Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247L976 + (ML20247L976)
- ML20247L979 + (ML20247L979)
- ML20247L980 + (ML20247L980)
- PLA-3194, Forwards Change CC to Physical Security Plan.Change Withheld (Ref 10CFR73.21) + (ML20247L981)
- ML20247L983 + (ML20247L983)
- ML20247L984 + (ML20247L984)
- ML20247L986 + (ML20247L986)
- ML20247L987 + (ML20247L987)
- IR 05000295/1989025 + (ML20247L988)
- ML20247L991 + (ML20247L991)
- 05000313/LER-1988-030, :on 890620,determined That Unacceptable Modeling Technique Used in Stress Calculations,Potentially Affecting Seismic Capabilities of Eccs.Mods of Affecting Piping Completed + (ML20247L993)
- ML20247L994 + (ML20247L994)
- HL-5629, Agrees on Behalf of Util That Util Will Comply W/Listed Commitment Re Implementation of Thermo-Lag Fire Barrier Corrective Actions at Plant + (ML20247L996)
- ML20247L997 + (ML20247L997)
- ML20247L998 + (ML20247L998)
- ML20247M000 + (ML20247M000)
- ML20247M001 + (ML20247M001)
- ML20247M003 + (ML20247M003)
- ML20247M004 + (ML20247M004)
- ML20247M006 + (ML20247M006)
- ML20247M008 + (ML20247M008)
- ML20247M010 + (ML20247M010)
- ML20247M012 + (ML20247M012)
- ML20247M016 + (ML20247M016)
- ML20247M018 + (ML20247M018)
- ML20247M020 + (ML20247M020)
- ML20247M024 + (ML20247M024)
- ML20247M025 + (ML20247M025)
- 05000267/LER-1989-014, :on 890818,four Fire Barrier Penetration Seals Determined Deficient During Routine Maint Activities.Caused by Seals Not Meeting Cell Structure Criteria.Fire Watch Established & Repairs for Seals Initiated + (ML20247M026)
- ML20247M027 + (ML20247M027)
- ML20247M028 + (ML20247M028)
- ML20247M029 + (ML20247M029)
- ML20247M030 + (ML20247M030)
- 05000369/LER-1989-009-01, :on 890421,ESF Actuation Occurred During Realignment of turbine-driven Auxiliary Feedwater Pump, Causing Pump Suction Pressure to Drop & Opening Valves. Caused by Improper Tagout Removal Procedure + (ML20247M032)
- ML20247M033 + (ML20247M033)
- ML20247M035 + (ML20247M035)
- ML20247M036 + (ML20247M036)
- ML20247M040 + (ML20247M040)
- ML20247M043 + (ML20247M043)
- ML20247M045 + (ML20247M045)
- 05000414/LER-1988-030, :on 881111,Tech Spec 3.0.3 Entered When All Four power-range Channels of Nuclear Instrumentation Sys Inoperable.Caused by Inadequate procedures.Power-range Channel Calibr & Power Mismatches Analyzed + (ML20247M046)
- 05000352/LER-1989-029, :on 890427,main Control Room Received High Toxic Chemical Concentration Alarm on Vinyl Chloride & Chlorine Mode of Isolation Manually Initiated.Caused by Mineral Spirits from Painting.Painting Stopped + (ML20247M047)
- ML20247M048 + (ML20247M048)
- ML20247M051 + (ML20247M051)
- ML20247M052 + (ML20247M052)
- ML20247M053 + (ML20247M053)
- ML20247M055 + (ML20247M055)
- ML20247M057 + (ML20247M057)
- 05000368/LER-1986-015, :on 860801,review of Fire Barrier Penetration Log Identified 55 Penetrations Not Inspected within Tech Spec Required Interval.Caused by Inadequate Procedure & Personnel Error.Log & Test Procedures Revised + (ML20247M060)
- ML20247M061 + (ML20247M061)
- ML20247M062 + (ML20247M062)