Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-98-0016, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-14 & 50-325/97-14.Corrective Actions:Evaluation of Other Plant Areas for Similar Radiological Control Deficiencies Will Be Performed + (ML20199J070)
- ML20199J075 + (ML20199J075)
- NLS8600198, Responds to NRC Re Violations Noted in Insp Rept 50-298/86-06.Corrective Actions:Training Dept Instructions Revised & Written Exams Will Be Administered Following Requalification Lectures + (ML20199J079)
- ML20199J080 + (ML20199J080)
- IR 05000285/1997019 + (ML20199J081)
- ML20199J084 + (ML20199J084)
- PNO-II-98-005, on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 980205 + (ML20199J085)
- ML20199J091 + (ML20199J091)
- ML20199J094 + (ML20199J094)
- ML20199J096 + (ML20199J096)
- ML20199J097 + (ML20199J097)
- IR 05000298/1986013 + (ML20199J100)
- ML20199J103 + (ML20199J103)
- ML20199J104 + (ML20199J104)
- 05000269/LER-1997-011-01, :on 971228,initiated Shutdown Due to Calculated 404 Gallons Per Day SG Leak.Caused by Inadequate Process Control.Repaired Leaks + (ML20199J106)
- ML20199J107 + (ML20199J107)
- ML20199J111 + (ML20199J111)
- ML20199J114 + (ML20199J114)
- ML20199J116 + (ML20199J116)
- LIC-98-0001, Provides Addl Info Which Supports Request Exemption from 10CFR50 App R.Updated Status of long-term Corrective Actions Re Lube Oil Leakage from RC-3D Reactor Coolant Pump Motor, Discussed + (ML20199J118)
- ML20199J119 + (ML20199J119)
- ML20199J120 + (ML20199J120)
- ML20199J124 + (ML20199J124)
- ML20199J125 + (ML20199J125)
- ML20199J126 + (ML20199J126)
- PNO-IV-98-007, on 980122,while Attempting to Remove Sealed Source Containing 100 Mci of Am-241,source Exploded,Causing Contamination of Worker & Facility.Urine & Fecal Bioassay Ordered.Results Unavailable + (ML20199J127)
- NG-98-0172, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-331/97-17.Corrective Actions:Three Individuals Were Respirator Fit re-qualified Prior to Assuming Next Scheduled Watch + (ML20199J130)
- ML20199J132 + (ML20199J132)
- ML20199J136 + (ML20199J136)
- ML20199J145 + (ML20199J145)
- ML20199J147 + (ML20199J147)
- ML20199J152 + (ML20199J152)
- ML20199J153 + (ML20199J153)
- ML20199J161 + (ML20199J161)
- ML20199J166 + (ML20199J166)
- PNO-I-98-003, Region I Inspector Conducted Insp on 971120 & Found That Troxler Model 3411 Portable Moisture/Density Gauge Had Been Shipped to Temporary Jobsite & Had Not Been Returned + (ML20199J168)
- ML20199J177 + (ML20199J177)
- ML20199J178 + (ML20199J178)
- ML20199J179 + (ML20199J179)
- ML20199J180 + (ML20199J180)
- ML20199J182 + (ML20199J182)
- 05000254/LER-1998-002, :on 961007,required Drywell HP Instrument Channel Relay Monthly Surviellance Interval Was Exceeded Due to Inadequate Test Procedure.Caused by Cognitive Personnel Error.Personnel Error Reviewed W/Responsible Individuals + (ML20199J183)
- ML20199J185 + (ML20199J185)
- ML20199J186 + (ML20199J186)
- ML20199J188 + (ML20199J188)
- ML20199J189 + (ML20199J189)
- ML20199J192 + (ML20199J192)
- ML20199J193 + (ML20199J193)
- ML20199J194 + (ML20199J194)
- ML20199J195 + (ML20199J195)
- ML20199J197 + (ML20199J197)