Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 40954 +
- ENS 44120 +
- ENS 44262 +
- 05000325/LER-2008-002 +
- 05000440/LER-1917-002, Regarding Loss of Safety Function Due to Main Turbine Bypass Valve Opening +
- ML093441507 +
- ML19332B000 +
- ML20040A217 +
- LIC-04-0105, LER 04-S01-00 for the Fort Calhoun Station Regarding Inadequate Security Compensatory Measures for a Security Zone +
- ML033240358 +
- ML031750588 +
- 05000265/LER-1994-010, Forwards LER 94-010 Re Unplanned Scram from Position 48 to 00 During Instrument Maint Surveillance +
- ML20127M258 +
- ML20207S854 +
- ML20214C805 +
- ML20212J648 +
- ML20212F730 +
- ML20247H599 +
- IR 05000285/1997008 +
- 1CAN059501, Monthly Operating Rept for Apr 1995 for ANO Unit 1 +
- 05000324/LER-1988-017-03, :on 881005,HPCI Vacuum Breaker Isolation Valve (2-E41-F079) Automatically Closed as Result of False Initiation Signal.Caused by Short Across High Drywell Pressure Relay.Equipment Tested Daily +
- 05000293/LER-1997-007, :on 970401,safeguard Buses Were de-energized Due to Severe Storm.Replacement of Microprocessor Control Units Installed in Voltage Regulating Transformers +
- 05000261/LER-1985-021-01, :on 850917,reactor Trip Occurred Due to False Low Reactor Coolant Flow Signal.Caused When Bistable for Loop 1 Was Tripped for Testing.No Cause for Voltage Spike Found +
- ML20087F432 +
- 05000352/LER-1991-023-01, :on 911007,reactor Protection Sys Inverter Output Circuit Breaker Tripped,Causing Loss of Power to Power Distribution Panel.Caused by Actuation of Relay. Alternate Test Method Under Development +
- 05000265/LER-1994-010-06, :on 940829,scram Signal Was Intentionally Inserted.Caused by Instrument Air Leakage Past Exhaust Port Diaphragm of 7 Ddpv Sol.Sspvs 117 & 118,were Rebuilt & Repaired & Replaced All Program Diaphragms +
- 05000338/LER-1994-001-02, :on 940122,EDG Fuel Oil Transfer Pumps Declared Inoperable Due to Improper Greasing of Pump Motor Bearings.Fuel Oil Pump House Exhaust Fans Secured & Portable Heaters Installed +
- 05000412/LER-1990-020, :on 901112,inadvertent Reactor Trip Occurred During RTD Verification Test +
- 05000285/LER-1989-019, :on 890924,indication of High Temp for Reactor Coolant Pump RC-3A Upper Motor Thrust Bearing Received in Control Room.Caused by Damaged Cable for Bearing Resistive Temp Device.Damaged Cable Replaced +
- 05000293/LER-1980-019-03, /03L-0:on 800519,during Startup of Pnps,Hpci Sys Was Declared Inoperable.Caused by Wiring Attendant to Installation of Alternate Shutdown Panel & Seal Exhaust Leakage Interference.Wiring & Leakage Repaired +
- 05000397/LER-1991-012, :on 910506,manual Initiation of Reactor Protection Sys Occurred Due to Low Scram Air Header Pressure.Caused by Hose Failure.Hose Replaced +
- 05000499/LER-2005-005, Re 125 Vdc Switchboard De-Energized Without Placing Fhb HVAC in Emergency Recirculation Mode +
- 05000285/LER-1988-024, :on 881003,emergency Diesel Generator Automatically Started Due to Apparent Momentary Low Voltage Condition on 4160 Volt Bus.Cause Inconclusive.Circulating Water Pump Restarted & Shutdown +
- 05000295/LER-1997-005-03, :on 970221,supplement to Unapproved Mode Change W/Ts Required Equipment Inoperable Were Noted.Caused by Inadequate Planning & Briefing.Both Units Have Been Placed in Cold Shutdown W/Rcs at Atmospheric Pressure +