Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12068A123 +
- ML20024H709 +
- ML20011E899 +
- ML20064F779 +
- ML20086E308 +
- ML20099C098 +
- ML20095K001 +
- ML20106A672 +
- ML20072G748 +
- IA-85-678, List of Dockets,Plant & Project Manager Names & Development Stages for Nonpower & Power Reactors +
- IR 05000424/1985045 +
- ML20212N063 +
- B13296, Application for Amend to License NPF-49,deleting License Conditions Re Containment Average temp,N-1 Loop Operation, Instrumentation for Monitoring post-accident Conditions,Per Rev 2 to Reg Guide 1.97 & Moisture in Air Start Sys +
- B13207, Forwards Westinghouse Reload Safety Evaluation for Millstone Unit 3,Cycle 3. Rept Demonstrates That Core Reload Will Not Adversely Affect Safety of Plant for Either Four or Three Loop Operation +
- B16978, Forwards Rev 5 to Millstone Unit 3 Operational Readiness Plan. Plan Covers Readiness for Restart,Startup & Power Ascension & long-term Operational Objectives +
- A07138, Forwards Addl Info to Support Util 860611 & 1028 Responses to IE Bulletin 85-003 Re motor-operated Valve Common Mode Failures,Per NRC 880324 Request +
- B16504, Provides Revised Schedule for Submittal of License Amend Requests as Identified in LERs 97-006-01,97-018-00 & 97-023-00 +
- B16495, Responds to NRC Re Violations Noted in Insp Rept 50-423/97-80.Corrective Actions:Revised Integrated Maint Program Manual Program Instruction PI-1.1, Phase 1 Scoping & Conducted Evaluation Using New Instructions +
- ML20136D864 +
- B14359, Revises 900703 & 910326 Responses to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Transmitters That Do Not Provide Input to PSC Will Be Checked at 4,000 PSI-MONTH Criterion Frequency +
- B14258, Informs of Commitment to Perform 18-month PORV Stroke Test During Mode 3 or 4 Only When Entering Into Mode 3 or 4 from Higher Mode Operations (Modes 1 or 2),in Response to GL 90-06 & NRC Ltr +
- B14320, Discusses Temporary Waiver of Compliance Re TS for Heating Source & Charging Pump +
- B14272, Application for Amend to License NPF-49,revising TS 4.3.2 to Further Clarify Footnote in Table 4.3-2 Re ESFAS Instrumentation Surveillance Requirements +
- B14184, Documents Commitment in 920303 Application for Amend to License NPF-49,revising TS Re Surveillance Requirements for Reactor Trip Sys & Esfas,Per 920624 Telcon W/Nrc.Review Will Be Performed of Plant Past 1 Yr Surveillance Records +
- B14211, Requests Temporary Waiver of Compliance from TS 3.7.13 Re Fire Rated Assemblies to Allow Facility to Operate While Concerns of NRC Bulletin 92-001 on Failure of Thermo-Lag 330 Fire Barrier Sys Addressed Inside Containment +
- B14078, Proposed TS Deleting License Conditions 2.C(5) Re Inservice Insp Program & 2.C(10) Re Initial Test Program +
- B15462, Provides Revised Repair Plan Re Check Valve 3RCS*V146 +
- A10071, Responds to NRC Re Violations Noted in Insp Rept 50-423/91-22 on 910921-1115.Corrective Actions:All Preventive Regenerative Maint Work Orders Will Have Retest Documented or Listed as Not Applicable by 921201 +
- B11135, Responds to Chemical Engineering Branch Draft SER Open Items Addressing Secondary Water Chemistry Monitoring & Control Program.Secondary Sys Will Be Maintained Under Wet Layup Conditions +
- B13897, Provides Updated Response to Insp Rept 50-423/90-80 Re Emergency Operating Procedures Upgrade Project & Proposed Schedule for Project Completion +
- A09899, Responds to NRC Re Violations Noted in Safety Insp Rept 50-423/91-15 & 911002 Notice of Violation & Forwards Civil Penalty in Amount of $50,000.Design Change Implemented to Address Mussel Fouling +
- B13880, Forwards Request for Relief from ASME Code Section XI Requirements Re Mod to Pipe 3SWP-030-345-3 to Enable Util to Make Interim Repairs to Leak in Piping as Alternative to IWA-7000 Replacement +
- B15052, Responds to NRC Re Violations Noted in Insp Rept 50-423/94-24 on 940817-0926.Corrective Actions:Review Team Established to Explore Potential Failure Mechanisms & to Identify Potential Solutions +
- B13867, Requests Relief from ASME Section XI Requirements for Interim Repair to Pipe 3SWP-030-334-3 at Millstone Unit 3. Addl Info Encl +
- B14793, Responds to NRC Re Violations Noted in Insp Rept 50-423/93-24.Corrective Actions:Scope & Frequency of Slcrs/ Abfs Testing/Trending Will Be Revised to Address Component Timing & Stability.Fee Paid +
- ML20125D977 +
- ML20090C679 +
- ML20091A646 +
- ML20078G268 +
- B14430, Proposed TS 4.4.3.5(a) Re Insp Frequencies for SG Tubes +
- ML20009A401 +
- ML20083Q271 +
- ML20101T195 +
- ML20041D174 +
- ML20043D579 +
- ML19330A407 +
- ML19224A350 +
- ML20083D063 +
- ML20198G615 +
- ML20032B110 +