Monthly Operating Rept for Nov 1985
ML20137U070
Person / Time
Site: Beaver Valley
Issue date: 11/30/1985
From: Boyle R, Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8602190047
Download: ML20137U070 (7)


Text

me

f. ,

. - i s

NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE NOVEMBER 1985 November 1 At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br /> on November 1, the power level was through reduced to perform maintenance on the Main Feed ,

November 3 Reg. Valves (FCV-FW-498 -488, & .-478). On November 2 at 2306 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.77433e-4 months <br />, the Station was taken i off-line and entered Mode 3 at 2345 hours0.0271 days <br />0.651 hours <br />0.00388 weeks <br />8.922725e-4 months <br />.

November 3 At 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> while prepari ng to' take the reactor' critical, the Demand Counter for Group 2 0 Bank worked .,

improperly and a Unit Off-Normal Report was issued. At  ;

0625 hours0.00723 days <br />0.174 hours <br />0.00103 weeks <br />2.378125e-4 months <br /> the' reactor was taken critical.

' November 4 At 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> on November 4. Maintenance completed through work on the Main Feed Reg. Valves (FCV-FW-498. -488, November 8 and -478). At 2256 hours0.0261 days <br />0.627 hours <br />0.00373 weeks <br />8.58408e-4 months <br /> on the 4th, the Station was synched to the grid. The Station was in Operational Mode I with the reactor power at a i nominal 100 percent with the Reactor Coolant System at normal operating pressure and temperature.-

November 9 At 0412 hours0.00477 days <br />0.114 hours <br />6.812169e-4 weeks <br />1.56766e-4 months <br /> on November 9, the power level was reduced to perform maintenance on the Heater. Drain Tank Normal Level Control Valve (LCV-SD-1068). At 0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br /> on the ninth, an additional power reduction occurred to perform maintenance on a Main Feed Reg Valve (FCV-FW-488). At 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br />, Maintenance was completed on the Main ' Feed Reg Valve and power ascension to a nominal 100 percent started. ,

November 10 The Station was'in Operational Mode .1 with reactor power  !

through at a nominal 100 percent with the Reactor Coolant November 30 System at a normal operating pressure and temperature.

8602190047 351 PDR ADOCK 0 R

. _ TEM 1

]/,

... . . .- .- ~ . .- -- . . _ _ -.- - . . .

OPERATING DATA REPORT DOCKET NO. 50-334 DATE 12/9/85 COMPLETED SY R.N.Boyle

, TELEPHONE. a17-6&sI825 OPERATING STATUS

1. Unit Name: Beaver Valley Power Station, Unit il Notes
2. Reporting M. November 1985
3. Licensed Thermal Power (MWt): 7AAo l 4. Namepiste Rating (Grom MWe): 923
5. Dougn Electrical Racing (Net MWe): 835 i
6. Maximum Dependable Capacity (Cross MWe): 860 i 7. Maximum Dependable Capacity (Net MWe): 810 j 8. If Cheapes Occur in Capac:ty Ratings (1: ems Number 3 Through 7) Since Last Report, Give Reasons:

i o.

9. Power Level To Which Restricted. If Any (Net MWe): None

! ~10. Reasons For Restrictions. If Any; N/A '

i i

Dis Meath Yrto.Dete " Cumulative

!  !!. Hours la Reporting Period 720.0 8,~016. 0 84,024.0

12. Number Of Hours Reactor Was Critical 713.3 7,501.3 44,857.0 ,

i 13. Reactor Reserve Shutdown Hours 0.0 0.0 4,482.8

14. E.urs Generator On-Line 672.2 7,307.9 43,390.8 l 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 4 16. Gross Thermal Energy Generated (MWH) 1.668.503.2 17.673.069.1 101.071.583.1
17. Gross Electrical Energy Generated (MWH) 529.000.0 5.653.000.0 32,147,400.0 i 18. Net Electrical Energy Generated (MWH) 498,170.0 5.301.640.0 29.926.483.0 I
19. Unit Service Factor eta 91.2 54.1  ;
20. Unit Availability Factor 93.4 91.2 54.1
21. Unit Capacity Factor (Using MDC Net) 85.4 81.7 47.5 7
22. Unit Capacity Factor (Using DER Net) 82.9 79.2 46.1
23. Unit Forced Outage Rate 6.6 7.8 24.2 i 24. Shutdowns Scheduled Over Next 6 Months tType.Dete.and Duration of Each t

FIFTH REFUELING, May 19, 1985 Scheduled 93 days l

J 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units la Tes Status iPrior to Commercial Opmtion): Foresset Achieved l I

} INITIAL CRITICALITY N/A M/A l

} INITIAL ELECTRICITY N/A N/A l COMMERCIAL OPERATION N/A N/A I i l (9/77) i

i k UNITSHU1 DOWNS ANDPOWER REDUCTIONS DOCKET NO. 50-314 UNIT NAME BVPS Unitt. #1 DAIE - 12/9/s5 N vember COMPLETEll ey R.N. Boyle REPORT MONIH ,_

TELErt10NE (412)643-1825 1 '~l.

' gn  % 60 o "

O * ** 0

, 0t Licensee ,, E* Cause & Corrective No. Date ". =E E 3UE Event 0.

Action to y j5 *

. "j" Report #

j] gu Prevent Recurrence cn

  • 39 851101 F 0 B 4 N/A CH VALVE 1 At 1800 hours0.0208 days <br />0.5 hours <br />0.00298 weeks <br />6.849e-4 months <br />, power level was reduced to perform anaintenance on Main l

Feed Reg. Valves [FCV-FW-498, -488,

and -478].

