Text
- -
i
- umorick cener ting ctation
. =$k.
=,&V \
PECO ENERGY ;8eJra'"""""'
Sanatoga, PA 19464-0920 $
T.S.6.9.1.6 i
June 12, 1995 Docket Nos. 50-352 l 50-353 e i
License Nos. NPF-39 NPF-85 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of May 1995 forwarded pursuant to Technical Specification 6.9.1.6.
i Very truly yours, Michael P. Gallagher Director - Site Engineering drh Enclosures cc: T. T. Martin, Administrator, Region I, USNRC N. S. Perry, USNRC Senior Resident Inspector LGS W. G. MacFarland, Vice President, LGS 1
i I
9506160468 950531 r PDR ADOCK 05000352 // p R PDR l
\\\
\ l
3 .~.: ,
,"N 4
)
Attachment to Monthly :
Operating Report for ;
May 1995 !
Limerick Generating Station ,
Unit 1 - l May 1 through May 31,1995 i f
- 1. Narrative Summary d Operating Experiences :
I Unit 1 began the month d May at a nominal 100% d rated thermal power (RTP). !
On May 7,1995, at 0021 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br />, power was reduced to 90% RTP for main turbine valve testing -
Following testing, the Unit commenced a shutdown to perform maintenance on the 'C' drain :'
cooler, 'A' recirculation pump seal, and the condenser waterboxes. The reactor was scrammed at 0904 hours0.0105 days <br />0.251 hours <br />0.00149 weeks <br />3.43972e-4 months <br /> on May 7,1995. On May 10,1995, the mode switch was placed in startup and >
control rod withdrawal commenced shortly thereafter. The unit 1 reactor went critical at 1815 l hours and on May 11,1995, at 0541 hours0.00626 days <br />0.15 hours <br />8.945106e-4 weeks <br />2.058505e-4 months <br />, the mode switch was placed in run. The main i generator was synchronized to the grid at 1227 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.668735e-4 months <br />. Power was restored to 100% RTP on -
May 15,1995, at 0007 houm. i i
Unit 1 ended this operating period at 100% d RTP. -;
i ll. Challenges to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety Relief Valves during the month of May. (
i
[
t i
i i
l 1
i i
u i
l l
1 j
AVERAGE DAILY UNIT POWER LEVEL e , ,.
DOCKET NO. 50 - 352 UNIT LIMERICK UNIT 1 DATE JUNE 09 1995 COMPANY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICM GENERATING STATION TELEPHONE (610) 718-3772
______-----....___........... t MONTH MAY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-NET) (MwE-NET) 1 1029 17 1051 2 1034 18 1047 3 1025 19 1064 4 1029 20 1050 5 1025 21 1051 6 1029 22 1059 7 190 23 1051 0 0 24 1047 9 0 25 1046 10 0 '
26 1054 11 91 27 1050 12 722 28 1053 13 924 29 1045 14 898 30 1045 15 1044 31 1054 16 1055
OPERATING DAVQ REPORT , +
DOCKET NO. 50 - 352 DaTE JUNE 09, 1995 COMPLETED BV PECO ENERGV COMPANY DAVID R. HENRICKS REDORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 OPERATING STATUS 1 UNIT NAME: LIMERICM UNIT 1 '
NOTES: THERE WAS 1 LOAD DROP
- 2. REPORTING PERIOD: MAV. 1995 GREATER THAN 20% THIS MONTH
- 3. LICENSED THERMAL POWER (MWTi: 3293 DUE TO A SHUTDOWN TO PERFORM 4 NAMEPLATE RATING (GROSS MWE):- 1092 MAINTENANCE. l l
- 5. DESIGN ELECTRICAL RATING (NET MwE): 1055 l
[
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092 I
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1055 i
- 8. Ir CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANV (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 3.623 81.767
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 662.8 3.522.3 67.630.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 644.6 3.485.8 66.511.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGV GENERATED (MWH) 2.094.746 11.400.182 205.716.720
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 667.400 3.709.900 66.894.180
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 644.273 3.586.878 64.230.884 PAGE 1 05 2
OPERATING DATQ REPORT (CONTINUED) DOCCIET NO. 90 - 352 , .,,
DATE JUNE 09. 1995 THIS MONTH VR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 86.6 96.2 81.3 2C. UNIT AVAILABILITY FACTOR 86.6 96.2 81.3
- 21. UNIT CAPACITY FACTOR (U51NG MDC NET) 82.1 93.8 74.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 82.1 93.8 74.5
- 23. UNIT FORCED OUTAGE RATE O.0 1.1 4.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 25. IF 5HUTDOWN AT END OF REPORT DERIOD. ESTIMATED DATE OF STARTU":
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITV MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 PAGE 2 OF 2
_ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ -. . . _ _ _ . _ _ . . . , . . . . . - . , - _. , , . . . _ ~ . - . - . . . - . , ..- . , , . . . . - . _ . , . . . . _ ._ . ..__s
I e-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352 .
