DUQUESNE LIGHT COMPANY Beaver Valley Power Station NARRATIVE
SUMMARY
OF MONTHLY OPERATING EXPERIENCE - August, 1981 August 1 Station in Operational Mode 1 at nominal full power.
through August 13 August 14 Station in Operational Mode 1 at nominal full power. At 1226 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.66493e-4 months <br /> through a reactor trip occurred due to a turbine trip.
The turbine electro-August 15 hydraulic control (EHC) system hydraulic fluid pressure decreased when the EHC fluid pump tripped and the scandby EH fluid pump failed to start automatically. Reactor start-up was commenced at 1450 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.51725e-4 months <br />, the reactor was critical at 1510 hours0.0175 days <br />0.419 hours <br />0.0025 weeks <br />5.74555e-4 months <br /> and the main unit generator was synchronized at 2007 hours0.0232 days <br />0.558 hours <br />0.00332 weeks <br />7.636635e-4 months <br />. A reactor trip occurred at 22% reactor power due to Ica-low level in the 1A Steam Generator while transferring from the bypass flow controllers to the main feedwater flow controllers.
The reactor was critical at 2217 hours0.0257 days <br />0.616 hours <br />0.00367 weeks <br />8.435685e-4 months <br /> and the main unit was synchronized at 0049 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> on August 15, and power level was stabilized at full power by mid-morning.
August 16 Station in Operational Mode 1 at nominal full power.
through August 25 August 26 Station in Operational Mode 1 at nominal full power. At 2223 hours0.0257 days <br />0.618 hours <br />0.00368 weeks <br />8.458515e-4 months <br /> a through reactor trip occurred due to a turbina trip. The turbine EHC system August 27 control signals were causing the turbine throttle valves to modulate.
Reactor start-up was commenced at 0145 hours0.00168 days <br />0.0403 hours <br />2.397487e-4 weeks <br />5.51725e-5 months <br /> on August 27 and the reactor was critical at 0204 hours0.00236 days <br />0.0567 hours <br />3.373016e-4 weeks <br />7.7622e-5 months <br />.
Repairs to the turbine EHC system were completed at 1405 hours0.0163 days <br />0.39 hours <br />0.00232 weeks <br />5.346025e-4 months <br />. At 1640 hours0.019 days <br />0.456 hours <br />0.00271 weeks <br />6.2402e-4 months <br /> a reactor trip occurred due to low-low level in the 1C Steam Generator. The reactor start-up was commenced at 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br />, the reactor was critical at 2102 hours0.0243 days <br />0.584 hours <br />0.00348 weeks <br />7.99811e-4 months <br /> and the main unit generator was synchronized at 2241 hours0.0259 days <br />0.623 hours <br />0.00371 weeks <br />8.527005e-4 months <br />.
August 28 Station in Operational Mode 1 with load increase to full power in progress.
August 29 Station in Operational Mode 1 at nominal full power.
through 31 1
l I
I I
l 8201150303 810904 PDR ADOCK 05000334 R
PDR l
DUQLESNE LIGHT COMPANY Beaver Valley Power Station MAJOR SAFETY-RELATED MAINTENANCE - AUGUST 1981 1.
Repaired the turbine electro-hydraulic control (EHC) system hydraulic pump and pump control circuit.
2.
Replaced a logic circuit card for the turbine EHC system throttle valve positioner.
3.
Radiation monitor repairs and calibration were in progress.
t mm
I I
i OPERATING DATA REPORT DOCKET NO. 50-334 DATE W /61 COMPLETED BY D. R. TfAko TELEPHONE. 412-643-1947 i
OPERATING STATUS Beaver Valley Power Station. Unit #1 Notes g, g,;,3, August, 1981
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2660 923
- 4. Nameplate Rating (Gross MWe):
852
- 5. Design E!ectrical Rating (Net MWe):
845
- 6. Maximum Dependable Capacity (Gross MWe):
810
- 7. Maxt:nus: Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Througli 7) Since Last Report. Give Reasons:
i
+
l
- 9. Power Level To which Restricted. If Any (Net MWe)-
No"*
- 10. Reasons For Restr8ctions. If Any:.
N/A This Month Yr.-to-Date Cumulative 744 5,831 46,775
- 11. Hours In Reporting Period 731.53 3,756.14 18,282.81
- 12. Number Of Hours Reactor has Critical 0
0 4,W.6
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 707.77 3,676.68 17.383.93
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Grou Thermal Energy Generated (MWH)
_1850578.86 9,172,596.33 _37,280,489.48
- 17. Gross Electrical Energy Generated (MWH) 589,700
,2,951,300 11,578,040
- 18. Net Electrical Energy Generated (MWH) 552,576 2,726,923 10, m, m
"*I
- 19. Unit Service Fretor
- 20. Unit Availability Factor 95.1 63.1 38.7
- 21. Unit Capacity Factor (Using MDC Net) 91.7 57.8 31.3 8'/.2 54.9 29.6
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 4.8 36.9 44.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.snd Duration of Eacht:
Refueling Outage /Jstiuary 2/13 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units le Test Status (Prior to Commercial Operationi:
Forecast Achieved
!NITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A (9/77)
f AVERAGE DAILY UNIT POWER LEVEL 50-334 DOCKET NO.
