y v- -

O

~

OPEltAllNG DATA lili"DitT DOCKI-T

. NO. 50-7ff G DATE 9-2-80 _

'C. Conne_11 COMPLETED isY TELEPilONE (914? 739-0200 OPEf t ATING STATUS N0fC5

1. Unit Name: TmHan Point no. 3 Nuclear Power Plant August 1980
2. Iteporting Period: .

__3025

3. Liecused Thennal Power (MW ):

1013

4. N~ueplate Rating (Gron MWel:

A9

5. Design Electrical Rating (Net MWel: 952
6. Maximum Dependable Capacity ICross MWe):

917

7. blaximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity itatings (items Number 3 Through 7) Since Lsst Report.Give Reasons: _

=

None

9. Power Level To Which Restricted.If Any (Net MWel: N/A .
10. Itessons For itestrictions.lf Any:

This Month Yr to-Dste Cumulative 744 5,855 35.112 I

~

11. !!ours In Reporting Period 4,187.6 3 g ,7 7., 3 l 738.6
12. Number Of Ilours itenctor was Critic .1 0 0 0
13. Reactor Resene Shutdown Hours 3,727.7 24,760.6 733.1
14. !!ours Cenerator On-Line 0 0 0
15. Unit Reserve Shutdown Hours 8,895,499 64,999,966 1,999,791 _

16.. Gross Thermal Ener;y Generated (MWil) 551,280 2,479,000 20,844,101

17. Cross Electrical Ener;:y Generated (MWill 2,355,181 -

19,998,618 526,916

18. Net Electrical Energy Generated (MWil) , 70.5 98.5 63.7
19. Unit Service Factor 98.5 63.7 70.5
20. Unit Availability Factor 77.2 43.9 62.1
21. Unit Capacity Factor (U>in;: MDC Net) 41.7 59.0 73.4

'22. Unit Capacity Factor (Using DElt Net) 21.8 7.2 1.5

23. Unit Forevd Outage Itate -
24. Shutdowm Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:

Turbine Outage October 1980 N/A

25. If SImt Down At End of Iteport Period. Estimated Date of Startnp:

Forecast Achieved

26. Units In 1rst Statm Irrior to Connnercial Operationi: ,

A _

INirlAl. CRITICAL.ITY .

w INillAl.1:I.1:ClitlCITY *

~

COMMI:ltCIAl. OPI.l: AllON e

_ 8 0 0 919 0Y8/ .

- D AM lD JulXkf; P lIIT Y 0

(" m i

r ,

~

DOCKET NO.

50-286 . .

UNITSilUTDOWNS AliD POWER REDUCTIONS UNITN.O!E Indian Pt. No. 3 DATE 9-2-Ro REPORTMONT11_ August ,

COMPLETED BY c ennn, n TELEril0NE (9141 739-8200 1

~.

, .! ? };; [$h 1.leensee  !*, h.

Cause & Corrective gg No. Date n. ,gg5 N Event u? o3 gu .-. Action to 5 l Ji* 5 g Report 4. @G u Prevent Recurrence

. . c O

26 800812 F 3.2 A 3 HF PUMPXX-B Unit trip during rapid load reductior caused by loss of all circulatit.9 water.to #33 condenser bay when #36 circulating water pump tripped with

  1. 35 circulating water pump previously out of service for repairs.

Repaired pump.

27 800823 F 7.7 A 3 EB GENERA-E Unit thip while placing repaired .

motor generator. set in service.-

Malfunction with auto synchronizing device. Repaired auto synchronizing, device.

T R

S n -

~

g ,

1 WI F: Forced 2 3 . 4

' Reason:

Method:

Q S: Sch.duled Exhibit F -Instructions

  • A Equipment Failure (Explain) 1. Manual for Preparation of Data na B Maintenance or Test 2 Manual Scram.

W C. Refueling

  • D Regulatory Restriction 3 Automatic Scram.

Entry Sheets for Licensee .