UNIT NAME LIMERICK UNIT 1 DATE JUNE 09 1995 .
REPORT MONTH MAv. 1995 COMPLETED BV PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 l l UETHOD OF l LICENSEE SYSTEMLCOMPONENTl CAUSE AND CORRECTIVE l TYPE DURATION REASON 15 HUTTING DOWN! EVENT CODE CODE I ACTION TO NO.l DATE (1) (HOURS); (2) l REACTOR (3) l REPORT a (4) (5) i PREVENT RECURRENCE I I I i l 64 1 950507 l 5 000.0 B 4 l N/A HA VALVEX l REACTOR POWER WAS REDUCED TO 90.0% FOR 4 l l l MAIN TURBINE VALVE TESTING. 4 I I I 65 950507 5 099.4 ] B 2 N/A HH HTEXCH l REACTOP WAS SHUTDOWN TO PERFORM MAINT. 4 I ON "C" DRAIN COOLER. "A" RECIRCULATION 4 PUMP SEAL. AND THE CONDENSER WATERBOXES. 4 4
4 l 99.4 l (1) (2) (3) (4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS 5 - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE l
- , - - ~ - -- -.
- n. .
Docket No. 50-353 j Attachment to Monthly Operating Report for -
May 1995 Limerick Generating Station !
Unit 2 May 1 through May 31,1995 j
- l. Narrative Summary of Operating Exoeriences i
i Unit 2 began the month of May at a nominal 100% of rated thermal power (RTP). !
On May 6,1995, at 0020 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />, power was reduced to 90% RTP for a control rod pattom i adjustment. Power was restored to 100% RTP at 0338 hours0.00391 days <br />0.0939 hours <br />5.588624e-4 weeks <br />1.28609e-4 months <br />.
On May 15,1995, at 1125 hours0.013 days <br />0.313 hours <br />0.00186 weeks <br />4.280625e-4 months <br />, power was reduced due to high turbine backpressure Power was reduced to 91.5% RTP. Power was restored to 100% RTP at 1945 hours0.0225 days <br />0.54 hours <br />0.00322 weeks <br />7.400725e-4 months <br />.
On May 16,1995, at 1411 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.368855e-4 months <br />, power was reduced due to high turbine backpressure Power i was reduced to 96% RTP, Power was restored to 100% RTP at 2025 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.705125e-4 months <br />. -
On May 17,1995, at 1446 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.50203e-4 months <br />, power was reduced due to high turbine backpressure. Power was reduced to 90% RTP. Power was restored to 100% RTP at 2135 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.123675e-4 months <br />. t On May 18,1995, at 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />, power was reduced due to high turbine backpressure. Power was reduced to 96.5% RTP. Power was restored to 100% RTP at 1950 hours0.0226 days <br />0.542 hours <br />0.00322 weeks <br />7.41975e-4 months <br />. ;
Unit 2 ended this operating period at 100% of R1P.
f II. Challenges to Main Steam Safety Relief Valves ;
There were no challenges to the Main Steam Safety Relief Valves during the month of May.
1 P
I l
4 1
i
'o QVEROGE DOILY UNIT POWER LEVEL .
DOCKET NO. 50 - 353 UNIT LIMERICK UNIT 2 DATE JUNE 09. 1995 COMDANY PECO ENERGY COMPANY DAVID R. HENRICKS REPORT 5 ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772 MONTH MAY 1995 DAY AVERAGE DAILY POWER LEVEL DAV AVERAGE DAILY power LEVEL (WWE-NET) (MwE-NET) 1 1122 17 1081 2 1125 18 1094 3 1117 19 1122 4 1117 20 1114 5 1118 21 1118 6 1103 22 1127 7 1109 23 1123 8 1119 24 1114 9 1116 25 1119 10 1111 26 1121 11 1107 27 1122 12 1109 28 1127 13 1110 29 1114 14 1117 30 1114 15 1085 31 1125 10 1106
. _ . . , . . . . .. -- _ ,-- -. -- .-. -m, - -- .- - -- .--- -- . _ __ - - - - -
OPERQTING DaTo REPORT .
