Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215C847 + (ML20215C847)
- ML20215C848 + (ML20215C848)
- 05000362/LER-1986-012-01, :on 860901,02,18 & 19,fuel Handling Isolation Sys Train B Spuriously Actuated by Noble Gas Airborne Radiation Monitor 3RE7823B2.Caused by Monitor Sensitivity to Random Electrical Noise + (ML20215C849)
- ML20215C850 + (ML20215C850)
- ML20215C851 + (ML20215C851)
- ML20215C852 + (ML20215C852)
- ML20215C854 + (ML20215C854)
- ML20215C855 + (ML20215C855)
- 05000322/LER-1986-037, :on 860908,fire Watch Missed in Relay Room. Caused by Inadvertent CO2 Injection Into Normal Switchgear Room Forcing Evacuation of Control Bldg.Fire Watch Reestablished + (ML20215C857)
- ML20215C858 + (ML20215C858)
- ML20215C860 + (ML20215C860)
- ML20215C861 + (ML20215C861)
- ML20215C862 + (ML20215C862)
- RBG-26-087, Gulf States Utilities Co Annual Rept,1986 + (ML20215C863)
- ML20215C867 + (ML20215C867)
- IR 05000461/1986015 + (ML20215C868)
- ML20215C872 + (ML20215C872)
- 05000354/LER-1986-065, :on 860906,reactor Scram Occurred Due to Reactor Low Water Level 3 Signal.Caused by Unstable Control of Reactor Feedpump C Due to Incomplete Tuning of Associated Controller Electronics.Tuning Completed + (ML20215C873)
- ML20215C874 + (ML20215C874)
- ML20215C875 + (ML20215C875)
- SNRC-1283, BWR Owners Group Rept on Operational Design Basis of Selected Safety-Related Motor-Operated Valves + (ML20215C877)
- 05000461/LER-1986-020, :on 861110,HPCS Sys Pump Suction Valve Alignment auto-shifted from RCIC to Suppression Pool.Caused by RCIC Storage Tank Level Transmitter Tripping Due to Rust Particulate Inside One Transmitter + (ML20215C878)
- ML20215C879 + (ML20215C879)
- ML20215C882 + (ML20215C882)
- W3P86-2538, Responds to 860820 Generic Ltr 86-14 Re Operator Licensing & Requalification Exams Schedule for FY87-90.Schedules Encl + (ML20215C887)
- ML20215C888 + (ML20215C888)
- ML20215C889 + (ML20215C889)
- ML20215C890 + (ML20215C890)
- ML20215C892 + (ML20215C892)
- ML20215C894 + (ML20215C894)
- ML20215C895 + (ML20215C895)
- ML20215C898 + (ML20215C898)
- ML20215C899 + (ML20215C899)
- ML20215C900 + (ML20215C900)
- ML20215C901 + (ML20215C901)
- ML20215C902 + (ML20215C902)
- 05000325/LER-1986-023, :on 860905,Tech Spec 3.0.3 Entered When Reactor Core Spray Subsys B & RHR LPCI Loop B Found Inoperable.Caused by Loss of 125-volt Dc Control Power. Control Power Returned + (ML20215C904)
- ML20215C907 + (ML20215C907)
- ML20215C908 + (ML20215C908)
- ML20215C909 + (ML20215C909)
- ML20215C910 + (ML20215C910)
- IR 05000424/1986081 + (ML20215C911)
- ML20215C913 + (ML20215C913)
- ML20215C916 + (ML20215C916)
- ML20215C917 + (ML20215C917)
- 05000155/LER-1986-006-01, :on 860825,fire Barrier Determined to Be Nonfunctional & Fire Watch Not Established within 1 H.Caused by Procedural Inadequacy.Procedure Modified to Clarify Definition of Nonfunctional Fire Barriers + (ML20215C918)
- ML20215C920 + (ML20215C920)
- ML20215C921 + (ML20215C921)
- ML20215C923 + (ML20215C923)
- ML20215C924 + (ML20215C924)
- ML20215C926 + (ML20215C926)