Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209H439 + (ML20209H439)
- ML20209H440 + (ML20209H440)
- ML20209H442 + (ML20209H442)
- ML20209H443 + (ML20209H443)
- 05000440/LER-1986-046, :on 860813 & 14,independent Sample Analysis & Release Rate Calculation/Discharge Line Valving Verifications Not Performed Prior to Commencing Liquid Radwaste Batch Discharge Releases.Caused by Personnel Error + (ML20209H444)
- ML20209H446 + (ML20209H446)
- ML20209H447 + (ML20209H447)
- ML20209H450 + (ML20209H450)
- ML20209H452 + (ML20209H452)
- 05000327/LER-1986-034, :on 860814 & 15,Surveillance Instructions SI-238.1 & SI-302.2 Discovered Not Conducted within Time Limits.Caused by Personnel Errors.Instructions Conducted & Personnel Counseled + (ML20209H453)
- PNO-I-85-084, on 851101,plant Scrammed from 100% Power Due to Loss of Instrument Air & Failure of Feed Regulator Valves to Lockup.Licensee Will Install Correct Cable to One Dc Emergency Isolation Valve + (ML20209H454)
- ML20209H455 + (ML20209H455)
- ML20209H456 + (ML20209H456)
- IR 05000295/1986028 + (ML20209H457)
- ML20209H460 + (ML20209H460)
- BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with + (ML20209H462)
- ML20209H464 + (ML20209H464)
- 3F1185-08, Requests That ESFAS Components Be Deleted from Requirement for ESFAS Actuation.Requests Response by 851231 to Permit Proper Refuel VI Project Scheduling + (ML20209H465)
- ML20209H466 + (ML20209H466)
- SVP-99-148, Monthly Operating Repts for June 1999 for Quad Cities Nuclear Power Station,Units 1 & 2.With + (ML20209H467)
- ML20209H469 + (ML20209H469)
- ML20209H470 + (ML20209H470)
- L-99-264, Responds to NRC 990603 Administrative Ltr 99-02, Operating Licensing Action Estimates, for Fy 2000 & 2001 + (ML20209H472)
- ML20209H472 + (ML20209H472)
- ML20209H473 + (ML20209H473)
- ML20209H474 + (ML20209H474)
- ML20209H477 + (ML20209H477)
- ML20209H479 + (ML20209H479)
- ML20209H480 + (ML20209H480)
- ML20209H481 + (ML20209H481)
- ML20209H483 + (ML20209H483)
- ML20209H485 + (ML20209H485)
- ML20209H489 + (ML20209H489)
- ML20209H490 + (ML20209H490)
- ML20209H491 + (ML20209H491)
- ML20209H493 + (ML20209H493)
- ML20209H494 + (ML20209H494)
- IR 05000334/1985020 + (ML20209H496)
- ML20209H498 + (ML20209H498)
- ML20209H499 + (ML20209H499)
- ML20209H500 + (ML20209H500)
- TXX-4994, Interim Deficiency Rept CP-86-21 Re Raychem Methodology for Testing Environ Qualification Which May Render Raychem Kit NPKS-02-01 Unacceptable for Specific Published Applications. Initially Reported on 860324.Next Rept Expected by 860926 + (ML20209H501)
- ML20209H502 + (ML20209H502)
- ML20209H505 + (ML20209H505)
- ML20209H508 + (ML20209H508)
- ML20209H510 + (ML20209H510)
- ML20209H514 + (ML20209H514)
- U-600700, Forwards Technical Justification of Deferral of Addl Initial Test Program Item Re Area Temp Surveys to Be Completed After Fuel Load.Deferral Will Not Affect Safe Operation of Plant or Put Excess Burden on Operators or Startup Personnel + (ML20209H515)
- ML20209H516 + (ML20209H516)
- ML20209H517 + (ML20209H517)
- ML20209H518 + (ML20209H518)