- ENS 42317 +
- 05000272/LER-2001-006 +
- ML16202A040 +
- ML16034A358 +
- 05000311/LER-1988-017-01, :on 880831,reactor Trip Occurred After Turbine Trip as Result of Steam Generator hi-hi Level.Caused by Design/Equipment Problem Associated w/23BF19 Valve.Maint Requirements Will Be Modified +
- ML18093A767 +
- ML18219D979 +
- ML20093K735 +
- ML20093A251 +
- ML20135F646 +
- IR 05000255/1985021 +
- ML20133G419 +
- BVY-94-101, Monthly Operating Rept for Sept 1994 for Vermont Yankee Nuclear Power Station +
- ML20199G259 +
- B13688, Responds to NRC Re Violations Noted in Insp Rept 50-423/90-19.Corrective Actions:Fire Door Placed in Closed Position & Vendor Fire Watch Supervisor Control Responsibilities Reemphasized +
- ML20216F492 +
- L-99-126, Monthly Operating Repts for Jul 1999 for Beaver Valley Power Station,Units 1 & 2.With +
- ML23072A435 +
- ML23256A171 +
- 05000414/LER-1986-023, :on 860603,main Feedwater Isolation Occurred During Testing of Solid State Protection Sys When Reactor Trip Breaker Placed in Test Position & Closed.Caused by Personnel Error.Isolation Signal Reset +
- 05000440/LER-1996-005, :on 960530,automatic Reactor Scram Occurred. Caused by Auxiliary Transformer Failure.Replaced Failed Auxiliary & Load Center Transformers +
- 05000374/LER-1991-004-07, :on 910617,reactor Bldg Ventilation Sys Inboard Isolation Dampers Discovered Closed.Caused by Inadvertent Mechanical Shock.General Information Notice 91-046 Issued to Tailgate Maint Personnel +
- 05000440/LER-1993-012, :on 930607,noted That HPCS Initiation Signal Resulted in Auto Start of Div 3 DG & ESW Sys.Caused by Failure of Div 3 Reserve Battery Charger.Procedures Used for Insp & Maint of Battery Being Modified +
- 05000266/LER-1982-003-01, /01T-0:on 820217,during Surveillance Testing, Emergency Diesel Generator 3D Failed to Operate.Caused by Sticking Shutdown Solenoid Plunger on Woodward Type UG8 Governor.Solenoid Cleaned,Checked & Generator Tested +
- 05000278/LER-1989-005-03, :on 891020,reactor Protection Sys Actuation & Primary Containment Isolation Sys Actuation Occurred Due to False High Reactor Pressure Signal & lo-lo Reactor Vessel Level Signal,Respectively.Caused by Spike +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000277/LER-2019-001, Regarding Emergency Bus Breaker Relay Failure Results in Loss of Safety Function +
- IR 05000315/1990016 +
- 05000237/LER-1988-004-02, :on 880221,inoperable CRD E-9 Found Electrically Armed Due to Personnel Error.Crd Disarmed & out-of-svc Card Hung on Hydraulic Control Unit.Event Discussed W/Personnel at Weekly Meeting +
- L-97-040, Monthly Operating Repts for Sept 1997 for Bvps,Units 1 & 2 +
- 05000325/LER-1993-008, :on 930313,severe Winter Storm Resulted in Spurious ESF Actuations & Loss of Offsite Power.Failed Cellon-treated Douglas Fir Poles Compromising Structure 10 Replaced W/Steel Poles +