UNIT BVPS Unit #1 9/ /8)
DATE D. R. Timko COMPLETED BY TELEPHONE 412-643-5308 August, 1981 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 799 800-g7 791 800 2
g 791 791 3
19 3
799 4*
20 783 796 5
21 800 795 6
22 783 791 7
23 792 783 3
24 791 23 787 734 10 26 783
,g 27 0
746 12 7M 2g 783 783 13 29 379 783 14 30 647 15 31 787 795 16 INSTRUCTIONS On :his format, list the nerage daily unit power icsciin MWe Net for each day in the report:ng inonth. Compute in the nearest whole megaware.
(9/77)
i e
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-334 _
UNIT NAME IIVPS Uait 81 DATE 9/2/81 COMPLETED BY D.
R. Timko REPORT MONTil Au cu<; t. 1981
.TELEPilONE 412-64s-1947 E
e
.$ ?
3
$Y3 1.icensee
$ g, h
Cauw & Coerectne No.
DJN y
3@
,4 2sE Event 3,7 6."!
Action to y'
Prevens Recurrence
$E ai!
j di g Repori 8 vi L d
8 810814 F
7.68 A
3 HA IriSTRU While draining the Ell fluid reser-voir to troubic shoot a high lesel, i
alarm, the operating Ell fluid pump tripped, c.nd the standby Ell fluid Y.
l pump failed to auto start on lov oi?.
pressure, becaucie the lo-lo level lockout relay had tripped. This
~
resulted in a turbine trip, reactor l'
trip.
De-energized the lo-lo lock-out relay.
N l
9 810814 F
4.21 A
3 Cil INSTRU Main and bypass feed regulating valves control problems resulted in f
a low sceam generater level resetor
~
t i
trip during startup.
t 3'
4 I
T 2
s F: Forced Rdsori:
9 Methml:
Estubis G. Instrussions
[
s
[
S: Schedu!cil
.\\'. Equipment FailuieILxplaint c IAisnual for pseparati..n of Dara B. Maintenance or Test
'?. Manual Serain.
linin Sheets for Licensee C. Refueling
- 3. Auto:oaiic Scram.
Eseni Repois ILi'Kli ole tnt RTG,
)
s
'D-Regulier.n Resirkeion
. 1-O:hcr(Explain) 0161)
I' Operator Tuining & Lisense I:ununation.
's.
-T N
~
F. Adrninist rative I shit.it i. Sands.ntse
/
' G.Operaliutal Enros ll:xplain t -
T, i,'
s
.?
(
l 19/77)
' 11 Ot her llaplain) s n
N.
.s
.,)
5 i
' e s
4
- j
/,%
s e
~
_ -y.
~
k
'g
>],
1 2
s 5
s
.y
',4,
}-
lt l
f i
u 4
(;
x y
s, s
i j-
- r e
i
's
,\\
.t f
)
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO, 50-334
+
'v
,3 UNIT N AME I!VPS Unit #1 Y
s DATE 9/2/81 REPORT MON fil August,x1981 s COMPLETED RY D.
P.-Timko 1ELFPHONE 412-643 :1941
.l ;
a
).:
l j '
T s \\,
e S g
5' L' #"'#
'k f
j j'-
3 3 3 oc
- Even'-
3g M
I'",A C"'8E
' s',,
- Dai'-
3 A i,,,n in
{L 3 05 g detaws =
- n O aO ac 7
p,, vent llecurrence 6
/
i I
i.
s 10 810826 F
24.28 A
3 IIA INSTRU A solenoid actuation in EllC system caused the turbine throttic valves to ramp open, causing a turbine trip,.
reactor trip. Lif ted leads on EllC turbine trips.
a 1
2 3
4 F: F.iried Reason:
Method:
Ealubit G. instinctions 5: Schedu!cd A Equip:nent Failure (Explain) 1 Manual fin Piepasati.m of Daia li Maintenance ci Test 2 Manual Scrain.
Entr> Sheet 5 for Liccasee C Refueling 3 Autinuatic Stram.
Event Repost ill Rt FileINURfC D Regulaint) Resirletion 4-Other IEsplain) 01614 L-Operalin Training A License Exanunation F Administralise 5
G Operational Ea roe Il.xplain t Estubit 1 Sam /$ouice 19/77)
Il Othes (Esplain t l