Inoperable for More than 14 Days.Caused by Sys in Manual Mode Due to Maint Outage +