- 05000311/LER-1991-017-03, :on 911109,reactor/turbine Trip Occured on Low Auto Stop Oil Pressure Followed by Turbine/Generator Failure.Caused by Failure of 63-3 Auto Stop Oil Protection Pressure Switch.Matrix Review Performed +
- ML18093A747 +
- ML19056A409 +
- ML19319B878 +
- ML19329B743 +
- ML023230339 +
- ML20077A392 +
- ML20137B587 +
- ML20133F927 +
- ML20213H077 +
- ML20237L595 +
- ML20237E620 +
- ML20215B097 +
- JAFP-85-0299, 1984 Radiological Environ Surveillance Rept +
- JAFP-85-0193, Effluent & Waste Disposal Semiannual Rept,Jul-Dec 1984 +
- IR 05000461/1990015 +
- 05000331/LER-1986-021, :on 861020,RWCU Sys Isolated Due to High Temp Indication from Outlet of non-regenerative Hx.Caused by Deficiency in Administrative Controls.Trip Setpoint Reset & Securing Mechanism Will Be Added to Dial +
- 05000382/LER-1988-007, :on 880413,discovered That Monthly Tech Spec Sampling Requirement Missed.Caused by Cognitive Personnel Error Due to Not Filing Surveillance Tickler Cards.Sample Taken & Found to Be in Spec +
- 05000373/LER-1986-006-03, :on 860218,w/RWCU Sys Out of Svc & Reactor Recirculation Sys Sample Line Plugged,Continuous Conductivity Monitor Rendered Inoperable.Caused by Misunderstanding of Tech Specs +
- 05000354/LER-1995-035, :on 951120,failed to Lock Reactor Mode Switch in Opcon 5,missed SRM Surveillance & Missed Suppression Chamber Level Surveillance Due to Inadequate Procedures. Revised Procedures +
- 05000334/LER-1983-016-03, /03L-0:on 830528,supply Breakers to 4,160-volt Buses 1A & 1B Opened Due to Inadvertent Operation of Pilot Wire Protection Relay,Causing Loss of Offsite Ac Source & Reactor Trip.Caused by Ground Fault on Panel +
- 05000278/LER-1994-005-03, :on 941011,Unit 3 Scram Occurred Due to Static Inverter Failure.Appropriate PCIS & RPS Scram Logic Reset & Affected Sys Reset to Appropriate Configuration & Failed Unit 3 Transformer Replaced & Properly Setup +
- 05000254/LER-1993-005-05, :on 930609,numerous Alarms Received in CR, Including HPCI Turbine Rupture Disc High Pressure Alarm. Caused by Ruptured Disk,Releasing Steam/Water Mixture. Test Will Be Conducted on Rupture Disks +
- 05000397/LER-1991-035, :on 911220,plant Manually Scrammed to Complete Controlled Shutdown Due to High Coolant Conductivity. Caused by Failed Tube in Main Condenser.Condenser Tube Plugged +
- 05000280/LER-2010-003, For Surry Power Station, Regarding Loss of Vital Bus Due to Human Error Results in Automatic Reactor Trip +
- 05000286/LER-2007-002, Regarding Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by a Fault on the 31 Main Transformer Phase B High Voltage Bushing +