Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML110800666 +
- ML18107A720 +
- ML18331A291 +
- 05000311/LER-1981-006, Forwards LER 81-006/03L-0.Detailed Event Analysis Encl +
- ML20029E463 +
- ML19345D655 +
- ML030770619 +
- ML042080433 +
- ML021060107 +
- ML020650006 +
- ML20079C136 +
- ML20099E635 +
- ML20090D392 +
- ML20072S560 +
- ML20195C977 +
- L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with +
- ML22243A007 +
- 05000269/LER-1997-011-01, :on 971228,initiated Shutdown Due to Calculated 404 Gallons Per Day SG Leak.Caused by Inadequate Process Control.Repaired Leaks +
- 05000368/LER-1988-007, :on 880423,inadvertent Plant Protection Sys (PPS) Actuation Occurred When Maint Technician Deenergized Power Supply to Sys.Caused by Personnel Error.Technician Reset PPS & Counseled +
- 05000352/LER-1992-001-02, :on 920129,high Toxic Chemical Concentration Alarm Received in Main Control Room.Caused by High Vinyl Chloride Concentration in Outside Air Intake Plenum.No Corrective Actions Necessary +
- 05000271/LER-1995-011, :on 950420,RPS MG Set B Output Breaker Trip Occurred Due to Setpoint Drift of Overvoltage Relay Trip Card.Replaced Overvoltage Relay +
- 05000499/LER-1991-006-01, :on 910516 & 21,control Room Ventilation Sys Actuated to Recirculation Mode Due to Supurious Trip from Toxic Gas Analyzer.Possibly Caused by Poor Electrical Connection on Circuit Chips.Chips Reseated +
- 05000334/LER-1990-017-01, :on 901027,auxiliary Bldg Ventilation Relignment Occurred Due to Radiation Monitor Alarm +
- 05000334/LER-1990-017, :on 901027,ESF Actuation - Radiation Monitor Alarm Caused Auxiliary Bldg Ventilation Realignment +
- 05000254/LER-1992-007-11, :on 930624,Toxic Gas Analyzer Inoperable Due to Personnel Error Caused by Lack of Procedural Adherence. Isolated CR Ventilation,Restarted Sample Pump & Restored CR Ventilation Sys to Outside Air Suction +
- IR 05000440/1990010 +
- BECO-90-075, Monthly Operating Rept for May 1990 for Pilgrim Nuclear Power Station +
- 05000311/LER-1990-005, :on 900117,Tech Spec Action Statement 3.0.3 Entered Due to Inoperability of Two High Head ECCS Subsys. Caused by Leak from Welded Pipe Cap on Boron Injection Tank. Pipe-to-cap Socket Welded Joint Repaired +
- ML20083M348 +
- 05000334/LER-1989-014-01, :on 891108,routine Radiation Barrier Check Identified Faulty Door Locking Mechanism on North Door to East Valve Trench Area.Caused by Welded Latching Mechanism. Locking Mechanism Modified +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000281/LER-2011-003, Regarding Isolation of Main Feedwater Pump Results in Auxiliary Feedwater Actuation +