i

  • umorick cener ting ctation

. =$k.

=,&V \

PECO ENERGY ;8eJra'"""""'

Sanatoga, PA 19464-0920 $

T.S.6.9.1.6 i

June 12, 1995 Docket Nos. 50-352 l 50-353 e i

License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of May 1995 forwarded pursuant to Technical Specification 6.9.1.6.

i Very truly yours, Michael P. Gallagher Director - Site Engineering drh Enclosures cc: T. T. Martin, Administrator, Region I, USNRC N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS 1

i I

9506160468 950531 r PDR ADOCK 05000352 // p R PDR l

\\\

\ l

3 .~.: ,

,"N 4

)

Attachment to Monthly  :

Operating Report for  ;

May 1995  !

Limerick Generating Station ,

Unit 1 - l May 1 through May 31,1995 i f

1. Narrative Summary d Operating Experiences  :

I Unit 1 began the month d May at a nominal 100% d rated thermal power (RTP).  !

On May 7,1995, at 0021 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br />, power was reduced to 90% RTP for main turbine valve testing -

Following testing, the Unit commenced a shutdown to perform maintenance on the 'C' drain  :'

cooler, 'A' recirculation pump seal, and the condenser waterboxes. The reactor was scrammed at 0904 hours0.0105 days <br />0.251 hours <br />0.00149 weeks <br />3.43972e-4 months <br /> on May 7,1995. On May 10,1995, the mode switch was placed in startup and >

control rod withdrawal commenced shortly thereafter. The unit 1 reactor went critical at 1815 l hours and on May 11,1995, at 0541 hours0.00626 days <br />0.15 hours <br />8.945106e-4 weeks <br />2.058505e-4 months <br />, the mode switch was placed in run. The main i generator was synchronized to the grid at 1227 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.668735e-4 months <br />. Power was restored to 100% RTP on -

May 15,1995, at 0007 houm. i i

Unit 1 ended this operating period at 100% d RTP. -;

i ll. Challenges to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of May. (

i

[

t i

i i

l 1

i i

u i

l l

1 j

AVERAGE DAILY UNIT POWER LEVEL e , ,.

DOCKET NO. 50 - 352 UNIT LIMERICK UNIT 1 DATE JUNE 09 1995 COMPANY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICM GENERATING STATION TELEPHONE (610) 718-3772

______-----....___........... t MONTH MAY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-NET) (MwE-NET) 1 1029 17 1051 2 1034 18 1047 3 1025 19 1064 4 1029 20 1050 5 1025 21 1051 6 1029 22 1059 7 190 23 1051 0 0 24 1047 9 0 25 1046 10 0 '

26 1054 11 91 27 1050 12 722 28 1053 13 924 29 1045 14 898 30 1045 15 1044 31 1054 16 1055

OPERATING DAVQ REPORT , +

DOCKET NO. 50 - 352 DaTE JUNE 09, 1995 COMPLETED BV PECO ENERGV COMPANY DAVID R. HENRICKS REDORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 OPERATING STATUS 1 UNIT NAME: LIMERICM UNIT 1 '

NOTES: THERE WAS 1 LOAD DROP

2. REPORTING PERIOD: MAV. 1995 GREATER THAN 20% THIS MONTH
3. LICENSED THERMAL POWER (MWTi: 3293 DUE TO A SHUTDOWN TO PERFORM 4 NAMEPLATE RATING (GROSS MWE):- 1092 MAINTENANCE. l l
5. DESIGN ELECTRICAL RATING (NET MwE): 1055 l

[

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092 I
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1055 i
8. Ir CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANV (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH VR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 3.623 81.767
12. NUMBER OF HOURS REACTOR WAS CRITICAL 662.8 3.522.3 67.630.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 644.6 3.485.8 66.511.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGV GENERATED (MWH) 2.094.746 11.400.182 205.716.720
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 667.400 3.709.900 66.894.180
18. NET ELECTRICAL ENERGY GENERATED (MWH) 644.273 3.586.878 64.230.884 PAGE 1 05 2

