Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000272/LER-1991-005, :on 910209,containment Fan Coil Units Did Not Meet Design Accident Requirements Identified by Updated Fsar.Caused by Inadequate Administrative Control.Cleaning of Inlet Side of Water Box Performed +
- ML20051N548 +
- 05000272/LER-1981-057, Forwards LER 81-057/03L-0.Detailed Event Analysis Encl +
- ML20082S895 +
- ML20092E865 +
- ML20117E096 +
- ML20128F238 +
- ML20196A019 +
- ML20214W009 +
- ML20214R702 +
- 05000423/LER-1988-015, :on 880415,determined That Action Taken to Terminate Previously Documented Unidentified Leakage Event Improperly Performed.Caused by Personnel Error.Operations Dept Personnel Sent Internal Memo Re Event +
- 05000293/LER-1992-017, :on 921214,primary Containment Isolation Sys Groups 2 & 3 Actuations Occurred During RPS Power Supply Shift.Caused by B RPS Breaker Inadvertently Deenergizing. Operator Counseled +
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed +
- 05000461/LER-1996-001, :on 960110,isolation of Mechanical Vacuum Pumps on Main Steam Line High Radiation Signal Occurred.Caused by Lack of Clarity of Meaning of Note in Table 3.3.2-1. Procedure Revised +
- 05000373/LER-1995-014-02, :on 950816,reactor Scram Occurred Due to 1D RPS Trip Causing Group 1 Isolation.Upgrade Model of EPM Assembly Logic Cards Installed on Both Unit 1 RPS Motor Generator Sets & Upper Main Steam Tunnel Switches Calib +
- 05000272/LER-1981-057-03, /03L-0:on 810526,leak Rate on 100-ft Containment Air Lock Exceeded Allowable Leak Rate.Caused by Improperly Aligned Outer Door.Door Centered & Tested Satisfactorily +
- ML20054B288 +
- PNO-I-82-033, on 820424,following Plant Load Decrease,Reactor Scrammed on Low Vessel Water Level & HPCI & Reactor Core Isolation Cooling Sys Actuated.Caused by Malfunction in Control Sys for Feedwater Pump B Regulating Valve +
- 05000368/LER-1990-002, :on 900131,errors Identified in Calculation Used to Establish Calibr Tables for Steam Generator Water Level Transmitters.Caused by Incorrect Static Pressure Assumption.Trip Setpoint Bistable Increased +
- 05000344/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Encl +
- 05000316/LER-1992-004, :on 920113,AB EDG (DG2AB) Failed to Reach Rated Speed within Time Limit Required by Tss.Caused by Inadequate Design Margin in Starting Air sys.Schrader-Bellows Valves in DG2AB W/Original Hunt-Trimline POVs +
- 05000338/LER-2013-003, Regarding Outside Recirculation Spray Pumps Declared Inoperable +
- WO 07-0014, Request for Notice of Enforcement - Discretion from Technical Specification 3.8.1, AC Sources - Operating +
- 05000413/LER-1989-021, :on 890727,Tech Spec Required Power Reduction Due to Failure of Two Refueling Water Storage Tank Level Channels Caused by Lightning Strike.Facility Returned to 100% Power After Transmitter Replaced +