2 40 851102 F 47.8 B 1 N/A CH VALVEI At 2306 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.77433e-4 months <br />, Station off-line to complete snaintenance on Main Feed Reg. '

Valves [FCV-FW-498, -488, and -478].

The Station returned on-line at 2256 hours0.0261 days <br />0.627 hours <br />0.00373 weeks <br />8.58408e-4 months <br /> on the 4th.

1 41 851109 F 0 B 5 N/A HH VALVEX At 0412 hours0.00477 days <br />0.114 hours <br />6.812169e-4 weeks <br />1.56766e-4 months <br /> power level was reduced i to perform waintenance on Heater Drain Tank level Control Valve 4

[LCV-SD-106Bl.

1 2 i

F: F.us ed 3 4 Reasues: Hethod: I:mholus G - Inssius si ms S Scheduecil A Fetuspatens Failuse(I.mplaint g.es.nua t f.n roepasasi.m ..e Data 8 Maineennece ei Test 2-stanual scree 1. nee, sheets I.w Ikensee C stefweling 3-Automatic Scram Fsene Rep.us el I Hll sic INilRI G 4

D Repslagen) Restsicaissa 4-Continued From Previous Month Ultsil 1 Opesaeau Toaineseg A Ikesese I:saseeistasiasse 5.Roductton I - Admenusseative 9-Other 5 ,

, G Opcessounal I sein 11 aplaint I sh.his I - Sanic %=n c I

rt/77) H Hohee glNplaing l e-

____. . . . _ _ _ _ _ . - . _ _ . . - = - - _ ._. _ ._. . _ . . . _ . -- .- - _. _ . _. .

1 .

'I UNIT SHU1 DOWNS AND POWER REDUCTIONS DOCKETNO. 50-314 UNIT NAME 8VPS U881L Il DATE n/e/as REPORT MONIH Noveember COMPLETEls my R.W. Sovie l TELEPHONE (412) 643-1sz5' t

m 5.*

cn  % MO "

o* N, O Gt Licensee . $* Cause & Corrective No. Date "e, 3Ul lg

  • eo E Event Action to 3 j5 j j j Report #

p ju Prevent Recurrence t

, 0 ca 42 851109 F 0 B 5 N/A CH VALVEI At 0602 hours0.00697 days <br />0.167 hours <br />9.953704e-4 weeks <br />2.29061e-4 months <br />, power level was reduced to perform maaintenance on Main Feed Reg Valve [FCV-FW-488].

Maintenance was completed at 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br />.

1 1

1 2 F: F.w sed 3 4 .

Reasnes: n.ched:

1 5 5(hedu seil 1:mhebes G-lassnestiewis A Fegaspeseene Failure (f.mplaini 1-Manual l'on Psepasasi.we os pasa

B-Maisseenance si Tes8 2-Manua1 scree l-neen Slweis I w l*rusec

-) 0-Refuellas i~

3-Automatic scree Fsent Rep.we 18 i Hil ele iNilRI(

D Repeelaten) Resseiceiun 4-Continued From Previous nonth 01483 ,

I thaceatne Toainisig A liessse I'manuseasi""

5-meeuctton 1 Adneenisseative 9-Other 5 G thaceassensal I seems ll'aplaini i shehit 1 Sauer Snesse r8/77) ll Helece llNplainI e-

+ .

, n.

'..g . . : . ,.

AVERAGE DAILi UNIT POWER LEVEL r- j

+ , ,

4 DOCKETNO. 50-334

)

' UNIT , 3V?5 Uni: #1

~

DATZf ,,12/9/85.

COMPLETED BY ,' R 8 8871*

\

TAONE, , (412) 643- 1825 e

i . .

NOVD!P3ER MONTH DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

(MWe Net) (M w. m ap 582 ; '-'

. 1 37 790 3 172 790 7

- 18 i '

0 ~

3 39 ' 7Pd 4 20 790# ,

709 gg 789 2 3 9 - 788 <

6 -

n- ,

79g .

746-7 ,3 790 -* -

871 -

g 74 -

' 7 338 787 9 25 789 .787 10 26 il 27 788 790 828 12 , 3 _

788 - '

789 13 788 p' '787 .

I 34 30 --

13 7M 3y N/A -

i le 7"

\

5

., . t.5

~*

  • INSTRUCTIONS ,

1 On this format.!ist the average daily unit power Ine! in Mwe. Net for each day in the reputting nwash. Compute to the ne: rest whole mepwatt.

i

($3.I77) l

, ( }*

MAJOR MAINTENANCE

~

~

l' . Repair of Main Feed Reg. Valves (FCV-FW-498, -488, and -478). .

2. Repair of diaphragm on Heater Drain Tank Level ~ Control Valve (LCV-SD-106B).
3. Overhaul of charging High Head Pump (CH-P-1C).'
4. Tube shooting 'of Primary Plant Component Cooling Heat Exchanger (CC-E-1C).
5. Repack of Heater Drain Pump (SD-P-1A).

~

\ ' l

.]

7 k

k& '

'A >5 Telephone (412) 393-6000 m::.-

Sh!ppingport, PA 150774004 December 9, 1985 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. OPR-66 Monthly Operating Report U. S. Nuclear Regulatory Commission Director. Office of Management Information & Program Control Washington, D. C. 20555 Gentlemen:

In accordance with Appendix A, Technical Specifications, the Monthly Operating Report is submitted for the month of November,1985.

Very truly yours,

. arey IMS e President clear Group rw Enclosures cc: NRC Regional Office King of Prussia, PA l

I

, ,,