ML032040217
| ML032040217 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 07/15/2003 |
| From: | Bryan Hanson Exelon Nuclear |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002 | |
| Download: ML032040217 (4) | |
Text
at
Exekrnsm Exelon Nuclear Limerick Generating Station P.O. Box 2300 Pottstown, PA 19464 www.exeloncorp.com Nuclear T.S. 6.9.1.6 July 15, 2003 U. S. Nuclear Regulatory Commission 7Altn: Document Control Desk-Washington, DC 20555 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Monthly Operating Report for June 2003 Attached is the monthly operating report for Limerick Units 1 and 2 for the month of June 2003 forwarded pursuant to Technical Specification 6.9.1.6 and the guidance of NRC Generic Letter 97-02.
If you have any questions or require additional information, contact us.
please do not hesitate to Sincerely, K W I,
.I.I.. I.-..
Bryan C. Hanson Plant Manager Attachments cc:
H. Miller, Administrator, Region I, USNRC A. Burritt, LGS USNRC Senior Resident Inspector
boc:
R. DeGregorio - GML 5-1 B. Hanson - GML 5-1 C. Mudrick - SSB 3-1 E. Kelly - SSB 3-1 K. Kemper-SSB 2-4 S. Gamble - SSB 2-4 R. McCall - SSB 2-3 J. Toro - SMB 1-2 G. Lee - SSB 3-1 J. Grimes - KSA 2N J. Humphreys - KSA 3G D. Dyckman (PABRP) SSB 2-4 A..
., i
Unit:
Docket No:
Date:
Completed by:
Telephone:
Limerick 1 50-352 7/15/03 Greg Lee (610) 718-3707 A.
OPERATING DATA REPORT REPORTING PERIOD-June 2003 1 Design Electrical Rating (MWe-Net) 11191 Maximum Dependable Capacity (MWe-Net) 1134 Month Year to Date I Cumulative Hours Reactor Critical (Hours) 720.0 4,281.1 134,149.5 Hours Generator On-Line (Hours) 720.0 4,255.1 132,164.2 Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 Net Electrical Energy (MWh) 826,459 4,960,635 136,729,459 B.
UNIT SHUTDOWN No.
Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)
Off-line Duration (hrs)
None During June 2003
SUMMARY
Unit 1 began the month of June 2003 at 100% of rated thermal power (RTP).
On June 19"' at 0133 hours0.00154 days <br />0.0369 hours <br />2.199074e-4 weeks <br />5.06065e-5 months <br />, reactor power was reduced to 80% due to turbine control valve closure.
On June 19'h at 2249 hours0.026 days <br />0.625 hours <br />0.00372 weeks <br />8.557445e-4 months <br />, reactor power was restored to 100% RTP.
Unit 1 ended the month of June 2003 at 100% RTP.
Type F-Forced S-Scheduled Reason A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)
C.
SAFETY/RELIEF VALVE OPERATION I Date Vaves Actuated i No. & Type of Actuation I Plant Condition I Description of Event None During June 2003
Unit:
Limerick 2 Docket No:
50-353 Date:
6/15/03 Completed by: Greg Lee Telephone:
(610)718-3707 A.
OPERATING DATA REPORT REPORTING PERIOD-June 2003 l Design Electrical Rating (MWe-Net)
I 1191 l
l Maximum Dependable Capacity (MWe-Net) 1134 1
I Month IYear to Date Cumulative Hours Reactor Critical (Hours) 1 720.0 3,905.6*
110,033.1 Hours Generator On-Line (Hours) 1 720.0 3,862.7 108,297.7 Unit Reserve Shutdown Hours (Hours)
I 0.0 0.0 0.0 Net Electrical Enerav (MWh) 826.994 1 4.360.912 I 115.995.155 B. UNIT SHUTDOWN No.
Date Type Generator Reason Method Corrective Actions/Comments (yymmdd)
Off-line Duration (hrs)
None During June 2003
SUMMARY
Unit 2 began the month of June 2003 at 100% of rated thermal power (RTP).
There were no power changes this month on Unit 2.
Unit 2 ended the month of June 2003 at 100% RTP.
Type Reason Method F-Forced A-Equipment Failure (Explain) 1-Manual S-Scheduled B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
C. SAFETY/RELIEF VALVE OPERATION Date-Valves Actuated No. & Type of Actuation
-Plant Condition Description of Event l
I K_
M_!-
I.-_
enr I
I I P4OOXIL UUFIi1q June, zuua I