Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25307A086 + (ML25307A086)
- ML25307A087 + (ML25307A087)
- ML25307A089 + (ML25307A089)
- ML25307A092 + (ML25307A092)
- ML25307A093 + (ML25307A093)
- ML25307A094 + (ML25307A094)
- ML25307A095 + (ML25307A095)
- ML25307A096 + (ML25307A096)
- ML25307A097 + (ML25307A097)
- ML25307A098 + (ML25307A098)
- ML25307A099 + (ML25307A099)
- ML25307A100 + (ML25307A100)
- ML25307A101 + (ML25307A101)
- ML25307A102 + (ML25307A102)
- ML25307A103 + (ML25307A103)
- ML25307A104 + (ML25307A104)
- AEP-NRC-2025-36, Updated Final Safety Analysis Report (Ufsar), Revision 33, 10 CFR 54.37(b) Review for the Renewed License, November 2023 to May 2025 + (ML25307A105)
- ML25307A198 + (ML25307A198)
- ML25307A199 + (ML25307A199)
- ML25307A208 + (ML25307A208)
- 05000414/LER-2025-004, Through Wall Leak in Letdown Piping + (ML25307A221)
- 05000416/LER-2025-005, Loss of Secondary Containment Due to Unsecured Roof Hatch + (ML25307A235)
- ML25307A311 + (ML25307A311)
- 05000387/LER-2025-002, Both Sub-Systems of the Control Room Emergency Outside Air Supply System Impacted by Concurrent, Unrelated Equipment Issues in the Control Structure Heating, Ventilation & Air + (ML25307A312)
- 05000370/LER-2025-001, Condition Prohibited by Technical Specifications Due to Emergency Diesel Ventilation Damper Malfunction + (ML25307A321)
- ML25307A326 + (ML25307A326)
- ML25307A327 + (ML25307A327)
- ML25308A001 + (ML25308A001)
- 05000254/LER-2025-006, High Pressure Coolant Injection Inoperable Due to Turbine Inlet Valve Failure to Open + (ML25308A004)
- NMP1L3662, Constellation Energy Generation, LLC, Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI + (ML25308A009)
- ML25308A076 + (ML25308A076)
- ML25308A246 + (ML25308A246)
- ULNRC-06973, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 27 + (ML25308A247)
- ML25308A248 + (ML25308A248)
- ML25308A249 + (ML25308A249)
- ML25308A252 + (ML25308A252)
- ML25309A014 + (ML25309A014)
- IR 05000354/2025301 + (ML25309A141)
- IR 05000498/2025301 + (ML25309A147)
- ML25309A149 + (ML25309A149)
- ML25309A150 + (ML25309A150)
- ML25309A151 + (ML25309A151)
- L-25-215, Cycle 31 Core Operating Limits Report + (ML25309A152)
- ML25309A155 + (ML25309A155)
- ML25309A158 + (ML25309A158)
- ML25309A159 + (ML25309A159)
- DCL-25-086, Independent Spent Fuel Storage Installation - Proposed Revision to the Quality Assurance Program + (ML25309A160)
- ML25310A001 + (ML25310A001)
- ML25310A002 + (ML25310A002)
- PMNS20251167, Meeting with Gle to Discuss Geotechnical RAIs + (ML25310A030)
- ML25310A225 + (ML25310A225)