Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199J615 + (ML20199J615)
- ML20199J616 + (ML20199J616)
- ML20199J617 + (ML20199J617)
- ML20199J618 + (ML20199J618)
- ML20199J619 + (ML20199J619)
- ML20199J621 + (ML20199J621)
- ML20199J623 + (ML20199J623)
- LR-N970762, Provides Notification Re Change to Util Plan for Repairing Core Spray Nozzle Weld N5B.Commitment Change in Addition to Previously Submitted Change,Encl + (ML20199J625)
- ML20199J628 + (ML20199J628)
- ML20199J629 + (ML20199J629)
- 3F0198-44, Provides Util Schedule for Submitting Hot Leg Injection Via Reverse Flow Method of Post LOCA Boron Precipitation Control for NRC Review.Change Necessary Due to Rev to Analyses Associated W/Lar 223, Post-LOCA Boron Precipitation + (ML20199J630)
- ML20199J633 + (ML20199J633)
- ML20199J634 + (ML20199J634)
- ML20199J635 + (ML20199J635)
- ML20199J636 + (ML20199J636)
- ML20199J640 + (ML20199J640)
- ML20199J642 + (ML20199J642)
- ML20199J643 + (ML20199J643)
- ML20199J647 + (ML20199J647)
- NOC-AE-0017, Forwards Results of Control Rod Testing in Response to NRC Bulletin 96-001, Control Rod Insertion Problems. Encl Consists of Core Map,Current Unit 1 Specific Core Design Data & Units 1 & 2 Restart Evaluation Criteria + (ML20199J648)
- ML20199J649 + (ML20199J649)
- ML20199J652 + (ML20199J652)
- ML20199J654 + (ML20199J654)
- ML20199J655 + (ML20199J655)
- 05000440/LER-1986-021, :on 860602,discovered That Five Recirculation Damper Actuators in Diesel Generator Bldg Ventilation Sys Inoperable Due to Seal Failures.Caused by Expiration of Seal Life & Improper Storage & Maint.Seals Replaced + (ML20199J656)
- ML20199J657 + (ML20199J657)
- ML20199J659 + (ML20199J659)
- ML20199J662 + (ML20199J662)
- ML20199J663 + (ML20199J663)
- ML20199J665 + (ML20199J665)
- 05000416/LER-1986-020, :on 860603,discovered That Nonqualified Relay Could Cause Loss of Standby Gas Treatment Sys Safety Function During Accidents.Caused by Approved Design.Circuit Design Will Be Modified to Bypass Fan Contact + (ML20199J666)
- ML20199J669 + (ML20199J669)
- ML20199J670 + (ML20199J670)
- ML20199J675 + (ML20199J675)
- ML20199J677 + (ML20199J677)
- ML20199J680 + (ML20199J680)
- ML20199J681 + (ML20199J681)
- ML20199J684 + (ML20199J684)
- ML20199J685 + (ML20199J685)
- ML20199J686 + (ML20199J686)
- ML20199J687 + (ML20199J687)
- ML20199J690 + (ML20199J690)
- 05000334/LER-1998-029, :on 981218,inadequate Meterological Instrumentation Calibr Led to Failure to Comply with Tss.Caused by Human Error.Current Wind Direction Sensor Was Replaced.With + (ML20199J691)
- ML20199J692 + (ML20199J692)
- 05000483/LER-1986-019, :on 860606,during Mode 1,reactor Trip Occurred on Low Pressurizer Pressure.Caused by Technician Deviation from Calibr Procedure.Progressive Discipline Administered. Guidelines Given to Technicians + (ML20199J694)
- ML20199J695 + (ML20199J695)
- ML20199J696 + (ML20199J696)
- ML20199J698 + (ML20199J698)
- ML20199J699 + (ML20199J699)
- 05000269/LER-1986-007-02, :on 860502,discovered That Two Channels of Reactor Protective Sys (RPS) Inoperable at Same Time During Adjustment of hi-flux Trip Setpoint.Caused by Failure to Properly Tag Inoperable Module in RPS Cabinet + (ML20199J700)
- ML20199J701 + (ML20199J701)