- ENS 47548 +
- 05000293/LER-2013-003, Regarding Loss of Off-Site Power Events Due to Winter Storm Nemo +
- 05000374/LER-2001-003 +
- IR 05000315/2008009 +
- ML18158A130 +
- ML18068A347 +
- ML20039G119 +
- ML030860505 +
- ML020780358 +
- ML20097F469 +
- ML20116J264 +
- ML20115C743 +
- ML20147E199 +
- ML20127P239 +
- ML20126G890 +
- ML20214K621 +
- ML20236N986 +
- 2CAN018703, Monthly Operating Rept for Dec 1986 +
- 2CAN078505, Monthly Operating Rept for June 1985 +
- ST-HL-AE-4270, Special Rept:On 921022,nonvalid Failure of Standby DG 12 Occurred During Standby DG Operability Surveillance Test. Caused by Tripped Generator Breaker Lockout Relay at Local Control Panel.Surveillance Procedures to Be Revised +
- 05000334/LER-1998-021, :on 980324,discovered Gas Voids in Low Head Safety Injection Discharge Piping to Suction Piping of Charging/Head Safety Injection Pumps.Cause of Event Not Established.Procedures Will Be Revised +
- 05000333/LER-1997-005, :on 970525,manual Reactor Scram Occurred Due to Failure of Number 3 Main Tcv.Caused by Damaged Valve Spring Can Coupling.Replaced Valve Spring Can Coupling Bolt of Four TCVs & Four CIVs & Completed Review +
- 05000255/LER-1997-012, :on 971017,deenergized Control Rods While in Power Operation.Caused by Failure of Individual Barriers to Prevent Inadequate Performance.Post Maint Testing Was Performed.Pages 5,6 & 7 of Incoming Submittal Not Included +
- 05000341/LER-1996-004, :on 960310,high Particulate Levels Found in EDG 11 Fuel Oil.Caused by Draining Day Tank Into Bottom of FOST Day Before Maint Creating Turbulence Near Sampling Point. Changed Out Fuel Oil in FOST for EDG 11 W/Fresh Fuel Oil +
- 05000397/LER-1984-119, :on 841110,automatic Reactor Water Cleanup (RWCU) Sys Isolation Occurred While Shifting RWCU Flow Return from Main Condenser to Reactor Vessel.Caused by Air in Instrument Sensing Line.Sensing Line Vented +
- 05000395/LER-1983-087-03, /03L-0:on 830803,diesel Generator a Failed Diesel Generator Operability Surveillance Test.Caused by Dirty Contacts on Maint Local/Remote Selector Switch. Contacts Cleaned +
- 05000374/LER-1993-008-06, :on 931022,inadvertent ESF Actuations Occurred Due to Personnel Error During Performance of Instrument Surveillence.Dg O Initiation Signal Verified & Stop Work Order Issued Re LIS-NB-216 +
- 05000341/LER-1993-004, :on 930219,electrician Located & Connected Test Equipment to Incorrect Auxiliary Relay,Resulting in Loss of 4,160-volt Ac Bus 69J.Caused by Personnel Error.Training on self-checking & Trip Relays Held +
- 05000316/LER-2020-001, Failure of Source Range Nuclear Instrumentation Resulting in a Condition Prohibited by Technical Specifications +
- ML20035F918 +
- 05000397/LER-1994-015, :on 940704,actuation of HPCS Sys Diesel Engine & half-scram Condition Occurred Due to Tubing Valve Manipulation.Procedure Entitled, Startup Instrument Rack Valve Line-up Changed on 940706 +
- ML091240150 +
- 05000354/LER-2004-010, Manual Reactor Scram Due to Moisture Separator Dump Line Failure +