Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20237A638 + (ML20237A638)
- ML20237A639 + (ML20237A639)
- NOC-AE-000246, Responds to NRC Re Violations Noted in Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613.Corrective Actions:Revised Procedure That Governs Fire Brigade Drills to Incorporate All Requirements of 10CFR50,App R + (ML20237A641)
- ML20237A642 + (ML20237A642)
- ML20237A643 + (ML20237A643)
- JPN-98-037, Requests Approval of Relief Request RR-16 to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI,IWE-5221 + (ML20237A644)
- ML20237A645 + (ML20237A645)
- NOC-AE-0225, Forwards Rev 12A to South Texas Project Physical Security Plan.Plan Withheld + (ML20237A646)
- ML20237A648 + (ML20237A648)
- B17393, Withdraws 960702 Proposed License Amend Request Re Changes to TS 3.6.E, Safety Relief Valves. No New Commitments Are Contained in Ltr + (ML20237A649)
- PNO-I-98-039, 980812,Millstone Unit 3 Was Shutdown to Repair Small Leak on Afws Discharge Noted.Current Leakage Does Not Exceed Regulatory Requirements & Shutdown Not Required by Tech Specs.Licensee Issued Press Release on 980811 + (ML20237A650)
- ML20237A652 + (ML20237A652)
- ML20237A653 + (ML20237A653)
- ML20237A655 + (ML20237A655)
- 05000333/LER-1987-018, :on 871108,reactor Tripped from High Neutron Flux Due to Erratic Operation of Reactor Water Recirculation Pump Speed Controller.Caused by Malfunction in Pump Speed Controller Switch.Controller Replaced + (ML20237A656)
- ML20237A657 + (ML20237A657)
- 05000373/LER-1987-036-01, :on 871114,control Room HVAC Sys a Ammonia Detector OXY-VC125A Tripped.Caused by Chemcassette Broken at Takeup Spool.Chemcassette Tape Replaced + (ML20237A658)
- ML20237A659 + (ML20237A659)
- PNO-II-98-037, on 980808,shutdown in Excess of 72 H Occurred. Licensee Inspected Approximately Half of Unit 2 Ice Condenser Bay Flow Channels from Intermediate Deck W/No Ice Obstructions in Excess of TS Limit Identified + (ML20237A660)
- NG-98-1360, Submits 90-day Response to GL 98-01, Year 2000 Readiness of Computer Sys at Nuclear Power Plants. Second Response Will Be Submitted by 990701 + (ML20237A662)
- PNO-IV-98-036, on 980805,rept of Low Level Waste Being Discharge to Ruptured Sanitary Sewer Line Occurred.Sewer Line One of Several Leading from Univ Research Reactor Facility.State of Wa Investigating Event + (ML20237A664)
- 05000498/LER-1987-012, :on 871102,high Head Safety Injection Sys Cold Leg Injection Valves Closed.Caused by Inadequate Training & Personnel Error.Mgt Reemphasized Proper Use of Procedures, Annunciators & Attention to Details + (ML20237A665)
- ML20237A666 + (ML20237A666)
- NOC-AE-000254, Notifies NRC of Change in Reactor Operator Status of Mj Bernhardt,License 42578.Encl Withheld Per 10CFR2.790(a)(6) + (ML20237A668)
- B17286, Provides Alternative to Requirements of ASME Boiler & Pressure Code,Section XI,IWA-4000 for Component Where Section Thickness Has Been Reduced Below Min Design Thickness + (ML20237A670)
- L-98-009, Forwards Revised Us Enrichment Corp Avlis Enrichment Plant QA Program Description, Per Request of NRC + (ML20237A672)
- 05000298/LER-1987-024, :on 871106,HPCI Turbine Overspeed Trip Mechanism Failed to Automatically Reset During Testing Due to Binding of Tappet Assembly.Trip & Reset Function Checked Periodically Until Actions Received from GE + (ML20237A673)
- ML20237A676 + (ML20237A676)
- ML20237A679 + (ML20237A679)
- B17285, Responds to GL 98-01, Yr 2000 Readiness of Computer Systems at Npps. Licensee Has Pursued & Is Continuing to Pursue Yr 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Yr 2000 Readiness + (ML20237A680)
- ML20237A681 + (ML20237A681)
- ML20237A682 + (ML20237A682)
- ML20237A684 + (ML20237A684)
- ML20237A686 + (ML20237A686)
- BVY-98-124, Responds to NRC Re Violations Noted in Insp Rept 50-271/98-09.Corrective actions:OT-3114,OP-2172 & OP-2143 Were Revised to Allow Only Single Feedwater Pump in Standby Mode at One Time & to Control re-energization of Oil Pump + (ML20237A687)
- ML20237A688 + (ML20237A688)
- ML20237A689 + (ML20237A689)
- ML20237A690 + (ML20237A690)
- ML20237A691 + (ML20237A691)
- ML20237A692 + (ML20237A692)
- ML20237A693 + (ML20237A693)
- ML20237A695 + (ML20237A695)
- ML20237A696 + (ML20237A696)
- ML20237A697 + (ML20237A697)
- RC-98-0144, Submits Response to GL 98-01, Year 2000 Readiness of Computer Sys at Nuclear Power Plants. Listed Actions Have Been Accomplished.Util Is Scheduled to Have Yr 2000 Program at Station Completed by 991231 + (ML20237A699)
- ML20237A700 + (ML20237A700)
- ML20237A701 + (ML20237A701)
- 05000155/LER-1998-001, Forwards LER 98-001-00 Re Discovery During Facility Decommissioning of Severed Liquid Poison Tank Discharge Pipe.Rept Being Submitted IAW 10CFR50.72(b)(2)(iii) & 10CFR50.73(a)(2)(i)(B) + (ML20237A703)
- ML20237A705 + (ML20237A705)
- ML20237A707 + (ML20237A707)
- 05000155/LER-1998-001-01, :on 980714,during Facility Decommissioning, Found Liquid Poision Tank Discharge Pipe Severed.Caused by Corrosion.Staff Reviewed Current Decommissioning Surveillance Testing on safety-related SSCs + (ML20237A708)