OPERATING DATQ REPORT (CONTINUED) DOCCIET NO. 90 - 352 , .,,

DATE JUNE 09. 1995 THIS MONTH VR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 86.6 96.2 81.3 2C. UNIT AVAILABILITY FACTOR 86.6 96.2 81.3
21. UNIT CAPACITY FACTOR (U51NG MDC NET) 82.1 93.8 74.5
22. UNIT CAPACITY FACTOR (USING DER NET) 82.1 93.8 74.5
23. UNIT FORCED OUTAGE RATE O.0 1.1 4.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
25. IF 5HUTDOWN AT END OF REPORT DERIOD. ESTIMATED DATE OF STARTU":
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITV MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 PAGE 2 OF 2

_ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ -. . . _ _ _ . _ _ . . . , . . . . . - . , - _. , , . . . _ ~ . - . - . . . - . , ..- . , , . . . . - . _ . , . . . . _ ._ . ..__s

I e-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352 .

UNIT NAME LIMERICK UNIT 1 DATE JUNE 09 1995 .

REPORT MONTH MAv. 1995 COMPLETED BV PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 l l UETHOD OF l LICENSEE SYSTEMLCOMPONENTl CAUSE AND CORRECTIVE l TYPE DURATION REASON 15 HUTTING DOWN! EVENT CODE CODE I ACTION TO NO.l DATE (1) (HOURS); (2) l REACTOR (3) l REPORT a (4) (5) i PREVENT RECURRENCE I I I i l 64 1 950507 l 5 000.0 B 4 l N/A HA VALVEX l REACTOR POWER WAS REDUCED TO 90.0% FOR 4 l l l MAIN TURBINE VALVE TESTING. 4 I I I 65 950507 5 099.4 ] B 2 N/A HH HTEXCH l REACTOP WAS SHUTDOWN TO PERFORM MAINT. 4 I ON "C" DRAIN COOLER. "A" RECIRCULATION 4 PUMP SEAL. AND THE CONDENSER WATERBOXES. 4 4

4 l 99.4 l (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS 5 - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE l

- , - - ~ - -- -.

n. .

Docket No. 50-353 j Attachment to Monthly Operating Report for -

May 1995 Limerick Generating Station  !

Unit 2 May 1 through May 31,1995 j

l. Narrative Summary of Operating Exoeriences i

i Unit 2 began the month of May at a nominal 100% of rated thermal power (RTP).  !

On May 6,1995, at 0020 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, power was reduced to 90% RTP for a control rod pattom i adjustment. Power was restored to 100% RTP at 0338 hours0.00391 days <br />0.0939 hours <br />5.588624e-4 weeks <br />1.28609e-4 months <br />.

On May 15,1995, at 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br />, power was reduced due to high turbine backpressure Power was reduced to 91.5% RTP. Power was restored to 100% RTP at 1945 hours0.0225 days <br />0.54 hours <br />0.00322 weeks <br />7.400725e-4 months <br />.

On May 16,1995, at 1411 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.368855e-4 months <br />, power was reduced due to high turbine backpressure Power i was reduced to 96% RTP, Power was restored to 100% RTP at 2025 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.705125e-4 months <br />. -

On May 17,1995, at 1446 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.50203e-4 months <br />, power was reduced due to high turbine backpressure. Power was reduced to 90% RTP. Power was restored to 100% RTP at 2135 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.123675e-4 months <br />. t On May 18,1995, at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />, power was reduced due to high turbine backpressure. Power was reduced to 96.5% RTP. Power was restored to 100% RTP at 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />.  ;

Unit 2 ended this operating period at 100% of R1P.

f II. Challenges to Main Steam Safety Relief Valves  ;

There were no challenges to the Main Steam Safety Relief Valves during the month of May.

1 P

I l

4 1

i

'o QVEROGE DOILY UNIT POWER LEVEL .

DOCKET NO. 50 - 353 UNIT LIMERICK UNIT 2 DATE JUNE 09. 1995 COMDANY PECO ENERGY COMPANY DAVID R. HENRICKS REPORT 5 ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH MAY 1995 DAY AVERAGE DAILY POWER LEVEL DAV AVERAGE DAILY power LEVEL (WWE-NET) (MwE-NET) 1 1122 17 1081 2 1125 18 1094 3 1117 19 1122 4 1117 20 1114 5 1118 21 1118 6 1103 22 1127 7 1109 23 1123 8 1119 24 1114 9 1116 25 1119 10 1111 26 1121 11 1107 27 1122 12 1109 28 1127 13 1110 29 1114 14 1117 30 1114 15 1085 31 1125 10 1106

. _ . . , . . . . .. -- _ ,-- -. -- .-. -m, - -- .- - -- .--- -- . _ __ - - - - -

OPERQTING DaTo REPORT .