DOCMET NO. 50 - 353 DATE JUNE 09, 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 710-3772 OPERATING STATUS
- 1. UNIT NAME: LIMERICK UNIT 2 l NOTES: THERE wERE NO LOAD DROPS I l t
- 2. REPORTING PERIOD: MAv. 1995 GREATER THAN 201f. THIS MONTH. i l
- 3. LICENSED THERMAL POWER (wwT): 345B l 4 NAMEPLATE RATING (GROSS MwE): 1163 I i
__________ _ ; l S. DE$1GN ELECTRICAL RATING (NET MWE): 1115 l l
______... s
- 6. MAXINUM DEPENDABLE CAPACITY (GROS 5 MwE): 1155
- 7. max!NUM DEPENDABLE CAPACITY (NET MWE): 115 B. IF CMANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH v7-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 744 3.623 47.279
- 12. NUMB ER OF HOURS REACTOR WAS CRITICAL 744.0 3.103.4 42.466 4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 744.0 2.995.8 41.600.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGv GENERATED (MwH) 2.564.933 9.073.472 131.303.055 17 GROSS ELECTRICAL ENERGY GENERATED (MwH) 856.000 3.015.900 43.399.480
- 18. NET ELECTRICAL ENERGY GENERATED (MWM) 828.631 2.910.017 41.812.217 PAGE 1 OF 2
?
OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 353 ,
DATE JUNE 09 1995 l THIS MONTH VP-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 82.7 88.0
- 20. UNIT AVAILABILITY FACTOR 100.0 82.7 88.0 21 UNIT CAPACITV FACTOn (USING WDC NET) 99.9 72.6 83.6
- 22. UNIT CAPACITV FACTOR (USING DER NET) 99.9 72.6 83.6
- 23. UNIT FORCED OUTAGE RATE O.0 2.6 3.4 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: '(
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/
. ---..'J B / 9 0 PAGE 2 OF 2
_ _ _ _ _ _ . _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . __ _ . . . _ _ . _ . - . . . . - . _ . . - - . - , _ _ _ .s
UNIT SHUTDOONS QND POWER REDUCTIONS DOCnET NO. 50 - 353 . - b-UNIT NAME LIMERICM UNIT 2 DATE JUNE 09 1995 REPORT WONTH MAY. 1995 COMPLETED BY PECO ENERGY COMPANY DAVID R. HENRICKS REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3772
.___.._---__-.________._-. -_-_...__.....__________ ..._________._-_______.___-~__-___.____..-________..__ __.___......._.._.
i l i l l METHOD OF l LICENSEE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE l lTVPElDURATIONlREASONj$ HUTTING DOwn! EVENT l CODE CODE l ACTION TO NO.l DATE i (1)) (HOURS){ (2) i REACTOR (3) l REPORT
- 1 (4) (5) I PREVENT RECURRENCE i I ! I i 1 49 950506 1 5 000.0 i B 4 i N/A RB CONROD 1 REACTOR POWER WAS REDUCED TO 90% DUE TO 4 1 1 l l CONTROL ROD PATTERN ADJUSTMENT 4 1 1 1 50 - 9505t5 1 5 000.0 i B . 4 l N/A HC HTEXCH REACTOR POWER wAS REDUCED TO 92% DUE TO 4 i i ! l l l H C.H TURBINE BACK PRES 5URE. 4 l 1 l l t 51 1 950516 l 5 000.0 B l 4 l N/A HC l HTEXCH REACTOR POWER WAS REDUCED TO 96% DUE TO 4 l l l l HIGH TURBINE BACk PRESSURE. 4 i l I 52 950517 i S i 000.0 B l 4 l N/A HC HTEXCH . REACTCR POWER WAS REDUCED TO 90% DUE TO 4 l l l 1 l HIGH TURBINE BACk PRESSURE. 4 I I 1 ! l 53 l 950518 I 5 000.0 B l 4 N/A i HC HTEXCH I REACTOR POWER WAS REDUCED TO 97% DUE TO 4 i i ! HIGH TURBINE BACK PRESSURE. 4 i ! 4 I i 4 I l l l 4 I I I ----- ! ,
1 I I - l 1. l I (1) (2) (3) (4)
F - FORCED REASON METHOD EX4IBIT G- INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONA. ERROR (EXPLAIN)
H - OTHER(EAPLAIN) EXHIBIT I - SAME SOURCE
__- -_ - - _ - _ - - - - - -. . . - .-- - _. - .. - -