Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 48436 +
- ML17006A271 +
- ML17318A627 +
- ML17312B080 +
- ML063530498 +
- RS-18-087, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- RS-15-024, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- L-2006-107, 2005 Annual Radiological Environmental Operating Report +
- ML18333A016 +
- L-18-135, Special Report: Inoperable Post Accident Monitoring Instrumentation +
- ML19274D154 +
- ML20045F059 +
- ML20039G065 +
- ML032521439 +
- ML032480039 +
- ML20062E993 +
- ML20087G881 +
- ML20084E380 +
- ML20078R044 +
- ML20137Z926 +
- IR 05000271/1985099 +
- ML20140J512 +
- ML20135F106 +
- IR 05000309/1985009 +
- ML20128K382 +
- ML20069D819 +
- IR 05000213/1988003 +
- ML20198P045 +
- ML20198H480 +
- ML20195C977 +
- IR 05000245/1987005 +
- IR 05000247/1987001 +
- ML20245A231 +
- ML20236V897 +
- ML20235A668 +
- IR 05000271/1986018 +
- ML20209J529 +
- BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station +
- 05000412/LER-1987-034, :on 871029,erratic Level Swings in Fifth Point Heater B Observed W/Accompaning High & Low Level Alarms. Caused by Improper Response of Fifth Point Heater B Level Control Valves.Valves Replaced +
- 05000237/LER-1986-017-04, :on 860712,while Performing Operating Surveillance 500-8,MSIV 2-203-1C Fully Closed Causing Pressure & Neutron Flux Spike.Caused by Failed 90% Open Limit Switch &/Or Sticking Test Switch +
- 05000414/LER-1990-013-03, :on 901007,main Feedwater Pump Tripped Due to Equipment Failure +
- 05000278/LER-1985-022-02, :on 850911,reactor Protection Sys Initiated Full Logic Actuation Signal Due to False Scram Discharge Vol High Level Signal.Caused by Personnel Inadvertently Bumping Switch.Protection Sys Logic Reset +
- 05000395/LER-1985-011, :on 850418,control Rods Powered by Rod Control Sys Cabinet 2AC Failed to Move.Caused by Defective Slave Cycler Counter Card.Card Replaced.Preventive Maint Program for Rod Control Sys Cabinet Established +
- 05000331/LER-1984-040, :on 841104,auxiliary Transformer Failed,Causing Main Generator & Auxiliary Transformer Breakers to Nonessential Buses to Open.Caused by Short Circuit Between Turns in High Voltage Winding of Phase Coil +
- 05000336/LER-1994-023-01, :on 940725,Charging Pump B Inadvertently Started Due to Failure of Selector Switch When Operator Changed Switch Position.Switch Will Be Replaced During Upcoming Refueling Outage +
- 05000368/LER-1991-007, :on 910223,fire Occurred in 480-volt ESF Motor Control Ctr Following Start of Turing Gear Motor.Caused by Incomplete Contact Between Bus Bars & Circuit Breaker Power Stabs.Design Change Under Evaluation +
- 05000461/LER-1991-003, :on 910220,jarring of Division III Diesel Generator Breaker Cubicle Door by Utility Maint Personnel Results in Automatic Start of Diesel Generator.Caused by Personnel Error.Preventive Maint Developed +
- 05000352/LER-1990-034, :on 901209,reactor Mode Switch Placed in Shutdown,Placing Unit in Hot Shutdown Due to Inoperability of Loop B of RHR Svc Water Sys.On 901206,outlet Valve Declared Inoperable.Threaded Area Welded +
- 05000414/LER-1990-013-01, :on 901007,reactor Trip Occurred Due to low-low Level in 2D Steam Generator Due to Equipment Failure Resulting in Reactor & Main Turbine Trip.Event Reviewed & Investigated +
- ML20058M565 +