Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 45879 +
- IR 05000528/2005010 +
- ML17334B395 +
- ML17318A436 +
- ML17317A874 +
- ML17317A813 +
- ML17341B275 +
- ML20010C216 +
- 05000272/LER-1991-024, :on 910616,reactor Trip from 100% Power Occurred.Caused by Lightning Strike.Engineering Review & Review of Lightning Protection Features Initiated & Damage to Phase B Gsu Transformer Repaired +
- 05000272/LER-1991-023, :on 910612,two Channels in Single Sys Inoperable.Caused by Equipment Failure.Pump Belts Replaced & & Pump Restored to Svc.Tech Spec Action Statements Exited +
- ML18153D020 +
- ML19326A544 +
- ML20040H444 +
- ML20040C673 +
- CPSES-200300346, Annual Operating Report for 2002 +
- ML20062J486 +
- CPSES-200203965, November 2002 Monthly Operating Report for Comanche Peak Steam Electric Station +
- ML20084T844 +
- ML20106E246 +
- ML20117H672 +
- ML20148E139 +
- ML20134K152 +
- ML20132H120 +
- ML20069A135 +
- IR 05000423/1987099 +
- ML20148C412 +
- ML20066D351 +
- ML20202H639 +
- ML20239A413 +
- ML20238A311 +
- IR 05000317/1987023 +
- ML20215E316 +
- ML20135H309 +
- BECO-91-028, Responds to NRC Re Violations Noted in Insp Rept 50-293/90-25 on 901127-1231.Corrective Actions:Work Terminated in Condenser Bay,Vendor Technician Escorted to RP to Begin Exposure Evaluation & Notify Mgt Personnel +
- 05000295/LER-1989-012-02, :on 890723,auxiliary Feedwater Pump Declared Inoperable Due to Failing Trip Test.Caused by Administrative Error Re Plant Interpretation of Applicable Tech Spec.Proper Flow Settings Valved In.Procedure Revised +
- 05000265/LER-1989-003-09, :on 890529,loss of Secondary Containment Occurred During Search for Grounds on 125 Volt Dc.Caused by Inadequate Design of 647 Ft Elevation Interlock Doors. Interlock Doors Closed.Procedures Revised +
- 05000373/LER-1989-012-01, :on 890309,pressure Differential Switch PDS-1E31-N013BB Found to Have Diaphragm Leak During Instrument Surveillance LIS-RI-101.Replacement Switch Installed,Calibr & Functionally Tested +
- 05000245/LER-1987-032-01, :on 870811,first Stage Bypass Switches Failed to Meet Tech Spec Requirements.Caused by Setpoint Drift from Extended Periods of Depressurization.Switches Recalibrated to Conform to Tech Specs +
- 05000296/LER-1987-006-04, :on 871124,unplanned ESF Actuations Occurred. Caused by Relay Failure & Personnel Error During Corrective Maint.Investigation Initiated to Determined Cause of Isolations.Failed Relay Coil Replaced +
- 05000413/LER-1987-038, :on 871012,discovered That Hourly Fire Watches Not Performed for Room 428.Caused by Personnel Error.Room 428 Hatch Covers Installed & Incident Reviewed W/Radwaste Chemistry Personnel.Hourly Fire Watch Resumed +
- 05000414/LER-1987-026-01, :on 870912,unit Shutdown Occurred Due to Inoperability of Auxiliary Feedwater Pump 2.Caused by Problems Encountered W/Pump Bearing Replacement on 870909. Bearing Replaced & Pump Declared Operable +
- 05000413/LER-1987-021-01, :on 870608,diesel Generator Declared Inoperable Due to Low Electrolyte Levels in Diesel Generator Battery. Caused by Personnel Error.Availability of Offsite Power Sources Subsequently Verified +
- 05000331/LER-1986-024, :on 861121,HPCI Sys Isolation Valve Closed Due to Signal from HPCI Steam Line High Flow Pressure Differential Indicating Switch PDIS2245.Caused by Moisture Shorting Out Terminals in Switch +
- 05000341/LER-1986-045, :on 861117,during Sys Restoration,Incorrect Valving Sequence Caused Damage to Test Return Line for Condensate Storage & Return Tanks.On 861201,water Collected in Cable Vaults Released to Outflow Canal +
- 05000261/LER-1987-001-02, :on 870316,Tech Spec 3.7.2.d 7-day Limiting Condition for Operation Re Inoperable Diesel Generator Exceeded & Reactor Taken Subcritical.Caused by Lengthy Maint.Diesel Generator B Repaired +
- 05000289/LER-1999-003-01, :on 990310,discovered Failure of Manual Balancing Damper in Supply Duct of Control Bldg Evs.Caused by Failure to Adequately Review Risk & Consequences of Change.Failed Damper Was Clamped Open +
- 05000249/LER-1987-003-06, :on 870227,shutdown Cooling HX Outlet Temp Found Greater than 212 F.Caused by Operator Failure to Adequately Monitor Reactor Water Temp on Proper Instrumentation.Water Temp Reduced +
- 05000412/LER-1997-011-02, On 971229,determined That Inadequate Electrical Isolation in Secondary Process Rack Circuitry Occurred Due to Design Error.Technical Evaluation Rept 1162 Was Developed +
- 05000498/LER-1988-013, :on 880204,two Time Delay Relays in solid-state Protection Sys Not Tested During Surveillance.Caused by Inadequate Review of Vendor Technical Manual & Actuation Logic Schematics.Procedure Revised +
- 05000265/LER-1988-017, :on 880607,engineering Dept Notified That,Based on as-built analysis,1-inch Drywell Pneumatic Line to Inboard MSIV Failed to Meet FSAR Allowable Stress Criteria. Two-directional Hanger Added to MSIV +