Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215K970 + (ML20215K970)
- ML20215K971 + (ML20215K971)
- ML20215K972 + (ML20215K972)
- 05000440/LER-1986-063, :on 860923,discovered That on 860918,Unit 1 Div 3 125-volt Dc Distribution Bus ED-1-C Disconnected from Unit 1 Div 3 Battery & Normal Charger & cross-connected to Unit 2 Div 3 Battery & Charger.Procedure Revised + (ML20215K974)
- ML20215K975 + (ML20215K975)
- ML20215K976 + (ML20215K976)
- ML20215K977 + (ML20215K977)
- ML20215K978 + (ML20215K978)
- 05000331/LER-1986-019, :on 860922,250-volt Dc Battery Declared Inoperable.Caused by Degradation of Positive Plates Due to Galvanic Reaction Resulting from Impurities in Plate Weld Matls.Battery Tested & 16 Cells Replaced + (ML20215K982)
- ML20215K984 + (ML20215K984)
- ML20215K987 + (ML20215K987)
- ML20215K988 + (ML20215K988)
- 05000366/LER-1986-026-01, :on 860919,reactor Protection Sys Actuation Occurred Initiating one-half Primary Containment Isolation Sys Valve Group 2 & RHR Shutdown Cooling Sys Isolation. Caused by False Signals + (ML20215K989)
- ML20215K990 + (ML20215K990)
- ML20215K992 + (ML20215K992)
- AECM-86-0057, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1985. Affirms That Past & Present Determinations of Solid Radwaste Total Ci Quantity Performed by Measurement, Not Estimation + (ML20215K993)
- ML20215K994 + (ML20215K994)
- ML20215K997 + (ML20215K997)
- ML20215K998 + (ML20215K998)
- ML20215K999 + (ML20215K999)
- ML20215L000 + (ML20215L000)
- 05000336/LER-1986-008-02, :on 860920,6 of 16 Valves Failed Main Steam Safety Valve Simmer Test.Caused by Setpoint Drift.Increased Accuracy Pressure Gauges Used to Reduce Test Error & Spring & Ambient Temps Recorded + (ML20215L002)
- ML20215L005 + (ML20215L005)
- TXX-6050, Interim Deficiency Rept CP-85-50 Re Improper Welding Processes Used in Mfg of Cable Tray Tee Fittings.Initially Reported on 851206.Testing Program Implemented.Vendor Identifying Min Weld Requirements.Next Rept by 861219 + (ML20215L009)
- ML20215L011 + (ML20215L011)
- ML20215L012 + (ML20215L012)
- ML20215L013 + (ML20215L013)
- ML20215L015 + (ML20215L015)
- ML20215L017 + (ML20215L017)
- ML20215L018 + (ML20215L018)
- ML20215L020 + (ML20215L020)
- ML20215L021 + (ML20215L021)
- TXX-6048, Interim Deficiency Rept CP-85-35 Re Design & Const Activities of Cable Tray Hanger Program.Initially Reported on 850906.Verification Program implemented.As-built Drawings for Supports Developed.Next Rept Expected by 870130 + (ML20215L023)
- ML20215L024 + (ML20215L024)
- IR 05000458/1986024 + (ML20215L025)
- ML20215L026 + (ML20215L026)
- ML20215L027 + (ML20215L027)
- ML20215L028 + (ML20215L028)
- ML20215L029 + (ML20215L029)
- ST-HL-AE-2146, Forwards Addl Info Re Pneumatic Containment Purge & Vent Valve Operability,Supporting Util 850430,1030,860915 & 0929 Submittals.W/Six Oversize Drawings + (ML20215L032)
- TXX-6035, Interim Deficiency Rept CP-86-44 Re Welded Attachments to Embedded Strip Plates.Initially Reported on 860605.Civil Engineering Instruction CEI-20 Revised to Clarify Anchor Spacing Criteria.Next Rept Will Be Submitted by 870206 + (ML20215L033)
- ML20215L034 + (ML20215L034)
- ML20215L037 + (ML20215L037)
- ML20215L038 + (ML20215L038)
- ML20215L039 + (ML20215L039)
- ML20215L040 + (ML20215L040)
- ML20215L041 + (ML20215L041)
- ML20215L042 + (ML20215L042)
- ML20215L045 + (ML20215L045)
- ML20215L047 + (ML20215L047)
- ML20215L050 + (ML20215L050)