. Event Report (LER) File (NUREG-M E-Operator Training & License Examination -

4 Other (Explain) 016i) k- F Administrative 5 G-Operational Error (Explain)

(Q77) Il Other (Explain) Exhibi.H Same Sourec

[ mw6.+w.ucas -t-er-__ w -

-w-v~_

r- v AYl:l( AGE DAILY UNIT POWEl( I.I. VEL DOCKET NO. 2M

~

Indian Point

. UNIT No.3

--0 DATE

. COMPLETED DY _ C. Connell TELEPllONE 914-739-8200

^ *'

MONTil .

DAY AVERAGE DAILY POWER LEVEL DAY AVER ACE DAILY POWER LEVEL (MWe Net) (gwe.ge )

I 830 * )y 690

  • 2 787 690 33 3 ,

782 _ 19 715 4 725 . 801 2n 688 838 5 21 _

~

6 689 . 842

_ 22 7 23 273 .

3 . 726 24 711 735 9 25 845 10 767 847 26 848 -

849 11 .

27 12 469 834 28 13 698 815 79 14 721 810 3

15 717 844 3;

16 698 m

~

1 1

INSTRUCTIONS  !

l On this format. list the average daily unit power levelin MWe. Net for cach day in the repurting inonth. Compute to

, , the nearest whole rnegawatt. -

l

.s ,- .

(9/77) {

4 hi - ._ @

MOtiTilLY I & C CATEGORY I REPORT a August, 1980 . c Month Da te W.R. # Equipment Malfunction Corrective Action 8/26/80 1C-1-763-3B I.E.O.P.S. No output from 3 Spare Replaced detectors detectors 8/26/80 1C-1-791-lE #33 Inverter No output Replaced defective output filter capacitors & pre-charge circuit capacitors 8/26/80 1C-1-852-2 #32 Chg. Pump I/P Defective Air Regulator Replaced Regulator SM-141P 8/26/80 1C-1-524-3D Gross Failed Fuel Sys. Defective Gamma Detector Replaced Gamma Detector and Calibrated System.

8/26/80 1C-1-778-2 Vent Header Pressure Linkage disconnected Reinstated linkage Transmitter

ll ;'

0 8 r 9 e 1 d h N n t t O i s n I l u o T y g M C C u A r A d e s E i w k V u o a I l l e T F B L C

E d d d R e e e R c c r O a a i C l l a p p p e e e R R R k

T a R e O L P

E r R e d d e s E N n z k C O i i a N I l e e A T y S L N C C E N r r T U d e e N F i w l I L u o o A A l l o M M F B C Y

L 1

1 T

N O

M t

i p n m U u

P r e

g l n o i

g o

C T r N a n E h a M C F P l I 3 l 5 U 3 - 3 Q # R #

E 1 7 6

  1. 4 4 3 /

. 2 2 2 1 1 1 R. - - -

W I I I 0 0 0 8 8 8 9 e E 4 4 0 T 1 3 3 Aa

7. .

i'

SUMMARY

OF OPERATING EXPERIENCE - AUGUST 1980 Indian Point Unit 3 was synchronized to the bus for a total of 733.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> producing a gross generation of 551,280 MWe for the reporting period.

During this period the unit experienced two plant trips.

On August 12 at 0945 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.595725e-4 months <br /> the unit experienced a trip during a rapid load reduction caused by the loss of all circulating water to #33 condenser bay when #36 Circulating Water Pump tripped with #35 circulating water pump out of service for repairs. The unit was returned to service at 1259 hours0.0146 days <br />0.35 hours <br />0.00208 weeks <br />4.790495e-4 months <br /> on that same day. Commenced load escalation consistent with circulating water pump capabilities.

On August.23 at 0316 hours0.00366 days <br />0.0878 hours <br />5.224868e-4 weeks <br />1.20238e-4 months <br /> the unit experienced a trip while piacing '

a repaired rod drive motor generator set into service. That same day at 1057 hours0.0122 days <br />0.294 hours <br />0.00175 weeks <br />4.021885e-4 months <br /> the unit was returned to service and commenced load escalation consistent with circulating water capabilities.