Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20217N967 + (ML20217N967)
- ML20217N968 + (ML20217N968)
- ML20217N969 + (ML20217N969)
- ML20217N970 + (ML20217N970)
- ML20217N972 + (ML20217N972)
- NOC-AE-000143, Special Rept:On 980413,declared Primary Meteorological Tower Instrumentation Inoperable Due to Performance of semi-annual Sys Calibr Required by TS 3.3.3.4.Successfully Calibr & Returned Primary Meterological Tower Instruments to Svc + (ML20217N975)
- ML20217N976 + (ML20217N976)
- ML20217N977 + (ML20217N977)
- ML20217N979 + (ML20217N979)
- ML20217N980 + (ML20217N980)
- ML20217N981 + (ML20217N981)
- ML20217N982 + (ML20217N982)
- ML20217N984 + (ML20217N984)
- ML20217N986 + (ML20217N986)
- ML20217N987 + (ML20217N987)
- ML20217N989 + (ML20217N989)
- NUREG-1431, Forwards RAI Re Proposed Amend to TS for Byron & Braidwood Stations,To Be Consistent W/Improved TSs in NUREG-1431, STS-Westinghouse Plants, Rev 1.Requests Response to RAI within 30 Days of Date of Ltr + (ML20217N991)
- ML20217N992 + (ML20217N992)
- ML20217N994 + (ML20217N994)
- ML20217N995 + (ML20217N995)
- ML20217N996 + (ML20217N996)
- ML20217N999 + (ML20217N999)
- ML20217P000 + (ML20217P000)
- HBL-98-008, Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I + (ML20217P001)
- ML20217P002 + (ML20217P002)
- ML20217P004 + (ML20217P004)
- ML20217P005 + (ML20217P005)
- ML20217P006 + (ML20217P006)
- ML20217P008 + (ML20217P008)
- ML20217P009 + (ML20217P009)
- ML20217P010 + (ML20217P010)
- ML20217P011 + (ML20217P011)
- ML20217P012 + (ML20217P012)
- ML20217P013 + (ML20217P013)
- ML20217P014 + (ML20217P014)
- ML20217P015 + (ML20217P015)
- IR 05000315/1998005 + (ML20217P018)
- 05000327/LER-1999-002, Forwards LER 99-002-00 Re Start of Units 1 & 2 EDGs as Result of Cable Being Damaged During Installation of Thermo- Lag for Kaowool Upgrade Project + (ML20217P020)
- NSD-NRC-97-5282, Forwards non-proprietary & Proprietary Correspondence Previously Sent Informally Over Period of 970519-0530. Proprietary Info Withheld,Per 10CFR2.790 + (ML20217P021)
- SVP-98-160, Forwards 1997 Annual Radiological Environ Operating Rept for Quad Cities Station. Rept Contains Results of Radiological Environ Meteorological Monitoring Programs + (ML20217P022)
- ML20217P024 + (ML20217P024)
- 05000454/LER-1997-023, :on 971229,1B DG Control Power Wiring Discrepancy Occurred Due to Mod Installation Error & Programmatic Deficiencies.Caused by Failure to Use self-check Principles.Counseled Technician + (ML20217P026)
- 05000327/LER-1999-002-03, :on 990916,EDG Started as Result of Cable Being Damaged During Installation of Thermo-Lag for Kaowool Upgrade Project.Caused by Inadequate pre-job Briefing. Involved Individuals Were Counseled on Event + (ML20217P027)
- ML20217P028 + (ML20217P028)
- ML20217P029 + (ML20217P029)
- 05000336/LER-1997-033-01, Forwards LER 97-033-01,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 970727.LER Submitted Per 10CFR50.73(a)(2)(ii) & 10CFR50.73(a)(2)(v) + (ML20217P030)
- ML20217P031 + (ML20217P031)
- ML20217P032 + (ML20217P032)
- ML20217P033 + (ML20217P033)
- ML20217P038 + (ML20217P038)
- ML20217P039 + (ML20217P039)