Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000440/LER-2001-001 +
- Press Release-I-10-021, NRC to Hold Open House, Public Meeting on April 22 in Waterford, Conn. to Discuss Annual Assessment of Millstone Nuclear Power Plant +
- ML20012C529 +
- ML060720293 +
- ML060680596 +
- ML18255A004 +
- ML19325D165 +
- ML19114A414 +
- ML20100H077 +
- ML20117M209 +
- IR 05000354/1987023 +
- IR 05000354/1985035 +
- IR 05000302/1981023 +
- 05000298/LER-2024-001, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications +
- 05000334/LER-1989-007-01, :on 890518,electrical Supply Breaker to ATWS Mitigating Sys Actuation Circuitry Panel Accidentally Opened.Caused by Design Deficiency.Deficiency Corrected by Modifying Process Instrumentation Circuitry +
- 05000413/LER-1986-050, :on 860916,fuel Pool Ventilation Sys Inoperable.Caused by Blocked Open Doors.Reinforced Polyethylene Sheets Installed Over Vents & Doors Ax 6350 & CAD 612 Closed to Restore Sys Operability +
- 05000219/LER-1986-032, :on 861224,reactor Trip Occurred Due to High Neutron Flux Condition.Caused by Personnel Error & Configuration W/Respect to Feedwater Control Sys.Event Reviewed W/Each Oncoming Shift +
- 05000312/LER-1988-014, :on 881025,Tech Spec Required Shutdown Due to RCS Leakage.Caused by Degradation of Two Valves Due to Svc in Rcs.Rcs Repaired by Seal Welding body-to-bonnet Joint, Then Injecting Valve W/Leak Sealant +
- 05000461/LER-1994-007, :on 940808,identified That Section 8.3 of Surveillance Test CPS 9031.14 Not Completed Prior to Entry Into Startup Mode Due to Inattention to Detail.Section 8.3 of Surveillance Test CPS 9031.14 Completed +
- ML20046D396 +
- 05000334/LER-1980-117-03, /03L-0:on 801218,during Physics Testing,Delta Flux Left Low Side of Target Band When Power Decreased Rapidly.Caused by Rapid Insertion of Control Rods During Power Decrease.Rods Partially Borated Out of Core +
- ML20002B334 +
- 05000395/LER-1989-017, :on 890918,responsible Engineer Reviewed Plant Parameters & Concluded That Initial Conditions Required by Surveillance Test Procedure 209.001 Not Satisfied.Caused by Personnel Error & Procedural Inadequacy +
- 05000280/LER-1991-016-01, :on 910811,two Main Control Room/Emergency Switchgear Room Chillers Determined Inoperable.Caused by Inoperable Thermostat & Chiller Svc Water Pump.Thermostat Replaced on Chiller a +
- ML19199A709 +
- IR 05000528/2006003 +
- ML19308C918 +
- ML20236B100 +
- 05000331/LER-1994-008, :on 940517,determined That Testing Had Not Been Performed at Required Surveillance Frequency for Reactor High Pressure Scram Pressure Switch.Caused by Inadequate Tracking.Appropriate Half Scram Inserted +