Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0586-07, Forwards Response to Violations Noted in Insp Rept 50-302/86-10.Response Withheld (Ref 10CFR73.21 & 2.790(d)) + (ML20198C941)
- ML20198C942 + (ML20198C942)
- ML20198C943 + (ML20198C943)
- 05000412/LER-1997-007-01, :on 971205,routine Surveillance Testing of Pr Neutron Flux High Positive Rate RT Function Was Inadequate. Caused by Lack of Awareness During Procedural Development to Ensure Adequate Overlap.Procedure Revised + (ML20198C946)
- LR-N980532, Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept + (ML20198C948)
- 05000285/LER-1985-008, :on 851003,unplanned Actuation of Ventilation Isolation Sys Occurred.Caused by Torn Filter Paper Allowing Particulate & Gaseous Activity Into Stack Gas Monitor. Filter Paper Repaired + (ML20198C949)
- ML20198C950 + (ML20198C950)
- ML20198C951 + (ML20198C951)
- ML20198C952 + (ML20198C952)
- ML20198C956 + (ML20198C956)
- ML20198C958 + (ML20198C958)
- ML20198C959 + (ML20198C959)
- ML20198C960 + (ML20198C960)
- ML20198C961 + (ML20198C961)
- IR 05000267/1985031 + (ML20198C963)
- ML20198C964 + (ML20198C964)
- ML20198C965 + (ML20198C965)
- ML20198C966 + (ML20198C966)
- ML20198C967 + (ML20198C967)
- ML20198C968 + (ML20198C968)
- JPN-98-050, Comment on Proposed Rule 10CFR50 Re Monitoring Effectiveness of Maint at Nuclear Power Plants.Encourages NRC Staff to Withdraw Proposed Change & to Work with Nuclear Power Industry & Other Stakeholders to Accomplish Goal + (ML20198C970)
- ML20198C972 + (ML20198C972)
- ML20198C973 + (ML20198C973)
- ML20198C974 + (ML20198C974)
- ML20198C976 + (ML20198C976)
- ML20198C977 + (ML20198C977)
- ML20198C978 + (ML20198C978)
- ML20198C979 + (ML20198C979)
- ML20198C980 + (ML20198C980)
- ML20198C981 + (ML20198C981)
- IR 05000213/1986009 + (ML20198C983)
- ML20198C985 + (ML20198C985)
- ML20198C986 + (ML20198C986)
- ML20198C987 + (ML20198C987)
- ML20198C988 + (ML20198C988)
- ML20198C989 + (ML20198C989)
- ML20198C990 + (ML20198C990)
- ML20198C991 + (ML20198C991)
- ML20198C992 + (ML20198C992)
- IR 05000245/1991005 + (ML20198C995)
- ML20198C998 + (ML20198C998)
- ULNRC-03937, Responds to RAIs on Proposed Conversion to Its,Section 3.8, Electrical Power Sys + (ML20198D000)
- ML20198D001 + (ML20198D001)
- 05000388/LER-1985-025-01, :on 851005,phase-to-ground Fault Occurred on 500 Kv Transmission Lines Due to Lightning Strike.Failure of Auxiliary Relay Resulted in Isolation of Generator.Caused by Stuck Relay.Relay Repaired + (ML20198D002)
- ML20198D003 + (ML20198D003)
- ML20198D004 + (ML20198D004)
- ML20198D005 + (ML20198D005)
- ML20198D006 + (ML20198D006)
- ML20198D007 + (ML20198D007)
- ML20198D009 + (ML20198D009)
- ML20198D010 + (ML20198D010)