Enclosure to ULNRC-06973 November 4, 2025 Enclosure OAR-1 Forms (2)
(Four pages follow this cover sheet.)
CALLAWAY NUCLEAR PLANT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number NED20250022 Platt Callaway Energy Center, P. O. Box 620, Fulton, MO 85251
- UnitNo,
_4 Commercial service date 12/19/1984 Refueling outage no.
27.
(ff appticanie)
orr""
Current inspection interval 7
3 (IWE and IWL Program (1a, 2nd. 3rd. 4th other}
Current inspection penod 3S QWE Program)
& 2 (IWL Program (18, 2nd, Ira)
Edition and Addenda of Section XI applicable to the inspection plans 2007 Edition with 2008 Addenda (IWE Program)
{WE Program: 10/10/2019, Rev 4.1 Date and revision of inspectionplans i.
oo
__IWL Program: 01/24/2024, Rev 5 Edition and Addenda of Section X! applicable to repair/replacement activities, if different than the inspection plans Anspectionplan
~..
Code Cases used N-532-5,N-765 (d appkcable)
~~
CERTIFICATE OF CONFORMANCE l certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code.Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of
=
27 (refuekng outage number}
conform to the requirements of Section XI.
signed Yolam Wundenh, 147737 Twe/twe date _2/2/eoes Owner of Owner's Designes, Tha ngircel CERTIFICATE OF INSERVICE INSPECTION l, the undersigned, holding a valid commission issued by the Nationa! Board of Boiler and Pressure Vessel Inspectors and employed by THE HAkrfoRD STEAM Borer ilSpecriy AND inseeefcompa Haatrero,oT have inspected the items described in this Owner's Activity Report, and state that. to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Séction Xl.
By signing this certificate nether the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/
replacement activities and evatuation described in this report. Furthermore, neither the Inspector nor his employer shail be fiable in any manner for any pers jury or property damage ora loss of any kind arising from or connected with this inspection.
Commission le716 RV IE Inspetters Signature Natemal Board, State. Province, and Endorsements owe] ou [ zexs Page l of 2
CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category l Item Description Evaluation Description and ftem Number Incore Sump Liner CR 202502957
- During performance of Job 2351 1994.501, nine pits were identified in the Instrument Tunnel Sump (Incore Pit) Liner following coating removal. Utilizing a pit gauge, l engineering measured the pit depths which range from 1/16in. to 3/32 in. Callaway calculated the
. minimum wall thickness required for the
_ containment liner for conditions of generalized and l localized thinning by conservatively assuming different size voids in the concrete containment structure immediately behind the liner plate (RFR 019682 and Cale 2Z-475). This calculation l
concluded that a liner wall thickness of 1/8" (or 0.125") is allowed for areas of localized liner
- defects or thinning that are less than 5 in
- diameter. No voids were detected in or around the l
afeas with pitting. This liner is % in thick carbon l steel. With these pits, the liner maintains a wall l
thickness over 4/8 in. This is within the allowances documented in RFR 019682 and Calc 22-475. No weld repairs are needed at this time. New coating will be installed in these areas to protect the pits l from the borated water and prevent the further deterioration of this pitting. Job 2351 1994.520 will apply new coating. These pits were also vacuum tested under Job 23511994.503 and tested SAT whichinsures the pressure boundaryis
__lmaintained.
No further action needed.
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description l
-Descriptionof Work
=
= l Date l
Repair/Replacement Completed lPlan Number Apply Prote Protective Coating toSteel Lining iin CC Incore Sump Liner the Sum 05/02/2025 2351 1994.520 Page 2 of 2
DT CALLAWAY NUCLEAR PLANT
_FORM OAR-1 OWNERS ACTIVITY REPORT Report Number a
1 Plant Callaway Energy Center, 8315 County Road 459, Steedman, MO 65077 Unit No.
1.
Commercial service date 42/19/1984 Refueling outage no. ___ 22
{it applicable)
Current inspection interval (tst, 2nd, 3rd, 4th, other)
Current inspection period rd through 12/18/24: Ist starting 12/19/24
(\\st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans _2007 Ed / 2008 Add through 12/18/24: 2019 Ed starting 12/19/24 °"__
Date and revision of inspection plans jn ist Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans _Same_as inspection plan_
en ar RT Code Cases used for inspection and evaluation:
532-5, N-661-3, N-716-2, N-E
{if applicable, including cases moditied by Case N-592 and later revisions)
- Condition Reports 202503344/202504342 discuss the transition between the 4" and 5" (Si intervals.
CERTIFICATE OF CONFORMANCE
\\ certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and {c) the repair/replacement activities and evaluations supporting the completion of (refueling outage number) on number) conform to the requirements of Section XI.
Signed Dees 92% __ Station Welding Engineer Date 11/4/2025 Owner or Ownars Designes, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a vatid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed byTHe MARTFCED STEAM Beuce Wipteraw AUD IRIEL Company WAR Fao or
_ have inspected the items describedin this.
l Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this l
inspection.
e716 Rwik (National Board Number and Endorsement) _
Commission
CALLAWAY NUCLEAR PLANT TABLE l ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE (Examination Category Item Description Evaluation Description and Item Number
- NONE, TABLE 2 ABSTRACT OF REPAIR/ REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description l Description of Work Date Repair/Replacement Class [
a Completed Plan Number 3.
{
Valve EGV0029 l
Replaced Valve 2/7/2024 Job 24000408 i
_ EGV0029 A' CCW heat exchanger tube-sidedrain l
Pump PEFO1B
' Performed weld repair l 3/13/2025 Job 25000854 B' Essential (base metal buildup) service water pump
l
_l RBBO!
Performed half nozzle 6/16/2025 Job 25002129 Reactor pressure repair of bottom vessel mounted instrumentation nozzle penetrationNo. 48 oe, r3
! Pipe EF-165-HBC Replaced piping and 6/23/2025 l Job 25002509 elbows
' Ultimate l
heat sink l cooling tower supply
__