o i
4 DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 1
DATE 6/6/86 (Revised 8/5/86)
CWhra mz s.
R.
EVANR l
TELEPHONE 314/676-8742 PART A OPERATIONS
SUMMARY
Plant operated at 100% power with the following exceptions:
Date Duration Reason l
5/18/86 208.5 hrs.
Repair leak on "C" S/G Feedwater Check Valve.
l 5/30/86 18.4 hrs.
Investigate / repair hot spot on isophase bus duct.
Requalification training for Licensed Operators is currently in progress.
PART B PORV AND SAFETY VALVE
SUMMARY
None l
l i
8610100520 860012
@h PDR ADOCK 05000483 PDR CA-f804 R
04/10/85 QDP-ZZ-04204
~'
Page 1 of 4
/
--,,..r..,_...m,,-n,-,..,o.a
~,. - - -
i _ _
. _ _ _.i __. __ _
1 Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT Callaway DATE 6/6/86 (Rev. 8/5/86)
S. R. EVANS COMPLETED BY 314/676-8742 TELEPHONE MONTH MAY 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1 1109 37 726 1101 27 2
g 1114 0
3 g
i 1109 0
4 20 1105 0
5 21 1103 22 0
g 1103 0
y 23 1101 0
8 y
1101 0
g 5
977 0
'10 as 996 538 11 27 j
1077 1050 f
12 3
1100 1071 l
13 29 1107 439 14 gg 1103 324 13 3
to 1090 l
1 l
Page 2 of 4 l
l Ch-0804 l
04/10/85 QDP-ZZ-04204
~.
4
r
~ ~ -.
Parc D OPERATING DATA REPORT 50-483 DOCKET NO.
f%11 - I UNIT 6/6/86 (Rev. 8/5/86)
DATE S. R. EVANS COMPLETED 8Y 314/676-8742 TELEPHONE i
OPERATING STATUS
( YTD CUM )
766 (1671 12685.5)
May 1986 08088 HOUR 8 tN REPORTING PER100:
- 1. REponTiNo ptRioo:
3411 max. oEpENo. cApAc Ty imi:
1170
- 2. cunRENTLY AuTwont2ED POWER LEVEL (MWo:
DESIGN ELECTRICAL MATING (MWe.Neo: 1171*
- At stretch power level which is not currently authorized under the 0 erati License.
100%
1 POWER LEVELTOWHICM RESTRICTE[ lip ANYlS I:
- 4. REASONS pom RESTRicTIONllP ANYh THIS MONTM YR TO DATE cuMULATsvE 566.8 2337.9 10801.4
- 5. NUMSER OF MouRS REACTOR WAS CRITICAL 0
0 0
- s. REAcron REstavE SMuTooWN MouRS 517.1 2204.5 10391.9 l
- 7. MOuRS GENERATOR ON uNE......
0 0
0 E. unit RESEnvE SMuTDOWN MQuMS
......l. 628.231 6.793.090 32.810.642
- s. Gross THERMAL ENERGY GENERATED (MWHI 546,059 2,297,253 11,111,196 to. cross ELECTRICAL ENERoY GENERATED (MWMt..........,,.. 517.736 2,179,382 10,548,169 tt. NET ELECTRICAL ENERGY GENERATED IMWM 76.2%
64.5%
85.1%
- 12. REActom SERvics F AcTom.....................,,,,,
76.2%
64.5%
85.li l
- 13. REACTOR Ava:LAesuTY PAcTom t.,.......
69.5%
60.8%
81.9%
i 14. UNIT SERVICE P ACTOR..............................
69.5%
60.8%
81.9%
l 15. uNir Av AiLAesuTY PActon.........................
62.1%
53.7%
74,2%
- 14. unit CAP AciTY PACTom luene Moct.
59.4%
51.4%
- 71. 0 r
- 17. uNir cAPActTY P Acton tu.ing D en Man.........,.......
30.5%
9.9%
7.0%
1 is. umT PoncED ouTAot nATs........................
- 19. SMuTDOWNS SCHEDULED OVER NEXT E MONTHS ITYPE. DATL AND OuRAfl0N OF EACMl:None
- 20. IF SMUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OP STARTUP:
CA-#804 Page 3 of 4 04/10/85 QDP-ZZ-04204 i
?
it Il 4-Ii II Part E DOCKET NO.
50-483 1:
UN4T SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway L
t 1
I) ATE 6/6/86 (Rev. 8/5/86) i-COMPLETED sy S.
R.
EVANS REPORT MONTH MAY 1986 TELEPHONE 314/676-8742
}
l.
1 i
t METHOD OF j
i l
l' TYPE SHUTTING DOWN 4
i-F: FOROED DURATION THE REACTOR OR NO.
DATE 5: SCHEDutED IHOUHSI REASON REDUC 8NG POWER CORRECTIVE ACTION 5KOteMENTS r
F 208.5 A
1 Repair leak on "C" S/G Feedwater i
l 9.
5/18/8 Check Valve.
i F
18.9 A
1 Hot spot on isophase bus duct.
l' I
l 10.
5/30/8 k
i e
i l
!~
i i
?
b 1
1.
.i I
SURAMARY:
i mEAson tsEneOD A: EQtArteENT FA8 LUBE GEEPLA804 8: IdANUAL 3: BfAletT.OR TEST 2: 88408UAL SCRAst i
oon C: REFUEUO4G 3: AttfOe4ATIC SCRAtl
@ G.
D: REGULATORY. RESTRICT 9006 4: 95158GEEfLAIIS t >+ e E: OPERATOR TkAltdIBIG Alep N R *O
~
LICE 885E EEARIINAT90N 8 m F: ADOS 80ISTRanVE O"
C: OPERATIOpeAL Emmet (EEFLAIN) i 1: @
08 OtIWAGEEFLA8063
[.
\\~
s~
Page 4 of 4 i'