s VERMONT YANKEE NUCLEAR POWER STATION MONTH.Y STATISTICAL REPORT 87-04 FOR TtE MONTH OF. APRIL,1987 4
4 i
4 4
f l
i l-i I
~
1E19 B705200689 870430 i
PDR ADOCK 05000271 PDR i L/1 R
OPERATING DATA REPORT-DOCKET NO.
50-271 DATE 870510 COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711-OPERATING STATUS Notes:
1.
Unit Names Vermont Yankee 2.
Reporting Period:
April 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9
3 ower level to which restricted, if any (Net MWe): N/A P
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 719.00 2879.00
- 12. Number of Hours Reactor was Critical 719.00 2879.00 100349.73
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 713.68 2873.68 97852.37
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1095301.00 4511940.50 143187581.00
- 17. Gross Electrical Energy Generated (MWH) 369379.00 1529019.00 47657853.00
- 18. Net Electrical Energy Generated (MWH) 353972.00 1466678.00 45225354.00
- 19. Unit Service Factor 99.26 99.82 76.42
- 20. Unit Availability Factor 99.26 99.82 76.42
- 21. Unit Capacity Factor (using MDC Net) 97.68 101.08 70.08
- 22. Unit Capacity Factor (using DER Net) 95.78 99.11 68.72
- 23. Unit Forced Outage Rate 0.74 0.18 6.51
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
1987 Refueling Outage scheduled to begin on August 8,1987 and continue through October 2,1987.
- 25. If shut down at end of report period, estimated date of startup:
N/A
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY VYDPF 0411.01 INITIAL ELECTRICITY Original COMERCIAL OPERATION
~};
- e. >
~ '.
m.
1 AVERAGE DAILY UNIT POWER LEVEL-DOCKET NO.
50-271~
. UNIT Vermont Yankee DATE 870510
~
COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711 m-MONTH ADEil DAYJ AVERAGE DAILY POWER LEVEL DAY
. AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)'
'l
-512 17 516 2
515 18 517 3
520 19 499 4
264 20 516
-c:n,
-.*5 302 21 516 6
453 22 516
- 7 419
. 23 515 8
486 24 515 9
518 25' 516
-10 518-26 457
-11 518-27-514 l
12 514 28 515
-( :
.13 517 29 515 14 517 30 516 15 517 31 16 517
- - 23 hour2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> day.
. INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the roarest whole megawatt.
VYDPF 0411.02 Original
DOCKET NO3 50-271 UNIT NAME Vermont Yankee UNIT SHUTDOWNS AND POWER REDUCTIONS DATE 870510 COMPLETED BY G. A. Wallin REPORT MONTH April TELEPHONE (802) 257-7711 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report +
87-04 870404 S
0.00 B
4 N/A RB ZZZZZZ Power reduction for Turbine Power Bypass Valve testing.
Reduction
' ' ~
('
87-04 870404 S
0.00 B,H*
4 N/h RB CONROD Power reduction for a Control Power Rod Pattern Exchange and i
Reduction surveillance testing.
87-05 870404 F
5.32 8
4 N/A CC PIPEXX Power reduction to investigate Power and repair a pinhole leak off the Reduction "B" Turbine Control Valve above the seat drainline.
1 2
3 4
F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G - Instructions S-Schtduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
VYDPF 0411.03 G-Operational Error (Explain)
Exhibit I - Same Source Original
- H-Other (Explain) - Control Rod Pattern Exchange O
e
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 870510 COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711 REPORT MONTH April SLM4ARY OF OPERATING EXPERIENCES Hiablights Vermont Yankee operated at-95.6% of rated thermal power for the month.
Gross electrical generation was _369,379 MWH or 95.1% of design-e electrical capacity.
Operatina' Summary The following is a chronological description of plant operations including other pertinent items of interest.for the month:
At the beginning of the reporting period the plant was operating at 99.9% of.
rated thermal power.
870401 At 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br />, transferred to a hybrid cycle of operation in order to remove river. debris from the intake structure.
.870402 At 1031 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.922955e-4 months <br />, returned to an open cycle of operation.
870404 At 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />, decreased power to 80% for Turbine Bypass Valve testing.
(See Unit Shutdowns and Power Reductions).
870404 At 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br />,~ completed Turbine Bypass Valve testing. ' Reduced power to minimum recirculation flow.
870404 At 0912 hours0.0106 days <br />0.253 hours <br />0.00151 weeks <br />3.47016e-4 months <br />, initiated control rod exercising and turbine surveillance.
870404 At 1055 hours0.0122 days <br />0.293 hours <br />0.00174 weeks <br />4.014275e-4 months <br />, completed control rod exercising and turbine surveillance;-initiated a rod pattern exchange.
(See Unit Shutdowns and Power Reductions.)
870404 At 1157 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.402385e-4 months <br />, completed the rod pattern exchange.
870404 At 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br />, reduced power to 22% to investigate a minor steam leak.
(See Unit Shutdowns and Power Reductions.)
870404 At 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br />, the generator was removed from the grid.
870404 At 2249 hours0.026 days <br />0.625 hours <br />0.00372 weeks <br />8.557445e-4 months <br />, the turbine / generator was phased to the grid and a return to full power was initiated.
At the end of the reporting period, the plant was operating at 99.9% of rated thermal power.
VYDPF 0411.04 Original-l
VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 VYV 87-108 May 10, 1987 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of April, 1987.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.
dett M
Warren P. Murphy Vice President a d Manager of Operations WPM /tlAW/gmv:MSR1.1/MSR VYDPF 0411 Original
$