Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 40905 +
- 05000254/LER-2006-002, Automatic Reactor Scram from Turbine/Generator Load Reject Due to Degraded Current Transformer Wiring on the Main Power Transformer +
- IR 05000440/2011005 +
- ML15282A240 +
- NL-15-169, Browns Ferry, Units 1, 2, and 3, Startup Test Plan +
- AEP-NRC-2014-89, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events +
- ML19318A403 +
- ML20062G241 +
- ML20100R429 +
- ML20098E001 +
- ML20114A520 +
- IR 05000271/1985099 +
- ML20205D761 +
- ML20204H430 +
- ML20204F922 +
- ML20244B505 +
- ML20211M608 +
- 05000499/LER-1989-016, :on 890602,reactor Trip Occurred on Completion of Two Out of Four Logic for Closed Turbine Inlet Throttle Valves.Caused by Deficient Test Procedure.Turbine Inlet Valve Test Procedure Revised.Part 21 Related +
- 05000461/LER-1987-022, :on 870407,three Level Instruments Actuated on Creation of Pressure Transient.Caused by Personnel Error While Venting Instrument Process Lines.Personnel Retrained & Appropriate Procedural Guidance Developed +
- 05000244/LER-1986-004, :on 860729,reactor Tripped Manually When Large Steam Leak Discovered in Turbine Bldg.Caused by Leak in Pipe Elbow on Moisture Separator Reheater Drain Line 2A.Elbow Replaced & Tested Satisfactorily +
- 05000413/LER-1985-024, :on 850409,Train B of Ventilation/Chilled Water Sys Became Inoperable Due to Failure of Filter Unit Preheater to Energize.On 850412,both Trains of Same Sys Inoperable for Several Hours +
- 05000423/LER-1990-016, :on 900513,steam Generator B lo-lo Signal Generated Reactor Trip Signal,Causing Automatic Start of motor-driven Auxiliary Feedwater Pumps a & B.Caused by Inadequate Guidance.Procedure Revised +
- 05000254/LER-1990-002-05, :on 900204,determined That Only Reactor Bldg Differential Pressure of 0.24-inch Water Vacuum Could Be Obtained,In Violation of Tech Spec Required 0.25 Inch.Caused by Testing Deficiency.Leak Paths Sealed +
- ML19344E393 +
- ML19337A508 +
- ML20127M333 +
- ML19305E748 +
- ML19298C513 +
- 05000311/LER-1989-003-01, :on 890205,unit Experienced Rx Trip on Steam Generator 23 Low Level Concurrent W/Steam Flow/Feed Flow Mismatch.Caused by Inadequate Procedures Associated W/ Operating Plant.Procedure AOP-COND-2 Revised +
- 05000296/LER-1996-002-04, :on 960421,unit Scrammed Following Loss of Reactor Feed Pump 3C.Caused by Personnel Error.Personnel Stabilized Reactor,Reactor Feed Pump 3C Isolated & Reactor Feed Pump 3C Oil Tank Refilled +
- IR 05000244/1986011 +
- 05000244/LER-2016-001, R. E. Ginna Nuclear Power Plant Regarding Loss of Station Auxiliary Transformer 12A Resulting in Automatic Start of Emergency Diesel Generator a Due to Undervoltage Signals to Safeguards Buses 14 and 18 +
- 05000374/LER-2015-001, Regarding High Pressure Core Spray Inoperable Due to Division 3 Diesel Generator Cooling Water Pump Casing Leak +
- 05000440/LER-2011-003, For Perry Nuclear Power Plant Unit 1, Regarding Switchyard Configuration During Startup Results in Operation Prohibited by Technical Specifications +
- 05000259/LER-2009-001, Turbine Trip and Reactor Scram Due to Power Load Unbalance Signal on Main Generator +
- ML19305E734 +
- ML19318B125 +
- ML20049J384 +
- ML20136E548 +
- 05000414/LER-1991-007-01, :on 910510,tech Spec 3.0.3 Entered as Result of Both Trains of Auxiliary Building Ventilation Filtered Sys Being Inoperable.Caused by Inappropriate Action Due to Lack of Attention to Detail +