Text
m e f.
i s
NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE NOVEMBER 1985 November 1 At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on November 1, the power level was through reduced to perform maintenance on the Main Feed November 3 Reg. Valves (FCV-FW-498 -488, &.-478).
On November 2 at 2306 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.77433e-4 months <br />, the Station was taken i
off-line and entered Mode 3 at 2345 hours0.0271 days <br />0.651 hours <br />0.00388 weeks <br />8.922725e-4 months <br />.
November 3 At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> while prepari ng to' take the reactor' critical, the Demand Counter for Group 2 0 Bank worked improperly and a Unit Off-Normal Report was issued. At 0625 hours0.00723 days <br />0.174 hours <br />0.00103 weeks <br />2.378125e-4 months <br /> the' reactor was taken critical.
' November 4 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> on November 4. Maintenance completed through work on the Main Feed Reg. Valves (FCV-FW-498. -488, November 8 and -478).
At 2256 hours0.0261 days <br />0.627 hours <br />0.00373 weeks <br />8.58408e-4 months <br /> on the 4th, the Station was synched to the grid. The Station was in Operational Mode I with the reactor power at a i
nominal 100 percent with the Reactor Coolant System at normal operating pressure and temperature.-
November 9 At 0412 hours0.00477 days <br />0.114 hours <br />6.812169e-4 weeks <br />1.56766e-4 months <br /> on November 9, the power level was reduced to perform maintenance on the Heater. Drain Tank Normal Level Control Valve (LCV-SD-1068). At 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br /> on the ninth, an additional power reduction occurred to perform maintenance on a Main Feed Reg Valve (FCV-FW-488). At 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br />, Maintenance was completed on the Main ' Feed Reg Valve and power ascension to a nominal 100 percent started.
November 10 The Station was'in Operational Mode.1 with reactor power through at a nominal 100 percent with the Reactor Coolant November 30 System at a normal operating pressure and temperature.
8602190047 351 PDR ADOCK 0 R
. _ TEM
]/,
1
.-.- ~
OPERATING DATA REPORT DOCKET NO. 50-334 DATE 12/9/85 COMPLETED SY R.N.Boyle TELEPHONE. a17-6&sI825 OPERATING STATUS
- 1. Unit Name: Beaver Valley Power Station, Unit il Notes
- 2. Reporting M.
November 1985
- 3. Licensed Thermal Power (MWt):
7AAo l
- 4. Namepiste Rating (Grom MWe):
923 835
- 5. Dougn Electrical Racing (Net MWe):
i
- 6. Maximum Dependable Capacity (Cross MWe):
860 i
- 7. Maximum Dependable Capacity (Net MWe):
810 j
- 8. If Cheapes Occur in Capac:ty Ratings (1: ems Number 3 Through 7) Since Last Report, Give Reasons:
i o.
- 9. Power Level To Which Restricted. If Any (Net MWe):
None
~10. Reasons For Restrictions. If Any; N/A i
i Dis Meath Yrto.Dete
" Cumulative
!!. Hours la Reporting Period 720.0 8,~016. 0 84,024.0
- 12. Number Of Hours Reactor Was Critical 713.3 7,501.3 44,857.0 i
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 4,482.8
- 14. E.urs Generator On-Line 672.2 7,307.9 43,390.8 l
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1.668.503.2 17.673.069.1 101.071.583.1 4
- 17. Gross Electrical Energy Generated (MWH) 529.000.0 5.653.000.0 32,147,400.0 i
- 18. Net Electrical Energy Generated (MWH) 498,170.0 5.301.640.0 29.926.483.0 I
- 19. Unit Service Factor eta 91.2 54.1
- 20. Unit Availability Factor 93.4 91.2 54.1
- 21. Unit Capacity Factor (Using MDC Net) 85.4 81.7 47.5 7
- 22. Unit Capacity Factor (Using DER Net) 82.9 79.2 46.1
- 23. Unit Forced Outage Rate 6.6 7.8 24.2 i
- 24. Shutdowns Scheduled Over Next 6 Months tType.Dete.and Duration of Each t:
FIFTH REFUELING, May 19, 1985 Scheduled 93 days l
J
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units la Tes Status iPrior to Commercial Opmtion):
Foresset Achieved
}
INITIAL CRITICALITY N/A M/A
}
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
(9/77) i
i k
UNITSHU1 DOWNS ANDPOWER REDUCTIONS DOCKET NO.
50-314 UNIT NAME BVPS Unitt. #1 DAIE - 12/9/s5 N vember COMPLETEll ey R.N.
Boyle REPORT MONIH TELErt10NE (412)643-1825
'~l.
1 gn
% 60 o O
- 0 0t Licensee E*
Cause & Corrective No.
Date
=E E
3UE Event 0.
Action to y
j5 "j"
Report #
j]
gu Prevent Recurrence cn 39 851101 F
0 B
4 N/A CH VALVE 1 At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />, power level was l
reduced to perform anaintenance on Main Feed Reg. Valves [FCV-FW-498, -488, and -478].
