- _ _ _ _ _ _ _ _
'
APR 2 21986
.-
,
,
Georgia Power Company
ATTN: Mr. R. J. Kelly
Executive Vice President
P.O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT NOS. 50-321/86-09 AND 50-366/86-09
On February 22 - March 21,1986, NRC inspected activities authorized by NRC
Operating License Nos. DPR-57 and NPF-5 for your Hatch facility. At the conclu-
sion of the inspection, the finoings were discussed with those members of your
staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC require-
ments.
The violation, references to pertinent requirements, and elements to be
included in your response are presented in the enclosed Notice of Violation.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
CT."'T1f.L SlG'E0 CY
VHiGi!. L BROV/NLEE
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosures:
1.
2.
Inspection Report Nos. 50-321/86-09
and 50-366/86-09
cc w/encls:
(See page 2)
8605060034 960422
gDR
ADOCK 05000321
l 0
ggo j
.
_ - _ _ _ _ _ _ _ - _ .
-
4
-
.
APR 2 21988
,
Georgia Power Company
2
cc w/encls:
s/J. T. Beckham, Vice President and
Ub. General Manager-Nuclear Operation
C. Nix, Site General Manager
g/ . E. Fornel, Site QA Supervisor
. Gucwa, Chief, Nuclear Engineer
e
bec w/encls:
pocumentControlDesk
VNRC Resident Inspector
State of Georgia
RII
RII
Algnatonis:dm
VBrownlee
04/ /86
04/ /86
.
-
-
-
. -