Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211L445 + (ML20211L445)
- ML20211L446 + (ML20211L446)
- ML20211L447 + (ML20211L447)
- ML20211L450 + (ML20211L450)
- ML20211L452 + (ML20211L452)
- ML20211L456 + (ML20211L456)
- ML20211L457 + (ML20211L457)
- ML20211L460 + (ML20211L460)
- 05000354/LER-1986-078, :on 861111,automatic Isolation of RWCU Sys from Valid High Differential Flow Signal Received.Caused by Leak, Resulting in 50 Gpm Differential Flow.Corrective Actions Include Leak Repair & Redesign of RWCU Sys + (ML20211L463)
- ML20211L466 + (ML20211L466)
- ML20211L468 + (ML20211L468)
- ML20211L469 + (ML20211L469)
- ML20211L470 + (ML20211L470)
- ML20211L471 + (ML20211L471)
- ML20211L472 + (ML20211L472)
- ML20211L473 + (ML20211L473)
- ML20211L477 + (ML20211L477)
- ML20211L478 + (ML20211L478)
- ML20211L479 + (ML20211L479)
- ML20211L480 + (ML20211L480)
- ML20211L481 + (ML20211L481)
- ML20211L482 + (ML20211L482)
- ML20211L484 + (ML20211L484)
- 05000461/LER-1986-021, :on 861114,unplanned Automatic Isolation of RWCU Occurred Due to Pump Room a High Temp Trip Signal. Caused by Work Being Performed on Temp Sensing Thermocouple. Addl Controls Added to Preclude Recurrence + (ML20211L485)
- ML20211L487 + (ML20211L487)
- ML20211L488 + (ML20211L488)
- ML20211L490 + (ML20211L490)
- ML20211L492 + (ML20211L492)
- ML20211L493 + (ML20211L493)
- ML20211L494 + (ML20211L494)
- ML20211L495 + (ML20211L495)
- ML20211L498 + (ML20211L498)
- ML20211L502 + (ML20211L502)
- NL-86-909, Forwards Updated Status to Region V Outstanding Items Rept, Per Util 861015 ltr.Thirty-one Items Identified Complete & Closure Packages Generated.Seventy Addl Packages Will Be Ready for Closure within Next 3 Wks + (ML20211L504)
- IR 05000313/1999012 + (ML20211L507)
- ML20211L509 + (ML20211L509)
- ML20211L510 + (ML20211L510)
- 3F1286-07, Provides Revised Response to Violations Noted in Insp Rept 50-302/86-26.Listed Initiatives Taken by Mgt to Create Greater Awareness of Radiation Safety Requirements in Work Force,Including Rewriting of Health Physics Procedures + (ML20211L512)
- ML20211L513 + (ML20211L513)
- ML20211L514 + (ML20211L514)
- ML20211L516 + (ML20211L516)
- ML20211L517 + (ML20211L517)
- ML20211L518 + (ML20211L518)
- ML20211L519 + (ML20211L519)
- ML20211L520 + (ML20211L520)
- ML20211L521 + (ML20211L521)
- 05000272/LER-1986-021-01, :on 861112,discovered That Tech Spec Surveillance 4.3.3.9 for Quarterly Functional Test of Noble Gas Activity Monitor Not Performed within Required Time Frame.Caused by Personnel Error + (ML20211L522)
- ML20211L524 + (ML20211L524)
- IA-86-278, Partial Response to FOIA Request.Documents Listed in Apps D & E Available in PDR + (ML20211L528)
- ML20211L528 + (ML20211L528)
- 3F1286-01, Revises 861028 Response to Violations Noted in Insp Rept 50-302/86-06.Util Will Pursue Listed Program to Characterize Radionuclide Distribution in Compacted Dry Active Waste + (ML20211L529)