Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000237/2015004 +
- ML13345A261 +
- ML17349A751 +
- CP-201301252, Request for Enforcement Discretion Regarding Compliance with Technical Specifications 3.8.1, AC Sources - Operating +
- ML19056A409 +
- CP-201400632, License Amendment Request (LAR) 14-001, Revision to TS 3.8.1, AC Sources - Operating, for a 14-Day Completion Time for Offsite Circuits +
- ML20056G392 +
- ML20087M659 +
- ML20134J904 +
- IR 05000424/1987028 +
- 0CAN039904, Monthly Operating Repts for Feb 1999 for Ano,Units 1 & 2. with +
- ML20195F804 +
- 0CAN119808, Monthly Operating Repts for Oct 1998 for Ano,Units 1 & 2. with +
- CP-201000074, Official Exhibit - NYS000026-00-BD01 - Luminant Power (CP-201000074), Log TXX10010), Licensee Event Report 445/10-001-00, Trip Due to Pressure Relay Actuation on Main Transformer 01, Comanche Peak Nuclear Power Plant Unit 1 (Mar. 3, 2 +
- 05000461/LER-1989-024, :on 890619,west RWCU HX Room Temp Module Failed Channel Checks.Investigation Into Failures Revealed That Modules Miscalibrated on 890616.Caused by Personnel Error. Technicians Briefed on Use of Manuals +
- 05000413/LER-1987-031, :on 870729,vent Gas Radiation Monitor Found Inoperable.Caused by non-conservative High Radiation Alarm Setpoint.Setpoint Returned to Original Setting & Policy Will Be Clarified +
- 05000346/LER-1987-013, :on 871016,unit Lost Essential 120-volt Ac Bus Y2 Which Deenergized Four Sys & Placed Unit in Action Statements of Listed Tech Specs.Caused by Personnel Error. Technician Training Program Will Be Changed +
- 05000458/LER-1997-006-01, :on 970913,unplanned Mode Change During Initial Test of New Alternate Decay Heat Removal Function Occurred. Caused by Failure to Ref & Use Time-to-Boil Curves. Procedures Revised +
- 05000269/LER-1986-004-02, :on 860312,Nuclear Instrumentation Channel NI-1 Discovered Not Operating While Eight Fuel Assemblies Inserted Into Core.Caused by Failure to Maintain Full Requirements of Refueling Procedure +
- 05000413/LER-1985-071, :on 851220,reactor Trip Occurred.Caused by Equipment Malfunction.Work Request Initiated to Investigate & Repair Steam Generator Feedwater Control Valve 1CF28 +
- 05000254/LER-1992-010-03, :on 920407,loss of 125 Volt Dc Turbine Bldg Bus 1A & 1A-2 Occurred.Caused by Personnel Error.Plexiglass Covers Placed Over Disconnects Until Work Completed +
- 05000293/LER-1993-004, :on 930313,automatic Scram Occurred Resulting from Load Rejection During Severe Coastal Storm While at 100% Power.Caused by Environ Effects of Storm.Trip Settings of Main Input Circuit Breakers Increased +
- ML19340B434 +
- ML20042C509 +
- 05000311/LER-1993-002-01, :on 930128,pumps Tripped on Low Suction Pressure.Caused by Equipment Failure.Loose SGFP Master Controller Test Jack Repaired & Other Jacks in SGFP Speed Control Loop Inspected & Repaired as Required +
- 05000311/LER-1988-015-01, :on 880726,component Cooling HX 21 Declared Inoperable Due to Svc Water Leakage from Downstream Piping Resulting in Inoperability of HX 22.Caused by Equipment Problems.Leakage Repaired +
- IR 05000254/1977014 +
- ML20214L909 +
- 05000334/LER-1998-026, :on 980623,noted Failure to Perform IST of RHR & CCR Valves,Per Ts.Caused by Failure of IST Program to Properly Identify Required Testing of Subject Valves.Will Review & Revise IST Program & Procedures +