- 1. Docket 50-397 0PERATING STATUS ununuuuuuuuuuuuuuuuuuuuuuuuuuuuunnan u
HASHINGTON HUCLEAR 2 m
- 2. Reporting Periods 04/01/86-Outage + On-line Hess 719.0 unuxuuuuuuuuuuuuuuuuuuuuuuuuuuuunnun
- 5. Utllity Centact LEONARD NOTCHISON (509) 377-2501 X2486 AVERAGE DAILY POWER LEVEL (MWe) PLOT 4 Licensed Thermal Power (MHt):
3323 HRSHINGTON NUCLE.RR 2
- 5. Nameplate Rating (Gross MHe):
1201
- 6. Design Electrical Rating (Net MWe):
1100
- 7. Maximum Dependable Capacity (Gross MHe):
1140 DCSION E2EC. ftftTING = 1100
- 8. Maximum Dependable Capacity (Not MHe):
1995 m,
g
- 9. If Changes Occur Above Since Last Report, Olve Reasons
- 10. Power Level To Hhich Restricted, If Any (Het MHe):
NO NET POHER OUTPUT THIS MONTH
- 11. Reasons for Restrictions, If Any 400 NONE 1000-.
MONTH YEAR CUMULATIVE
- 12. Report Period Hrs 719.0 2.879.0 12.079.2
- 80
- 15. Hours Reactor Critical
.0 1.779.4 9.095.6 C
- 14. Rx Reserve Shtchn Hrs
.0 340.4 340.4 k
- 15. Hrs Generator On-Line
.0 1.738.1 8.764.6 g
- 16. Unit Reserve Shtchn Hrs
.0 381.7 381.7 3
NN
- 17. Gross Therm Ener (MHH) 0 3.877.530 21 441.810 goo
- O 0.
ID O
- 18. Gross Elec Ener (MHH) 0 1.275.780 7.099.030
.g 00
- 19. Net Elec Ener (MHH) 0 1.223.978 6.810.751
- 20. Unit Service Factor
.0 60.4 72.6 (D g N
- 21. Unit Avail Factor
.0 73.6 75.7
-30 OQ
- 22. Unit Cap Factor (MDC Net)
.0 38.8 51.5 O <[
- 25. Unit Cap Factor (DER Net)
,. 0 38.6 51.3 g
a' s
t'o '
t's
'iO'
'is '
m
~
tr
- 24. Unit Forced Outage Rate 100.0 29.7 14.8 DRYS
- 25. Fore.ed Outage Hours 719.0 735.2 1.520.2 g
derm
- 26. Shutdoms Sched Ovver Next 6 Months (Type,Date, Duration):
p ftPRIL 1988 HONE
- 27. If Currently Shutdown Estimated Startup Date:
05/30/86 PAGE 2-402
- s T--
j
s OPERATING DATA REPORT WNP-2 01-May-86 1.
DOCKET: 50-397 2.
REPORTING PERIOD:
Apr-86 OUTAGE + ON-LINE HOURS 719 3.
UTILITY CONTACT:
LEONARD HUTCHISON (509) 377-2486 l
!4 LICENSED THERMAL POWER (MWt):
3323
' 5.
NAMEPLATE RATING (GROSS MWe):
1200.1 6.
DESIGN ELECTRICAL RATING (NET MWe):
1100 7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
1140 9.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
1095 9.
IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE. REASONS:
(
_ _ _ _ ____ _N_O_N E
--===
-_-____-- _ _ = - _ - _ _ _ _ - _ _ _ _ _ - - _ _ _ - - _ _ _ _ - _ _ _ _ _
- 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
- 11. REASONS FOR RESTRICTIONS, IF ANY:
__fiONE________________________________
________----__--____----__---=--
_==______=_==____--________
_____-____---__-----__---____-____--__--=-_
_= ___
MONTH YEAR CUMULATIVE
- 12. REPORT PERIOD HOURS 719 2879 12079.2
- 13. HOURS REACTOR CRITICAL O.O 1779.4 9095.5
- 14. RX RESERVE SHTDWN HRS 0.0 340.4 340.4
- 15. HRS GENERATOR ON LINE O.0 1738.1 8764.5
- 16. UNIT RESERVE SHUTDOWN HOURS 0.0 381.7 381.7
- 17. GROSS THERMAL ENERGY (MWH)
O 3877530 21441810
- 18. GROSG ELECTRICAL ENERGY (MWH)
O 1275780 7099030
- 19. NET ELECTRICAL ENERGY (MWH) 0 1223978 6810751
- 20. UNIT SERVICE FACTOR O.0%
60.4%
72.6%
- 21. UNIT AVAILABILITY FACTOR O.0%
73.6%
75.7%
- 22. UNIT CAPACITY FACTOR (MDC NET) 0.0%
38.8%
51.5%
- 23. UNIT CAPACITY FACTOR (DER NET) 0.0%
38.6%
51.3%
24 UNIT FORCED OUTAGE RATE O.0%
0.9%
8.4%
- 25. FORCED OUTAGE HOURS 0.0 16.2 801.2-
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,DATE, DURATION):
_____--________________-_-_____________HTHL-_--_-___--_____---____-
j
.