2 40 851102 F
47.8 B
1 N/A CH VALVEI At 2306 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.77433e-4 months <br />, Station off-line to complete snaintenance on Main Feed Reg.
Valves [FCV-FW-498, -488, and -478].
The Station returned on-line at 2256 hours0.0261 days <br />0.627 hours <br />0.00373 weeks <br />8.58408e-4 months <br /> on the 4th.
1 41 851109 F
0 B
5 N/A HH VALVEX At 0412 hours0.00477 days <br />0.114 hours <br />6.812169e-4 weeks <br />1.56766e-4 months <br /> power level was reduced i
to perform waintenance on Heater Drain Tank level Control Valve
[LCV-SD-106Bl.
4 1
2 i
3 4
F: F.us ed Reasues:
Hethod:
I:mholus G - Inssius si ms S Scheduecil A Fetuspatens Failuse(I.mplaint g.es.nua t f.n roepasasi.m..e Data 8 Maineennece ei Test 2-stanual scree
- 1. nee, sheets I.w Ikensee C stefweling 3-Automatic Scram Fsene Rep.us el I Hll sic INilRI G 4
D Repslagen) Restsicaissa 4-Continued From Previous Month Ultsil 1 Opesaeau Toaineseg A Ikesese I:saseeistasiasse 5.Roductton I - Admenusseative 9-Other 5
G Opcessounal I sein 11 aplaint I sh.his I - Sanic %=n c I
rt/77)
H Hohee glNplaing l
e-
= - - _._.
1
'I UNIT SHU1 DOWNS AND POWER REDUCTIONS DOCKETNO.
50-314 UNIT NAME 8VPS U881L Il DATE n/e/as REPORT MONIH Noveember COMPLETEls my R.W. Sovie l
TELEPHONE (412) 643-1sz5' t
m 5.*
cn
% MO o*
N, Gt Licensee Cause & Corrective O
No.
Date "e,
E 3Ul Event lg eo Action to 3
j5 j
j j
Report #
p ju Prevent Recurrence t
0 ca 42 851109 F
0 B
5 N/A CH VALVEI At 0602 hours0.00697 days <br />0.167 hours <br />9.953704e-4 weeks <br />2.29061e-4 months <br />, power level was reduced to perform maaintenance on Main Feed Reg Valve [FCV-FW-488].
Maintenance was completed at 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br />.
1 1
1 2
3 4
F: F.w ed Reasnes:
n.ched:
1:mhebes G-lassnestiewis s
1 5 5(hedu eil A Fegaspeseene Failure (f.mplaini 1-Manual l'on Psepasasi.we os pasa s
B-Maisseenance si Tes8 2-Manua1 scree l-neen Slweis I w l*rusec t
-)
0-Refuellas 3-Automatic scree Fsent Rep.we 18 i Hil ele iNilRI(
i~
D Repeelaten) Resseiceiun 4-Continued From Previous nonth 01483 I thaceatne Toainisig A liessse I'manuseasi""
5-meeuctton 1 Adneenisseative 9-Other 5
G thaceassensal I seems ll'aplaini i shehit 1 Sauer Snesse r8/77) ll Helece llNplainI e-
+
n.
' g.. :.,.
AVERAGE DAILi UNIT POWER LEVEL r-j
+
50-334 4
DOCKETNO.
)
~
' UNIT,
3V?5 Uni: #1 DATZf,,12/9/85.
COMPLETED BY,' R 8 8871*
\\
TAONE,, (412) 643-1825 e
i NOVD!P3ER MONTH DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(M w. m ap 582 ; '-'
790 1
37 172 790 7 3
18 i
0
' ' ~
3 39 '
7Pd 790#
4 20 709 789 3
gg 2
9 788 6
n-79g 746-7
,3 871 790 g
74 -
338 787 7
9 25 789 10 26
.787 788 il 27 790 828 12 3
788 789 13 788 p'
'787 34 30 7M N/A 13 3y i
le 7"
\\
. t.5 5
INSTRUCTIONS
~*
1 On this format.!ist the average daily unit power Ine! in Mwe. Net for each day in the reputting nwash. Compute to the ne: rest whole mepwatt.
i
($3.I77) l
}*
(
MAJOR MAINTENANCE
~
~
l'.
Repair of Main Feed Reg. Valves (FCV-FW-498, -488, and -478)..
2.
Repair of diaphragm on Heater Drain Tank Level ~ Control Valve (LCV-SD-106B).
3.
Overhaul of charging High Head Pump (CH-P-1C).'
4.
Tube shooting 'of Primary Plant Component Cooling Heat Exchanger (CC-E-1C).
5.
Repack of Heater Drain Pump (SD-P-1A).
~
\\
' l
.]
7 kk&
'A >5 Telephone (412) 393-6000 m::.-
Sh!ppingport, PA 150774004 December 9, 1985 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. OPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director. Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for the month of November,1985.
Very truly yours, IMS arey e President clear Group rw Enclosures cc: NRC Regional Office King of Prussia, PA
,,,