ML22325A356
ML22325A356 | |
Person / Time | |
---|---|
Site: | 07100254 |
Issue date: | 11/23/2022 |
From: | Earl Love, Rivera-Verona A NRC/NMSS/DFM/IOB |
To: | GE-Hitachi Nuclear Energy Americas |
Shared Package | |
ML22325A354 | List: |
References | |
Download: ML22325A356 (1) | |
Text
NRC FORM 311 U.S. NUCLEAR REGULATORY COMMISSION 1. APPROVAL NUMBER (10- 2019) 0254 QUALITY ASSURANCE PROGRAM APPROVAL REVISION NUMBER FOR RADIOACTIVE MATERIAL PACKAGES 13
Pursuant to the Atomic Energy Act of 1954, as amended, the Energy Reorganization Act of 1974, as amended, and Title 10, Code of Federal Regulations, Chapter 1, Part 71, and in reliance on statements and representations heretofore made in Item 4 by the organization named in Item 2, the Quality Assurance Program identified in Item 4 is hereby approved. This approval is issued to satisfy the requirements of Section 71.101 of 10 CFR Part 71. This approval is subject to all applicable rules, regulations, and orders of the Nuclear Regulatory Commission now or hereafter in effect and to any conditions specified below.
STREET ADDRESS 3901 Castle Hayne Road, P.O. Box 780
CITY STATE ZIP CODE 3. DOCKET NUMBER Wilmington NC 28402 71- 0254
- 4. QUALITY ASSURANCE PROGRAM APPLICATION DATE(S)
December 14, 2021 (NEDO-11209-A, Revision 17)
- 5. CONDITIONS
- 1. Activities conducted regarding transportation packagings are to be executed under applicable criteria of 10 CFR Part 71, Subpart H. Authorized activities include: design, procurement, fabrication, assembly, testing, modification, maintenance, repair, and use of transportation packagings.
- 2. Records shall be maintained in accordance with the provisions of 10 CFR 71. Specifically :
- a. Records of each shipment of licensed material shall be maintained for 3 years after that shipment
[10 CFR 71.91(a)].
- b. Records providing evidence of packaging quality shall be maintained for 3 years after the life of the packaging [10 CFR 71. 9 1(d)]
- c. Records describing activities affecting packaging quality shall be maintained for 3 years after this Quality Assurance Program Approval is terminated [10 CFR 71. 1 35].
- 3. Planned and periodic audits of all aspects of the Quality Assurance Program shall be conducted in accordance with written procedures or checklists, by appropriately trained personnel not having direct responsibility in the areas being audited, in accordance with 10 CFR 71.137.
- 4. The QAPD implements GE Hitachi Nuclear Energy Quality Management System and is also applicable to:
Global Nuclear Fuel Americas, LLC, Wilmington NC
FOR THE U.S. NUCLEAR REGULATORY COMMISSION
SIGNATURE DATE
EARL LOVE, ACTING CHIEF INSPECTION AND OVERSIGHT BRANCH DIVISION OF FUEL MANAGEMENT OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS
NRC FORM 311 (10- 2019)