Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15182A012 +
- ML15069A232 +
- ML12214A276 +
- 05000388/LER-2017-006 +
- ML11319A213 +
- L-03-107, June 2003 Monthly Operating Report for Beaver Valley, Units 1 & 2 +
- ML031750587 +
- NL-03-083, April 2003 Monthly Operating Report for Indian Point 3 +
- NL-03-063, March 2003 Monthly Operating Report for Indian Point 3 Nuclear Power Plant +
- ML20083L236 +
- ML20081F149 +
- ML20099F350 +
- ML20092M904 +
- ML20084H527 +
- ML20117C333 +
- ML20116P018 +
- ML20133G016 +
- ML20150A629 +
- ML20207J146 +
- ML20248J422 +
- ML20235J465 +
- ML24194A018 +
- ML24194A014 +
- ML24012A205 +
- ML24012A207 +
- IR 05000352/1986099 +
- 05000461/LER-1987-010, :on 870308,main Control Room Ventilation Sys Train a Shifted to High Chlorine Mode on Signal from Chlorine Detector OXE-VC018B.Caused by Discolored Chlorine Sensitive Tape.Maint Work Request Written +
- 05000412/LER-1988-013-01, :on 880920,during Surveillance Procedure, Overpower Delta T Channel Tripped.Caused by Faulty Lead/Lag Circuit Card.Emergency Operating Procedures Utilized to Stabilize Plant in Hot Shutdown +
- 05000265/LER-1993-002, :on 930113,nuclear Station Operator Tripped Turbine & Noticed Motor Speed Charger Light Indication Remained Lit at High Speed Stop.Caused by Dirty Contacts in Pressure Switch.Hpci Declared Inoperable +
- 05000219/LER-1983-017-01, /01T-0:on 830826,arming Relay for Diesel Generator Protective Relay Set at Value Possibly Causing Breaker to Open During Fast Start.Caused by Design Deficiency.Setting Changed +
- 05000254/LER-1991-009, :on 910427,Unit 1 RCIC Declared Inoperable Due to Failure to Meet Pump Requirements.Caused by Inadequate Calibr Procedure.Egm Controller & Governor Calibr,Changing Sys Parameters.Sys Declared Operable 910503 +
- BECO-LTR-93-061, Monthly Operating Rept for Apr 1993 for Pilgrim Nuclear Power Station +
- 05000334/LER-1980-109-03, /03L-0:on 801208,axial Flux Difference Increased Above Target Band.Caused by High Initial Second Fuel Cycle 100% Target Flux Value.Target Flux Value Lowered +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000272/LER-1988-020, :on 861108,Tech Spec Surveillance 4.7.7.1.a Not Completed within Specified Time.Caused by Personnel Error.Supervisors Counseled About Failure to Take Necessary Steps to Ensure Performance of Surveillance +
- 05000397/LER-1992-037, :on 920815,reactor Manually Acrammed Due to Indications of Core Instability.Caused by Unanticipated Interaction of Operating Conditions & Components.Revised Operating Strategies & Related Procedures +
- GO2-93-008, Responds to NRC Re Violations & Deviations Noted in Insp Rept 50-397/92-37.Corrective Actions:Supply Sys Design Reviews Will Be Expanded to Provide Addl Oversight of Vendor Reload & Analysis +
- 05000387/LER-1917-006, Regarding Secondary Containment Declared Inoperable Due to Trip of Zone II Exhaust Fan +
- 05000293/LER-2008-003, Regarding RCIC System Declared Inoperable During Surveillance Testing Due to Procedure Error +
- ML20214V454 +