Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205G724 + (ML20205G724)
- ML20205G725 + (ML20205G725)
- ML20205G727 + (ML20205G727)
- 05000237/LER-1987-007-02, :on 870227,drywell Structural Steel Radial Beam Discovered Outside Design Requirements.Caused by Reinstallation Deficiency.Beam Repair Completed on 870314, Per Engineering Change Notice D875-09 + (ML20205G729)
- ML20205G731 + (ML20205G731)
- PNO-V-87-024, on 870322,both Main Feedwater Pumps Lost Suction Pressure & Tripped.Plant Operator Manually Tripped Reactor Upon Losing All Feedwater Flow.Reactor Vessel Level Restored & Heat Manually Removed.Investigation Pending + (ML20205G733)
- ML20205G734 + (ML20205G734)
- ML20205G735 + (ML20205G735)
- ML20205G736 + (ML20205G736)
- ML20205G739 + (ML20205G739)
- ML20205G743 + (ML20205G743)
- ML20205G745 + (ML20205G745)
- ML20205G748 + (ML20205G748)
- ML20205G750 + (ML20205G750)
- ULNRC-04000, Forwards Rept Re Present Level of Insurance & Sources of Insurance Applicable to Callaway Plant,Per 10CFR50.54(w) + (ML20205G753)
- 05000249/LER-1987-002-09, :on 870225,while Unit Operating at 87% Power, HPCI Sys Discovered Inoperable.Caused by Oil Pressure Regulation Valve Failure.Similar Event Occurred on 870313. Limits of PS4 Reset to 60 Psig Increasing + (ML20205G755)
- ML20205G756 + (ML20205G756)
- RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) + (ML20205G758)
- ML20205G759 + (ML20205G759)
- ML20205G760 + (ML20205G760)
- ML20205G761 + (ML20205G761)
- ML20205G764 + (ML20205G764)
- ML20205G765 + (ML20205G765)
- ML20205G767 + (ML20205G767)
- ML20205G771 + (ML20205G771)
- IR 05000315/1987004 + (ML20205G772)
- ML20205G773 + (ML20205G773)
- 05000289/LER-1988-005-02, :on 880925,RCS Heatup Rate Increased to 60 F Per Hour When Third Reactor Coolant Pump Started.Caused by Procedural Error.Operators Trained & Procedures Revised Re Primary Monitoring Method Used + (ML20205G774)
- ML20205G776 + (ML20205G776)
- ML20205G777 + (ML20205G777)
- ML20205G779 + (ML20205G779)
- ML20205G780 + (ML20205G780)
- ML20205G781 + (ML20205G781)
- ML20205G785 + (ML20205G785)
- ML20205G786 + (ML20205G786)
- ML20205G787 + (ML20205G787)
- ULNRC-03998, Forwards Required Financial Info Re Decommissioning Callaway Nuclear Plant,Per 10CFR50.75 + (ML20205G788)
- ML20205G789 + (ML20205G789)
- ML20205G790 + (ML20205G790)
- ML20205G792 + (ML20205G792)
- ML20205G793 + (ML20205G793)
- ML20205G796 + (ML20205G796)
- NOC-AE-000367, Application for Amends to Licenses NPF-76 & NPF-80, Relocating TS 3/4.3.3.4, Meteorological Instrumentation & Associated Bases Description to STP Trm,Per NUREG-1431 + (ML20205G797)
- ML20205G800 + (ML20205G800)
- ML20205G805 + (ML20205G805)
- NLS8600263, Documents Action Taken Re Equipment Operational Analysis for Limitorque Motor Operators,Per Util .Remaining Insps Will Be Completed During 1986 Refueling Outage + (ML20205G806)
- ST-HL-AE-2010, Forwards Revised FSAR Chapters 6.2 & 15.6,reflecting ECCS Reanalysis.Reanalysis Utilizes Approved Westinghouse Bart Program & Incorporates as-built Plant Data & Other Assumptions Not Used in Earlier Analysis + (ML20205G807)
- ML20205G808 + (ML20205G808)
- ML20205G809 + (ML20205G809)
- ML20205G811 + (ML20205G811)
- ML20205G812 + (ML20205G812)