Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345F579 +
- ML19347F144 +
- ML20137U070 +
- ML20248J230 +
- IR 05000237/1986028 +
- ML20210L497 +
- 1CAN098506, Monthly Operating Rept for Aug 1985 +
- 05000311/LER-1989-013, :on 890610,reactor Trip Manually Initiated Due to Loss of Main Condenser on High Back Pressure.Caused by External Elements & Inadequate Corrective Action.Review of Preventive Maint History Conducted +
- 05000249/LER-1986-022-06, :on 861222,one of Two Fuel Pool Floor Radiation Monitors on Side of Refuel Floor of Reactor Bldg Spuriously Spiked Causing Automatic Start of Standby Gas Treatment Sys. Caused by Failed Radiation Monitor +
- 05000461/LER-1999-002, :on 990106,loss of Offsite Power to SR Electrical Buses Was Noted.Caused by Offsite Fault on in Service Offsite Electrical Supply Line.Repairs Were Made to Faulted Line & Leaning Support Structure.With +
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed +
- 05000325/LER-1991-005, :on 910227,nonconservative Setpoint for High Steam Flow Isolation Instruments Resulted in Manual HPCI Isolation.Due to Error Induced by Formation of Loop Seals. Pressure Sensing Line Rerouted +
- 05000346/LER-1990-007, :on 900403,inadvertent,inconsequential Safety Features Actuation Signal Occured While Defueled.Caused by Incidental Contact W/Monitor in Containment.Temporary Barriers Built Around Monitors +
- ML19351E174 +
- 05000260/LER-1993-004-02, :on 930511,uplanned Actuation of ESF Including RPS Actuation Occurred When High Rv Pressure Signal Initiated Anticipated Trip W/O Scram Signal.Reactor Pressure Stabilized & Personnel Involved Counselled +
- 05000244/LER-2016-001, R. E. Ginna Nuclear Power Plant Regarding Loss of Station Auxiliary Transformer 12A Resulting in Automatic Start of Emergency Diesel Generator a Due to Undervoltage Signals to Safeguards Buses 14 and 18 +
- ML17252A654 +