Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345C811 +
- ML19332D859 +
- ML20084M346 +
- ML20078R400 +
- ML20112A567 +
- ML20134K152 +
- ML20214C385 +
- ML20213H077 +
- ML20236W119 +
- ML20211F735 +
- IA-87-216, Submits Daily Highlight.On 870311,while Unit 1 Cooled Down from Hot Functional Test,Severe Water Hammer Event Occurred in RHR Sys Hx.Caused by Operator Apparently Missing Step in Procedure.News Release & Related Info Encl +
- ML20215M470 +
- ENS 55845 +
- 05000254/LER-1989-010, :on 890629,reactor Scram Occurred Due to Turbine Stop Valve Closure.Caused by Loose Connection on Condenser Low Vacuum Pressure Switch Indicating Lamp 1-5600-PS-105B.Connection Tightened +
- 05000286/LER-1986-004-01, :on 860519,source-range (SR) high-flux Reactor Trip Initiated Automatically by Nuclear Instrumentation Sys. Caused by Operator Failure to Block SR Instrumentation During Startup.Operator Counseled +
- 05000312/LER-1988-014, :on 881025,Tech Spec Required Shutdown Due to RCS Leakage.Caused by Degradation of Two Valves Due to Svc in Rcs.Rcs Repaired by Seal Welding body-to-bonnet Joint, Then Injecting Valve W/Leak Sealant +
- 05000286/LER-1986-002-01, :on 860518,during Main Turbine Vibration Test, Reactor Tripped on Steam Flow/Feedwater Flow Mismatch Signal.Caused by Air Caught in Flow Transmitters Due to Insufficient Blowdown.Operators Counseled +
- 05000286/LER-1986-003-01, :on 860519,high Water Level in Steam Generator 34 Resulted in Turbine & Reactor Trips.Caused by Check Valve BFD-1-32 Failure to Reverse Flow Due to Loose Pivot Pins. Disk Pivot Pins Anchored Properly +
- 05000352/LER-1996-012, :on 921103,identified Improper Fuse Sizing. Caused by Personnel Error.Approved Design Change Re Proper Fuse Coordination & Reviewed Modifications Associated W/Fuse Ratings +
- 05000311/LER-1983-053-99, /99X-0:on 830812,while Increasing RCS Pressure to 2,000 Psig,Both Pressurizer Spray Valves Opened & RCS Pressure Started to Decrease.Probably Caused by Pressure Control manual-auto Loading Station +
- IR 05000255/1986007 +
- ML032040217 +
- 05000341/LER-1997-007, :on 970325,condition Prohibited by TS Due to Failure of Reactor Building Hvac.East RBHVAC Exhaust & Supply Fans Were Started in Order to Reestablish Secondary Containment Integrity & Failed Solenoid Valve Replaced +
- 05000271/LER-1996-031, :on 961009,alternate Rod Insertion Recirculation Pump Trip Occurred Due to Inadvertent False Low Water Level Signal on Level Transmitter During Backfill of Ref Leg.Scram & Ari/Rpt Reset +
- 05000312/LER-1988-005, :on 880315 & 22,steam/water Transients Caused Relief Valves to Lift & Result in Discharge of Water from Letdown Sys to Reactor Bldg Sump.Caused by Pressure Spike Due to Acceleration Slug of Water +