Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML042950493 +
- ML032481206 +
- ML20059D735 +
- ML20077S219 +
- ML20077N827 +
- ML20094Q646 +
- ML20072U428 +
- ML20134E121 +
- ML20129A827 +
- ML20198Q439 +
- ML20207C293 +
- ML20206R987 +
- ML20214C805 +
- IA-87-589, Package of Documents Re 870101 Plant Trip,Including Region III Daily Rept for 870102,plant Daily Status Rept for 870102 & Main Feedwater Pump Turbine Rept +
- ML20215F572 +
- ML20235G662 +
- 2CAN108607, Monthly Operating Rept for Sept 1986 +
- ST-HL-AE-3128, Special Rept:On 890523,24 & 0608,diesel Generator 13 Tripped During Testing Procedures.First Failure Caused by Increased Resistance Across Contacts of Unit Parallel Mode & Second & Third Failures by Inadequate Air Flow.Contacts Cleaned +
- ML22179A336 +
- ML23024A143 +
- ML24008A105 +
- ML24208A038 +
- 05000368/LER-1986-011, :on 860924,reactor Tripped Form 100% Power on High Reactor Coolant Sys Pressure Following Main Turbine Trip.Incorrectly Assembled Valve Believed to Be Contributing Factor.Valve Reassembled Properly +
- 05000331/LER-1986-024, :on 861121,HPCI Sys Isolation Valve Closed Due to Signal from HPCI Steam Line High Flow Pressure Differential Indicating Switch PDIS2245.Caused by Moisture Shorting Out Terminals in Switch +
- 05000382/LER-1985-010, :on 850321 & 22,unit Changed Modes After Two Reactor Trips W/Inoperable Hydrogen Analyzer & Subsequent Surveillance on ex-core Nuclear Instrumentation Not Performed.Caused by Loss of Feedwater Flow +
- 05000311/LER-1984-016-01, :on 840705,leak Discovered on Common Suction Line to Charging Pumps.Caused by 3-inch Crack in Schedule 10 Suction Header Pumping Originating in Toe of Weld.Unit Shutdown Initiated.Piping Replaced +
- 05000265/LER-1983-010-03, /03L-0:on 830623,while Performing Standby Gas Treatment Sys Operability Test,Heater Did Not Start Automatically When Train 1/2A Started.Caused by Heater High Temp Switch Trip Due to Incorrect Setpoint +
- 05000277/LER-1991-002-02, :on 910121,RHR Sys Shutdown Cooling Isolation Occurred When Sys Blocking Permit for ADS Applied During Refueling Outage.Caused by Poor Drawing Legibility.Drawing Enhanced & Blocking Permit Rewritten +
- 05000498/LER-1990-021, :on 900909 Unplanned ESF Actuations of Control Room,Reactor Containment Bldg & Fuel Handling Bldg HVAC Sys Occurred Due to Loss of Power of Radiation Monitors +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- GO2-87-294, Responds to NRC Re Violations Noted in Insp Rept 50-397/87-27.Corrective Actions:Overtime Control Directive Rev & Other Plant Procedures Review & Rev Planned.Full Compliance Expected by 880229 +
- U-604333, Regarding Residual Heat Removal (RHR) C Pump Failure During Surveillance Testing as a Result of Breaker Latch Check Switch Adjustment Results in a Condition Prohibited by Technical Specification +
- 05000255/LER-2010-001, Regarding Potential Loss of Safety Function Due to a Service Water Pump Shaft Coupling Failure +
- ML20136E548 +