Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NPL-97-0751, Special Rept:On 971023,low Temp Overpressure Protection Sys Operation Occurred.Caused by Starting Reactor Coolant Pump w/water-solid Reactor Coolant Sys.Operating Personnel Will Be Briefed on Event + (ML20199J009)
- ML20199J010 + (ML20199J010)
- ML20199J012 + (ML20199J012)
- W3P86-1845, Discusses Progress on Procurement & Installation of plant- Specific Simulator for Training & Other Tasks.Simulator Will Not Be Ready for Training Use Until 870301 Due to Vendor Singer Co (Link) Problems + (ML20199J014)
- ML20199J015 + (ML20199J015)
- RC-97-0240, Provides Confirmation of Completion of Actions Taken in Response to GL 96-01, Testing of Safety-Related Logic Circuits, Per 10CFR50.54(f) + (ML20199J017)
- ML20199J018 + (ML20199J018)
- ML20199J022 + (ML20199J022)
- ML20199J024 + (ML20199J024)
- ML20199J025 + (ML20199J025)
- ML20199J026 + (ML20199J026)
- ML20199J027 + (ML20199J027)
- ML20199J028 + (ML20199J028)
- ML20199J030 + (ML20199J030)
- ML20199J031 + (ML20199J031)
- LR-N970746, Informs That Util Is Revising Commitment to Determine Total Sludge Loading from Current Refueling Outage to Next Refueling Outage,Currently Scheduled to Begin in mid-Feb 1999,re Ieb 96-003, Potential Plugging of ECC Suction.. + (ML20199J033)
- ML20199J035 + (ML20199J035)
- ML20199J037 + (ML20199J037)
- ML20199J038 + (ML20199J038)
- ML20199J041 + (ML20199J041)
- ML20199J042 + (ML20199J042)
- ML20199J043 + (ML20199J043)
- IA-97-453, Final Response to FOIA Request for Documents.Documents Listed in App a Being Withheld in Part (Ref FOIA Exemption 5) + (ML20199J048)
- ML20199J048 + (ML20199J048)
- IR 05000498/1986002 + (ML20199J049)
- ML20199J054 + (ML20199J054)
- ML20199J055 + (ML20199J055)
- IR 05000298/1986006 + (ML20199J056)
- ML20199J057 + (ML20199J057)
- ML20199J059 + (ML20199J059)
- ML20199J064 + (ML20199J064)
- ML20199J067 + (ML20199J067)
- 05000293/LER-1986-013, :on 860530,discovered That LER for 840227 Discovery of Installation of Seismically Unqualified GE Cfd Relays for Diesel Generator Differential Protection Had Not Been Submitted.Relays Tripped on 860426 + (ML20199J069)
- BSEP-98-0016, Responds to NRC Re Violations Noted in Insp Repts 50-324/97-14 & 50-325/97-14.Corrective Actions:Evaluation of Other Plant Areas for Similar Radiological Control Deficiencies Will Be Performed + (ML20199J070)
- ML20199J075 + (ML20199J075)
- NLS8600198, Responds to NRC Re Violations Noted in Insp Rept 50-298/86-06.Corrective Actions:Training Dept Instructions Revised & Written Exams Will Be Administered Following Requalification Lectures + (ML20199J079)
- ML20199J080 + (ML20199J080)
- IR 05000285/1997019 + (ML20199J081)
- ML20199J084 + (ML20199J084)
- PNO-II-98-005, on 980201,plant Commenced Reactor Startup & Entered Mode 2 Conditions (Keff 0.99).On 980202,criticality Was Achieved,Followed by Mode 1 Conditions.Unit Scheduled to Be at 100% Power Late 980205 + (ML20199J085)
- ML20199J091 + (ML20199J091)
- ML20199J094 + (ML20199J094)
- ML20199J096 + (ML20199J096)
- ML20199J097 + (ML20199J097)
- IR 05000298/1986013 + (ML20199J100)
- ML20199J103 + (ML20199J103)
- ML20199J104 + (ML20199J104)
- 05000269/LER-1997-011-01, :on 971228,initiated Shutdown Due to Calculated 404 Gallons Per Day SG Leak.Caused by Inadequate Process Control.Repaired Leaks + (ML20199J106)
- ML20199J107 + (ML20199J107)
- ML20199J111 + (ML20199J111)
- ML20199J114 + (ML20199J114)