DUQUESNE LIGHT COMPANY Beaver Valley Power Station NARRATIVE

SUMMARY

OF MONTHLY OPERATING EXPERIENCE - August, 1981 August 1 Station in Operational Mode 1 at nominal full power.

through August 13 August 14 Station in Operational Mode 1 at nominal full power. At 1226 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.66493e-4 months <br /> through a reactor trip occurred due to a turbine trip.

The turbine electro-August 15 hydraulic control (EHC) system hydraulic fluid pressure decreased when the EHC fluid pump tripped and the scandby EH fluid pump failed to start automatically. Reactor start-up was commenced at 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br />, the reactor was critical at 1510 hours0.0175 days <br />0.419 hours <br />0.0025 weeks <br />5.74555e-4 months <br /> and the main unit generator was synchronized at 2007 hours0.0232 days <br />0.558 hours <br />0.00332 weeks <br />7.636635e-4 months <br />. A reactor trip occurred at 22% reactor power due to Ica-low level in the 1A Steam Generator while transferring from the bypass flow controllers to the main feedwater flow controllers.

The reactor was critical at 2217 hours0.0257 days <br />0.616 hours <br />0.00367 weeks <br />8.435685e-4 months <br /> and the main unit was synchronized at 0049 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> on August 15, and power level was stabilized at full power by mid-morning.

August 16 Station in Operational Mode 1 at nominal full power.

through August 25 August 26 Station in Operational Mode 1 at nominal full power. At 2223 hours0.0257 days <br />0.618 hours <br />0.00368 weeks <br />8.458515e-4 months <br /> a through reactor trip occurred due to a turbina trip. The turbine EHC system August 27 control signals were causing the turbine throttle valves to modulate.

Reactor start-up was commenced at 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br /> on August 27 and the reactor was critical at 0204 hours0.00236 days <br />0.0567 hours <br />3.373016e-4 weeks <br />7.7622e-5 months <br />.

Repairs to the turbine EHC system were completed at 1405 hours0.0163 days <br />0.39 hours <br />0.00232 weeks <br />5.346025e-4 months <br />. At 1640 hours0.019 days <br />0.456 hours <br />0.00271 weeks <br />6.2402e-4 months <br /> a reactor trip occurred due to low-low level in the 1C Steam Generator. The reactor start-up was commenced at 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br />, the reactor was critical at 2102 hours0.0243 days <br />0.584 hours <br />0.00348 weeks <br />7.99811e-4 months <br /> and the main unit generator was synchronized at 2241 hours0.0259 days <br />0.623 hours <br />0.00371 weeks <br />8.527005e-4 months <br />.

August 28 Station in Operational Mode 1 with load increase to full power in progress.

August 29 Station in Operational Mode 1 at nominal full power.

through 31 1

l I

I I

l 8201150303 810904 PDR ADOCK 05000334 R

PDR l

DUQLESNE LIGHT COMPANY Beaver Valley Power Station MAJOR SAFETY-RELATED MAINTENANCE - AUGUST 1981 1.

Repaired the turbine electro-hydraulic control (EHC) system hydraulic pump and pump control circuit.

2.

Replaced a logic circuit card for the turbine EHC system throttle valve positioner.

3.

Radiation monitor repairs and calibration were in progress.

t mm

I I

i OPERATING DATA REPORT DOCKET NO. 50-334 DATE W /61 COMPLETED BY D. R. TfAko TELEPHONE. 412-643-1947 i

OPERATING STATUS Beaver Valley Power Station. Unit #1 Notes g, g,;,3, August, 1981

2. Reporting Period:
3. Licensed Thermal Power (MWt):

2660 923

4. Nameplate Rating (Gross MWe):

852

5. Design E!ectrical Rating (Net MWe):

845

6. Maximum Dependable Capacity (Gross MWe):

810

7. Maxt:nus: Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Througli 7) Since Last Report. Give Reasons:

i

+

l

9. Power Level To which Restricted. If Any (Net MWe)-

No"*

10. Reasons For Restr8ctions. If Any:.

N/A This Month Yr.-to-Date Cumulative 744 5,831 46,775

11. Hours In Reporting Period 731.53 3,756.14 18,282.81
12. Number Of Hours Reactor has Critical 0

0 4,W.6

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 707.77 3,676.68 17.383.93
15. Unit Reserve Shutdown Hours 0

0 0

16. Grou Thermal Energy Generated (MWH)

_1850578.86 9,172,596.33 _37,280,489.48

17. Gross Electrical Energy Generated (MWH) 589,700

,2,951,300 11,578,040

18. Net Electrical Energy Generated (MWH) 552,576 2,726,923 10, m, m

"*I

19. Unit Service Fretor
20. Unit Availability Factor 95.1 63.1 38.7
21. Unit Capacity Factor (Using MDC Net) 91.7 57.8 31.3 8'/.2 54.9 29.6
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 4.8 36.9 44.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.snd Duration of Eacht:

Refueling Outage /Jstiuary 2/13 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units le Test Status (Prior to Commercial Operationi:

Forecast Achieved

!NITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A (9/77)

f AVERAGE DAILY UNIT POWER LEVEL 50-334 DOCKET NO.

