Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML22325A338 + (ML22325A338)
- ML22325A343 + (ML22325A343)
- ML22325A347 + (ML22325A347)
- ML22325A349 + (ML22325A349)
- IR 05000254/2022401 + (ML22325A350)
- ML22325A351 + (ML22325A351)
- ML22325A352 + (ML22325A352)
- NRC-2022-1031, NRC-2022-1031-001 Renewal of Facility Operating License No. R-33 + (ML22325A353)
- ML22325A354 + (ML22325A354)
- ML22325A355 + (ML22325A355)
- ML22325A356 + (ML22325A356)
- RA-22-0334, Refuel 31 (O3R31) Steam Generator Tube Inspection Report + (ML22325A362)
- ML22326A003 + (ML22326A003)
- ML22326A006 + (ML22326A006)
- RA-22-0331, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 1 + (ML22326A013)
- ML22326A017 + (ML22326A017)
- ML22326A032 + (ML22326A032)
- ML22326A033 + (ML22326A033)
- PMNS20221177, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 4 + (ML22326A034)
- IR 05000336/2022301 + (ML22326A040)
- IR 05000220/2022010 + (ML22326A053)
- ML22326A059 + (ML22326A059)
- ML22326A060 + (ML22326A060)
- ML22326A061 + (ML22326A061)
- ML22326A062 + (ML22326A062)
- ML22326A063 + (ML22326A063)
- ML22326A064 + (ML22326A064)
- ML22326A065 + (ML22326A065)
- ML22326A066 + (ML22326A066)
- ML22326A067 + (ML22326A067)
- PMNS20221181, Meeting with Oklo to Discuss the Safety Analysis for Their Advanced Reactor Design + (ML22326A071)
- ML22326A098 + (ML22326A098)
- ML22326A100 + (ML22326A100)
- ML22326A107 + (ML22326A107)
- ML22326A108 + (ML22326A108)
- ML22326A109 + (ML22326A109)
- ML22326A113 + (ML22326A113)
- ML22326A114 + (ML22326A114)
- ML22326A116 + (ML22326A116)
- ML22326A117 + (ML22326A117)
- ML22326A119 + (ML22326A119)
- ML22326A120 + (ML22326A120)
- ML22326A121 + (ML22326A121)
- ML22326A122 + (ML22326A122)
- NL-22-0810, 4 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report + (ML22326A136)
- ML22326A154 + (ML22326A154)
- ML22326A155 + (ML22326A155)
- ML22326A163 + (ML22326A163)