Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203N722 + (ML20203N722)
- ML20203N724 + (ML20203N724)
- ML20203N728 + (ML20203N728)
- ML20203N731 + (ML20203N731)
- ML20203N732 + (ML20203N732)
- ML20203N734 + (ML20203N734)
- ML20203N737 + (ML20203N737)
- ML20203N740 + (ML20203N740)
- ML20203N743 + (ML20203N743)
- ML20203N744 + (ML20203N744)
- ML20203N748 + (ML20203N748)
- ML20203N749 + (ML20203N749)
- ML20203N750 + (ML20203N750)
- ML20203N755 + (ML20203N755)
- IR 05000321/1986009 + (ML20203N758)
- ML20203N760 + (ML20203N760)
- ML20203N762 + (ML20203N762)
- ML20203N763 + (ML20203N763)
- ML20203N764 + (ML20203N764)
- 05000220/LER-1986-029, :on 860910,instrument & Control Dept Surveillance Test Not Performed within Required Interval. Caused by Unintentional Deletion of Test from Schedule. Personnel Advised & Schedule Updated + (ML20203N767)
- IR 05000289/1986013 + (ML20203N768)
- 05000219/LER-1986-021, :on 860828,six Nuclear safety-related Sys Failed to Satisfy Plant Seismic Design Bases Per IE Bulletins 79-02 & 79-14.Caused by Original Design & Const Deficiencies.Deficiencies Will Be Corrected + (ML20203N772)
- ML20203N774 + (ML20203N774)
- ML20203N775 + (ML20203N775)
- ML20203N779 + (ML20203N779)
- ML20203N780 + (ML20203N780)
- ML20203N781 + (ML20203N781)
- ML20203N782 + (ML20203N782)
- ML20203N785 + (ML20203N785)
- 05000369/LER-1986-009, :on 860507,electric Motor Operators for Unit 1 Valve 1NI-10 & Unit 2 Valves 2NI-9 & 2NI-10 Determined Insufficiently Sized to Guarantee Opening Under Worst Case Design Conditions + (ML20203N790)
- ML20203N792 + (ML20203N792)
- ML20203N796 + (ML20203N796)
- 05000251/LER-1986-022-01, :on 860908,Phase a Containment Isolation of Train B Actuated.Caused by Personnel Error & Wire/Bundle Relay Interference During Insp.Technicians Counseled & Request for Technical Assistance Written + (ML20203N797)
- ML20203N798 + (ML20203N798)
- IR 05000219/1986027 + (ML20203N804)
- ML20203N806 + (ML20203N806)
- ML20203N810 + (ML20203N810)
- ML20203N811 + (ML20203N811)
- 05000275/LER-1986-013-01, :on 860913,three Snubbers on Steam Generator 1-2 Discovered W/Load Pins Out of Position.Cause Under Investigation.Analysis of Mispositioned Load Pins Also Underway + (ML20203N814)
- ML20203N820 + (ML20203N820)
- ML20203N822 + (ML20203N822)
- ML20203N838 + (ML20203N838)
- 05000341/LER-1986-032, :on 860908,entry Into Fire Protection Tech Spec Action Statement Delayed.Caused by Cognitive Personnel Error.Hourly Fire Watch Posted,Personnel Counseled & Surveillance Test Procedures Corrected + (ML20203N839)
- ML20203N840 + (ML20203N840)
- ML20203N844 + (ML20203N844)
- ML20203N845 + (ML20203N845)
- ML20203N848 + (ML20203N848)
- ML20203N849 + (ML20203N849)
- ML20203N851 + (ML20203N851)
- ML20203N855 + (ML20203N855)
- ML20203N856 + (ML20203N856)