UNIT BVPS Unit #1 9/ /8)

DATE D. R. Timko COMPLETED BY TELEPHONE 412-643-5308 August, 1981 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 799 800-g7 791 800 2

g 791 791 3

19 3

799 4*

20 783 796 5

21 800 795 6

22 783 791 7

23 792 783 3

24 791 23 787 734 10 26 783

,g 27 0

746 12 7M 2g 783 783 13 29 379 783 14 30 647 15 31 787 795 16 INSTRUCTIONS On :his format, list the nerage daily unit power icsciin MWe Net for each day in the report:ng inonth. Compute in the nearest whole megaware.

(9/77)

i e

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-334 _

UNIT NAME IIVPS Uait 81 DATE 9/2/81 COMPLETED BY D.

R. Timko REPORT MONTil Au cu<; t. 1981

.TELEPilONE 412-64s-1947 E

e

.$ ?

3

$Y3 1.icensee

$ g, h

Cauw & Coerectne No.

DJN y

3@

,4 2sE Event 3,7 6."!

Action to y'

Prevens Recurrence

$E ai!

j di g Repori 8 vi L d

8 810814 F

7.68 A

3 HA IriSTRU While draining the Ell fluid reser-voir to troubic shoot a high lesel, i

alarm, the operating Ell fluid pump tripped, c.nd the standby Ell fluid Y.

l pump failed to auto start on lov oi?.

pressure, becaucie the lo-lo level lockout relay had tripped. This

~

resulted in a turbine trip, reactor l'

trip.

De-energized the lo-lo lock-out relay.

N l

9 810814 F

4.21 A

3 Cil INSTRU Main and bypass feed regulating valves control problems resulted in f

a low sceam generater level resetor

~

t i

trip during startup.

t 3'

4 I

T 2

s F: Forced Rdsori:

9 Methml:

Estubis G. Instrussions

[

s

[

S: Schedu!cil

.\\'. Equipment FailuieILxplaint c IAisnual for pseparati..n of Dara B. Maintenance or Test

'?. Manual Serain.

linin Sheets for Licensee C. Refueling

3. Auto:oaiic Scram.

Eseni Repois ILi'Kli ole tnt RTG,

)

s

'D-Regulier.n Resirkeion

. 1-O:hcr(Explain) 0161)

I' Operator Tuining & Lisense I:ununation.

's.

-T N

~

F. Adrninist rative I shit.it i. Sands.ntse

/

' G.Operaliutal Enros ll:xplain t -

T, i,'

s

.?

(

l 19/77)

' 11 Ot her llaplain) s n

N.

.s

.,)

5 i

' e s

4

  • j

/,%

s e

~

_ -y.

~

k

'g

>],

1 2

s 5

s

.y

',4,

}-

lt l

f i

u 4

(;

x y

s, s

i j-

r e

i

's

,\\

.t f

)

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO, 50-334

+

'v

,3 UNIT N AME I!VPS Unit #1 Y

s DATE 9/2/81 REPORT MON fil August,x1981 s COMPLETED RY D.

P.-Timko 1ELFPHONE 412-643 :1941

.l ;

a

).:

l j '

T s \\,

e S g

5' L' #"'#

'k f

j j'-

3 3 3 oc

Even'-

3g M

I'",A C"'8E

' s',,

  • Dai'-

3 A i,,,n in

{L 3 05 g detaws =

n O aO ac 7

p,, vent llecurrence 6

/

i I

i.

s 10 810826 F

24.28 A

3 IIA INSTRU A solenoid actuation in EllC system caused the turbine throttic valves to ramp open, causing a turbine trip,.

reactor trip. Lif ted leads on EllC turbine trips.

a 1

2 3

4 F: F.iried Reason:

Method:

Ealubit G. instinctions 5: Schedu!cd A Equip:nent Failure (Explain) 1 Manual fin Piepasati.m of Daia li Maintenance ci Test 2 Manual Scrain.

Entr> Sheet 5 for Liccasee C Refueling 3 Autinuatic Stram.

Event Repost ill Rt FileINURfC D Regulaint) Resirletion 4-Other IEsplain) 01614 L-Operalin Training A License Exanunation F Administralise 5

G Operational Ea roe Il.xplain t Estubit 1 Sam /$ouice 19/77)

Il Othes (Esplain t l