Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 43081 +
- BVY-05-013, January 2005 Monthly Operating Report for the Vermont Yankee Nuclear Power Station +
- ML050530186 +
- ML20062F583 +
- 05000311/LER-1982-132, Forwards LER 82-132/03L-0.Detailed Event Analysis Encl +
- ML20085E206 +
- ML20096D256 +
- ML20076K601 +
- ML20129F549 +
- 1CAN028306, Submits Updated Info Re Status of Ongoing Steam Generator Tube Inservice insps.Once-through Steam Generator Tube Sheet Maps,Defective Tube Summary & Summary of Operational History of Previous Cycle Encl +
- ML20246L654 +
- ML20235J596 +
- ML20129F418 +
- 05000301/LER-1989-002, :on 890329,unit Experienced Main step-up Transformer Lockout Main Generator Breaker Trip & Concurrent Turbine & Reactor Trips.Caused by Wiring Error in Terminal Box 2-TB69.Repairs Completed +
- 05000498/LER-1987-012, :on 871102,high Head Safety Injection Sys Cold Leg Injection Valves Closed.Caused by Inadequate Training & Personnel Error.Mgt Reemphasized Proper Use of Procedures, Annunciators & Attention to Details +
- 05000282/LER-1997-014, :on 971028,maint Shop Fire in Service Building Occurred.Caused by Spark or Hot Molten Particle Drawn Into Air Filtration Device Which Ignited 1 of 2 Paper Filters. Evacuated Turbine Bldg +
- 05000395/LER-1988-001, :on 880204,three Perimeter Cameras Lost Due to Circuit Breaker Trip.Caused by Electricians Crimping Electrical Lead While Replacing Distribution Panel Cover. Security Procedures Implemented +
- 05000278/LER-1988-002-01, :on 880507,primary Containment Isolation Sys Group II RWCU Isolation Signal Generated as Result of Loss of Power to Temp Switch.Caused by 4-3R4 Tie Breaker Malfunction.Tie Breaker Removed & Serviced +
- 05000278/LER-1988-002-02, :on 880507,primary Containment Isolation Sys Group II RWCU Isolation Signal Generated as Result of Loss of Power to Temp Switch.Caused by Tie Breaker Malfunction. Tie Breaker Removed from Svc & Inspected +
- 05000301/LER-1988-001-01, :on 880407,reactor Trip Occurred & Safety Injection Initiated Due to Low Pressurizer Pressure Signal. Caused by Procedure Inadequacy,Personnel Error & Design Deficiency.Instrument Bus Power Returned to Normal Supply +
- 05000266/LER-1985-004, :on 850725,diesel Generators auto-started After Loss of Low Voltage Station Transformer 1X04.Caused by Power Failure Due to Lockout of Low Voltage Station Transformer 1X04.Transformer Returned to Svc +
- 05000341/LER-1991-002, :on 910215,emergency Diesel Generators 11 & 13 Inoperable Due to Problems on Woodard Governor Motor Operated Potentiometers.Edg Have Been Tested,Examined & Maint Procedures Will Be in Effect +
- 05000482/LER-1994-002, :on 940124,WCGS Entered TS 3.1.3.1 Action Statement (c)(4) Due to Electrical Problem W/Crdm M-12. Caused by Loose Cable Connector for CRDM M-12.Maint Performed on Connector +
- 05000315/LER-1987-021, :on 871013,ESF Actuation Occurred Due to Feedwater Flow/Steam Mismatch Coincident W/Low Level on Steam Generator 11.Caused by Failure of East Main Feedwater Pump Shaft Driven Oil Pump.Bearings Replaced +
- 05000280/LER-2008-002, Re Relay Failure Results in Emergency Diesels Auto-Starting +
- PLA-7985, Annual Radiological Environmental Operating Report +
- ML20129J050 +
- ML20112C267 +