ML20215C920

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for May 1986
ML20215C920
Person / Time
Site: Callaway 
Issue date: 05/31/1986
From: Evans S
UNION ELECTRIC CO.
To:
Shared Package
ML20215C253 List:
References
NUDOCS 8610100528
Download: ML20215C920 (4)


Text

...

a _.

o i

4 DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 1

DATE 6/6/86 (Revised 8/5/86)

CWhra mz s.

R.

EVANR l

TELEPHONE 314/676-8742 PART A OPERATIONS

SUMMARY

Plant operated at 100% power with the following exceptions:

Date Duration Reason l

5/18/86 208.5 hrs.

Repair leak on "C" S/G Feedwater Check Valve.

l 5/30/86 18.4 hrs.

Investigate / repair hot spot on isophase bus duct.

Requalification training for Licensed Operators is currently in progress.

PART B PORV AND SAFETY VALVE

SUMMARY

None l

l i

8610100520 860012

@h PDR ADOCK 05000483 PDR CA-f804 R

04/10/85 QDP-ZZ-04204

~'

Page 1 of 4

/

--,,..r..,_...m,,-n,-,..,o.a

~,. - - -

i _ _

. _ _ _.i __. __ _

1 Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-483 UNIT Callaway DATE 6/6/86 (Rev. 8/5/86)

S. R. EVANS COMPLETED BY 314/676-8742 TELEPHONE MONTH MAY 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe Net) 1 1109 37 726 1101 27 2

g 1114 0

3 g

i 1109 0

4 20 1105 0

5 21 1103 22 0

g 1103 0

y 23 1101 0

8 y

1101 0

g 5

977 0

'10 as 996 538 11 27 j

1077 1050 f

12 3

1100 1071 l

13 29 1107 439 14 gg 1103 324 13 3

to 1090 l

1 l

Page 2 of 4 l

l Ch-0804 l

04/10/85 QDP-ZZ-04204

~.

4


r

~ ~ -.

Parc D OPERATING DATA REPORT 50-483 DOCKET NO.

f%11 - I UNIT 6/6/86 (Rev. 8/5/86)

DATE S. R. EVANS COMPLETED 8Y 314/676-8742 TELEPHONE i

OPERATING STATUS

( YTD CUM )

766 (1671 12685.5)

May 1986 08088 HOUR 8 tN REPORTING PER100:

1. REponTiNo ptRioo:

3411 max. oEpENo. cApAc Ty imi:

1170

2. cunRENTLY AuTwont2ED POWER LEVEL (MWo:

DESIGN ELECTRICAL MATING (MWe.Neo: 1171*

  • At stretch power level which is not currently authorized under the 0 erati License.

100%

1 POWER LEVELTOWHICM RESTRICTE[ lip ANYlS I:

4. REASONS pom RESTRicTIONllP ANYh THIS MONTM YR TO DATE cuMULATsvE 566.8 2337.9 10801.4
5. NUMSER OF MouRS REACTOR WAS CRITICAL 0

0 0

s. REAcron REstavE SMuTooWN MouRS 517.1 2204.5 10391.9 l
7. MOuRS GENERATOR ON uNE......

0 0

0 E. unit RESEnvE SMuTDOWN MQuMS

......l. 628.231 6.793.090 32.810.642

s. Gross THERMAL ENERGY GENERATED (MWHI 546,059 2,297,253 11,111,196 to. cross ELECTRICAL ENERoY GENERATED (MWMt..........,,.. 517.736 2,179,382 10,548,169 tt. NET ELECTRICAL ENERGY GENERATED IMWM 76.2%

64.5%

85.1%

12. REActom SERvics F AcTom.....................,,,,,

76.2%

64.5%

85.li l

13. REACTOR Ava:LAesuTY PAcTom t.,.......

69.5%

60.8%

81.9%

i 14. UNIT SERVICE P ACTOR..............................

69.5%

60.8%

81.9%

l 15. uNir Av AiLAesuTY PActon.........................

62.1%

53.7%

74,2%

14. unit CAP AciTY PACTom luene Moct.

59.4%

51.4%

71. 0 r
17. uNir cAPActTY P Acton tu.ing D en Man.........,.......

30.5%

9.9%

7.0%

1 is. umT PoncED ouTAot nATs........................

19. SMuTDOWNS SCHEDULED OVER NEXT E MONTHS ITYPE. DATL AND OuRAfl0N OF EACMl:None
20. IF SMUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OP STARTUP:

CA-#804 Page 3 of 4 04/10/85 QDP-ZZ-04204 i

?

it Il 4-Ii II Part E DOCKET NO.

50-483 1:

UN4T SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway L

t 1

I) ATE 6/6/86 (Rev. 8/5/86) i-COMPLETED sy S.

R.

EVANS REPORT MONTH MAY 1986 TELEPHONE 314/676-8742

}

l.

1 i

t METHOD OF j

i l

l' TYPE SHUTTING DOWN 4

i-F: FOROED DURATION THE REACTOR OR NO.

DATE 5: SCHEDutED IHOUHSI REASON REDUC 8NG POWER CORRECTIVE ACTION 5KOteMENTS r

F 208.5 A

1 Repair leak on "C" S/G Feedwater i

l 9.

5/18/8 Check Valve.

i F

18.9 A

1 Hot spot on isophase bus duct.

l' I

l 10.

5/30/8 k

i e

i l

!~

i i

?

b 1

1.

.i I

SURAMARY:

i mEAson tsEneOD A: EQtArteENT FA8 LUBE GEEPLA804 8: IdANUAL 3: BfAletT.OR TEST 2: 88408UAL SCRAst i

oon C: REFUEUO4G 3: AttfOe4ATIC SCRAtl

@ G.

D: REGULATORY. RESTRICT 9006 4: 95158GEEfLAIIS t >+ e E: OPERATOR TkAltdIBIG Alep N R *O

~

LICE 885E EEARIINAT90N 8 m F: ADOS 80ISTRanVE O"

C: OPERATIOpeAL Emmet (EEFLAIN) i 1: @

08 OtIWAGEEFLA8063

[.

\\~

s~

Page 4 of 4 i'