Revised Pages to Monthly Operating Rept for Apr 1986
ML20215C851
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/30/1986
From: Hutchison L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17278B028 List:
References
NUDOCS 8610100488
Download: ML20215C851 (2)


Text

_________________-______ - -_ _ _ ___________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1. Docket 50-397 0PERATING STATUS ununuuuuuuuuuuuuuuuuuuuuuuuuuuuunnan u HASHINGTON HUCLEAR 2 m
2. Reporting Periods 04/01/86- Outage + On-line Hess 719.0 unuxuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun
5. Utllity Centact LEONARD NOTCHISON (509) 377-2501 X2486 AVERAGE DAILY POWER LEVEL (MWe) PLOT 3323 HRSHINGTON NUCLE.RR 2 4 Licensed Thermal Power (MHt):
5. Nameplate Rating (Gross MHe): 1201
6. Design Electrical Rating (Net MWe): 1100
7. Maximum Dependable Capacity (Gross MHe): 1140 DCSION E2EC. ftftTING = 1100
8. Maximum Dependable Capacity (Not MHe): 1995 , , , , , , , , m, , g
9. If Changes Occur Above Since Last Report, Olve Reasons ,
10. Power Level To Hhich Restricted, If Any (Het MHe): NO NET POHER OUTPUT THIS MONTH
11. Reasons for Restrictions, If Any 400 NONE 1000-.

MONTH YEAR CUMULATIVE

12. Report Period Hrs 719.0 2.879.0 12.079.2 - 80
15. Hours Reactor Critical .0 1.779.4 9.095.6 340.4 C
14. Rx Reserve Shtchn Hrs .0 340.4
15. Hrs Generator On-Line .0 1.738.1 8.764.6 k _,,
16. Unit Reserve Shtchn Hrs .0 381.7 381.7 g 3
17. Gross Therm Ener (MHH) 0 3.877.530 21 441.810 goo NN

- O 0.

7.099.030 .g ID O

18. Gross Elec Ener (MHH) 0 1.275.780 00
19. Net Elec Ener (MHH) 0 1.223.978 6.810.751
20. Unit Service Factor .0 60.4 72.6 (D g
21. Unit Avail Factor .0 73.6 75.7 -30 N OQ O <[
22. Unit Cap Factor (MDC Net) .0 38.8 51.5
25. Unit Cap Factor (DER Net) ,. 0 38.6 51 .3
24. Unit Forced Outage Rate 100.0 29.7 14.8 g a' s

~

t'o ' t's 'iO' 'is ' m tr 719.0 735.2 1.520.2 g DRYS

25. Fore.ed Outage Hours
26. Shutdoms Sched Ovver Next 6 Months (Type,Date, Duration): derm p ftPRIL 1988 HONE
27. If Currently Shutdown Estimated Startup Date: 05/30/86 PAGE 2-402
  • s j

T-- - --.-;- , . , , , . . . , , , _ _ _ , _ , , , , _ _ ,

- s OPERATING DATA REPORT WNP-2 01-May-86

1. DOCKET: 50-397 ,
2. REPORTING PERIOD: Apr-86 OUTAGE + ON-LINE HOURS 719
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486 l

!4 LICENSED THERMAL POWER (MWt): 3323

' 5. NAMEPLATE RATING (GROSS MWe): 1200.1

6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
9. MAXIMUM DEPENDABLE CAPACITY (NET MWe): . 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE. REASONS:

(

, ----_ _ _ _ ____ _N_O_N E -- === _ _--- _______--_--______----________- _ -___

-_-____-- _ _ = - _ - _ _ _ _ - _ _ _ _ _ - - _ _ _ - - _ _ _ _ - _ _ _ _ _ ______ ._ _______-______

10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe): _ _ _ _ _ _ _ _ _ _ _
11. REASONS FOR RESTRICTIONS, IF ANY: __fiONE________________________________

________----__--____----__---=-- __-_ _ ==______=_==____--________

_____-____---__-----__---____-____--__--=-_ -___-_-__---_--- _____ - - _ _

--_____----____-_-__------ ______--___-___---_________-- _= ___ -

MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 719 2879 12079.2
13. HOURS REACTOR CRITICAL O.O 1779.4 9095.5
14. RX RESERVE SHTDWN HRS 0.0 340.4 340.4
15. HRS GENERATOR ON LINE O.0 1738.1 8764.5
16. UNIT RESERVE SHUTDOWN HOURS 0.0 381.7 381.7
17. GROSS THERMAL ENERGY (MWH) O 3877530 21441810
18. GROSG ELECTRICAL ENERGY (MWH) O 1275780 7099030
19. NET ELECTRICAL ENERGY (MWH) 0 1223978 6810751
20. UNIT SERVICE FACTOR O.0% 60.4% 72.6%
21. UNIT AVAILABILITY FACTOR O.0% 73.6% 75.7%
22. UNIT CAPACITY FACTOR (MDC NET) 0.0% 38.8% 51.5%
23. UNIT CAPACITY FACTOR (DER NET) 0.0% 38.6% 51.3%

24 UNIT FORCED OUTAGE RATE O.0% 0.9% 8.4%

25. FORCED OUTAGE HOURS 0.0 16.2 801.2-
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):