DOCMET NO. 50 - 353 DATE JUNE 09, 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 710-3772 OPERATING STATUS

1. UNIT NAME: LIMERICK UNIT 2 l NOTES: THERE wERE NO LOAD DROPS I l t
2. REPORTING PERIOD: MAv. 1995 GREATER THAN 201f. THIS MONTH. i l
3. LICENSED THERMAL POWER (wwT): 345B l 4 NAMEPLATE RATING (GROSS MwE): 1163 I i

__________ _  ; l S. DE$1GN ELECTRICAL RATING (NET MWE): 1115 l l

______... s

6. MAXINUM DEPENDABLE CAPACITY (GROS 5 MwE): 1155
7. max!NUM DEPENDABLE CAPACITY (NET MWE): 115 B. IF CMANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH v7-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 744 3.623 47.279

12. NUMB ER OF HOURS REACTOR WAS CRITICAL 744.0 3.103.4 42.466 4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 2.995.8 41.600.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGv GENERATED (MwH) 2.564.933 9.073.472 131.303.055 17 GROSS ELECTRICAL ENERGY GENERATED (MwH) 856.000 3.015.900 43.399.480
18. NET ELECTRICAL ENERGY GENERATED (MWM) 828.631 2.910.017 41.812.217 PAGE 1 OF 2

?

OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 353 ,

DATE JUNE 09 1995 l THIS MONTH VP-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 82.7 88.0
20. UNIT AVAILABILITY FACTOR 100.0 82.7 88.0 21 UNIT CAPACITV FACTOn (USING WDC NET) 99.9 72.6 83.6
22. UNIT CAPACITV FACTOR (USING DER NET) 99.9 72.6 83.6
23. UNIT FORCED OUTAGE RATE O.0 2.6 3.4 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: '(
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/

. ---..'J B / 9 0 PAGE 2 OF 2

_ _ _ _ _ _ . _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . __ _ . . . _ _ . _ . - . . . . - . _ . . - - . - , _ _ _ .s

UNIT SHUTDOONS QND POWER REDUCTIONS DOCnET NO. 50 - 353 . - b-UNIT NAME LIMERICM UNIT 2 DATE JUNE 09 1995 REPORT WONTH MAY. 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772

.___.._---__-.________._-. -_-_...__.....__________ ..._________._-_______.___-~__-___.____..-________..__ __.___......._.._.

i l i l l METHOD OF l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE l lTVPElDURATIONlREASONj$ HUTTING DOwn! EVENT l CODE CODE l ACTION TO NO.l DATE i (1)) (HOURS){ (2) i REACTOR (3) l REPORT

  • 1 (4) (5) I PREVENT RECURRENCE i I  ! I i 1 49 950506 1 5 000.0 i B 4 i N/A RB CONROD 1 REACTOR POWER WAS REDUCED TO 90% DUE TO 4 1 1 l l CONTROL ROD PATTERN ADJUSTMENT 4 1 1 1 50 - 9505t5 1 5 000.0 i B . 4 l N/A HC HTEXCH REACTOR POWER wAS REDUCED TO 92% DUE TO 4 i i  ! l l l H C.H TURBINE BACK PRES 5URE. 4 l 1 l l t 51 1 950516 l 5 000.0 B l 4 l N/A HC l HTEXCH REACTOR POWER WAS REDUCED TO 96% DUE TO 4 l l l l HIGH TURBINE BACk PRESSURE. 4 i l I 52 950517 i S i 000.0 B l 4 l N/A HC HTEXCH . REACTCR POWER WAS REDUCED TO 90% DUE TO 4 l l l 1 l HIGH TURBINE BACk PRESSURE. 4 I I 1  ! l 53 l 950518 I 5 000.0 B l 4 N/A i HC HTEXCH I REACTOR POWER WAS REDUCED TO 97% DUE TO 4 i i  ! HIGH TURBINE BACK PRESSURE. 4 i  ! 4 I i 4 I l l l 4 I I I -----  ! ,

1 I I - l 1. l I (1) (2) (3) (4)

F - FORCED REASON METHOD EX4IBIT G- INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)