Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206F078 + (ML20206F078)
- TXX-6379, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Portions of Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305. Next Rept Will Be Submitted by 870624 + (ML20206F079)
- ML20206F080 + (ML20206F080)
- ML20206F081 + (ML20206F081)
- 05000461/LER-1987-011, :on 870310 & 11,shifting of Main Control Room Ventilation Sys to High Chlorine Mode Occurred.Caused by Exceeding Trip Setpoint.Mods to Raise Alarm Setpoint on Chlorine Detectors Planned + (ML20206F082)
- ML20206F084 + (ML20206F084)
- ML20206F086 + (ML20206F086)
- ML20206F087 + (ML20206F087)
- ML20206F088 + (ML20206F088)
- ML20206F089 + (ML20206F089)
- 05000352/LER-1986-054, :on 861218,reactor Encl Secondary Containment Isolation Occurred When Fuse Blew in Isolation Logic.Cause Unknown.Fuse Replaced W/Fuse of Correct Size & Isolation Reset + (ML20206F090)
- ML20206F092 + (ML20206F092)
- ML20206F093 + (ML20206F093)
- ML20206F095 + (ML20206F095)
- ML20206F098 + (ML20206F098)
- ML20206F099 + (ML20206F099)
- ML20206F100 + (ML20206F100)
- 05000352/LER-1987-009, :on 870306,control Room Ventilation Sys Isolated & Emergency Fresh Air Supply Sys Train B Actuated. Caused by False Signal from Channel D Chlorine Analyzer. Temporary Circuit Alteration Installed + (ML20206F101)
- ML20206F102 + (ML20206F102)
- ML20206F104 + (ML20206F104)
- ML20206F105 + (ML20206F105)
- ML20206F106 + (ML20206F106)
- ML20206F107 + (ML20206F107)
- ML20206F108 + (ML20206F108)
- ML20206F110 + (ML20206F110)
- ML20206F112 + (ML20206F112)
- ML20206F113 + (ML20206F113)
- ML20206F114 + (ML20206F114)
- ML20206F116 + (ML20206F116)
- ML20206F117 + (ML20206F117)
- ML20206F119 + (ML20206F119)
- ML20206F120 + (ML20206F120)
- ML20206F121 + (ML20206F121)
- ML20206F123 + (ML20206F123)
- IA-98-275, Forwards Draft Language for Sentence on Appointments for Page I-1.Without Encl + (ML20206F124)
- ML20206F124 + (ML20206F124)
- ML20206F125 + (ML20206F125)
- ML20206F127 + (ML20206F127)
- ML20206F128 + (ML20206F128)
- ML20206F129 + (ML20206F129)
- W3P87-0176, Responds to NRC Request for Summary of Events & Conditions Associated W/Request for Emergency Change in Tech Specs for Moderator Temp Coefficient + (ML20206F130)
- ML20206F131 + (ML20206F131)
- ML20206F132 + (ML20206F132)
- ML20206F133 + (ML20206F133)
- ML20206F134 + (ML20206F134)
- ML20206F136 + (ML20206F136)
- ML20206F137 + (ML20206F137)
- ML20206F141 + (ML20206F141)
- ML20206F143 + (ML20206F143)
- ML20206F144 + (ML20206F144)
- ML20206F145 + (ML20206F145)