Forwards SER Re Util Responses to Generic Ltr 83-28, Item 2.1,Parts 1 & 2 Concerning Identification of All safety-related Equipment & Confirming Receipt of Transmittal of Technical Info.Util Responses Acceptable
ML20237A692
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/10/1987
From: Stefano J
Office of Nuclear Reactor Regulation
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20237A694 List:
References
GL-83-28, TAC-59618, NUDOCS 8712150176
Download: ML20237A692 (2)


Text

' .

December 10, 1987 i

1 Docket No. 50-341 Mr. B. Ralph Sylvia Group Vice President Nuclear Operations Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Sylvia:

SUBJECT:

TRANSMITTAL OF SAFETY EVALUATION REPORT ON FERMI-2 CONFORMANCE WITH THE PROVISIONS OF TASK ITEM 2.1 0F NRC GENERIC LETTER 83-28 (TAC NO. 59618)

Detroit Edison was required by NRC Generic Letter 83-28 Item 2.1 (Part 1) to confirm that all components whose functioning is required to trip the reactor l are identified as safety-related on all plant documentation and in information handling systems that are used to control all activities performed on the safety-related equipment. With respect to Item 2.1 (Part 2), Detroit Edison i was required to confirm that they have established on interface with either i the NSSS or with the vendors of each of the components of the Reactor Trip System, including the periodic communication between Detroit Edison and the vendor of positive feedback which confirms receipt of transmittals of l technical information. The staff has reviewed Detroit Edison's response to 1

both Parts 1 and 2 of Item 2.1 and find your responses to be acceptable. The I staff's SERs relative to Fermi-2's acceptable compliance with Item 2.1 (Part 1) l and Item 2.1 (Part 2) are contained in Enclosures (1) and (2), of this letter, l respectively.  ;

If there are any questions concerning this transmittal, please let me know.  !

Sincerely,

%ing y;.ya u John J. Stefano, Project Manager 8712150176 871210 Project Directorate III-1 gDR ADOCK0500g1 Division of Reactor Projects - III, IV, V

& Special Projects i

Enclosures:

DISTRIBUTION As stated Docket File JStefano PD 31 Plant Memo OGC-Beth cc w/ encl: NRC & Local PDRs EJordan See next page GHolahan JPartlow RIngram ACRS (10) bec w/ enc 1: A. Thadani J. Mauck D. Lasher P, 1:DRSP D/PD31: DRS JS efano:lt MVirgilio .

12 0/87 12/go /87 4

i

, Mr. B. Ralph Sylvia Detroit Edison Company Fermi-2 Facility l

cc:

l Mr. Harry H. Voigt, Esq. Mr. Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv. Planning Review Section 1333 New Hampshire Avenue, N.W. Michigan Public Service Commission Washington, D.C. 20036 6545 Mercantile Way P. O. Box 30221 John Flynn, Esq. Lansing, Michigan 48909 Senior Attorney Detroit Edison Company Regional Administrator, Region III 2000 Second Avenue U.S. Nuclear Regulatory Commission Detroit, Michigan 48226 799 Roosevelt Road Glen Ellyn, Illinois 60137' Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. Steve Frost Supervisor-Licensing Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 j

Mr. Thomas Randazzo

]

Director, Regulatory Affairs Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Walt Rogers U.S. Nuclear Regulatory Commission  !

Resident Inspector's Office l 6450 W. Dixie Highway l Newport, Michigan 48166 Monroe County Office of Civil  ;

Preparedness 963 South Raisinville Monroe, Michigan 48161

. _ . _ . _ _ _ _ - - _ _ - - _ . _ _ - _ _ _ - _ _ _ _ - _ . _ _ - -