Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- JAFP-88-0965, Forwards Addl Info on Internal Vessel Core Spray Pipe Crack. Crack Discovered During 881011 Visual Exam During Refueling Outage in Accordance W/Ie Bulletin 80-13.Stress Info Encl + (ML20155J162)
- ML20155J164 + (ML20155J164)
- 05000306/LER-1988-001-02, :on 880921,airlock Seal Test Not Performed within Required Time.Caused by Personnel Error.Importance of Adequately Reviewing Containment Entry Logs During Airlock Test Procedure Emphasized + (ML20155J166)
- ML20155J167 + (ML20155J167)
- ML20155J168 + (ML20155J168)
- ML20155J169 + (ML20155J169)
- ML20155J171 + (ML20155J171)
- ML20155J172 + (ML20155J172)
- IR 05000400/1988021 + (ML20155J176)
- ML20155J180 + (ML20155J180)
- IR 05000312/1986016 + (ML20155J181)
- ML20155J182 + (ML20155J182)
- ML20155J186 + (ML20155J186)
- ML20155J187 + (ML20155J187)
- IR 05000289/1998301 + (ML20155J188)
- 05000416/LER-1986-016, :on 860417,error Discovered in Procedure That Caused Missed Isolation Time Measurement for Containment power-operated Isolation Valve on MSIV Leakage Control Sys. Caused by Requirement Inadvertently Deleted + (ML20155J189)
- ML20155J191 + (ML20155J191)
- ML20155J192 + (ML20155J192)
- IR 05000369/1988026 + (ML20155J196)
- TXX-4801, Final Part 21 & Deficiency Rept CP-86-28 Re Gibbs & Hill non-nuclear Safety Classification of Svc Water Discharge Piping.Initially Reported on 860414.Issue Not Reportable Under 10CFR50.55(e) + (ML20155J197)
- ML20155J199 + (ML20155J199)
- ML20155J200 + (ML20155J200)
- IR 05000457/1987036 + (ML20155J201)
- ML20155J203 + (ML20155J203)
- ML20155J205 + (ML20155J205)
- ML20155J207 + (ML20155J207)
- ML20155J208 + (ML20155J208)
- ML20155J212 + (ML20155J212)
- ML20155J213 + (ML20155J213)
- ML20155J214 + (ML20155J214)
- 05000295/LER-1986-016-01, :on 860419,auxiliary Bldg Ventilation Standby Instrument Air Compressors Isolated.Cause Undetermined. Requirement for Shift Mgt Verification of Compressor Unisolation Steps in PT-210A Added + (ML20155J215)
- ML20155J218 + (ML20155J218)
- 05000304/LER-1986-005, :on 860219,diesel Generators 2A & O Tripped During Performance of PT-11 Loading Tests.Caused by Inadvertent Partial Fuel Supply Valve Closure & Faulty Kurman Instrument Relay.Relay Replaced + (ML20155J219)
- ML20155J222 + (ML20155J222)
- 05000498/LER-1988-016, Forwards LER 88-016-00 in Response to NRC Re Violations Noted in Insp Rept 50-498/88-01 Concerning Feedwater Flow Transmitters.Violation Fully Addressed as LER Subj.Corrective Actions Completed & Reviewed by NRC + (ML20155J227)
- ML20155J228 + (ML20155J228)
- ML20155J229 + (ML20155J229)
- ML20155J230 + (ML20155J230)
- ML20155J231 + (ML20155J231)
- ML20155J232 + (ML20155J232)
- 05000344/LER-1988-030, :on 880917,safety Injection Pump Inoperable Due to Mispositioned Svc Water Valve SW-237.Cause Undetermined. Performance of Locked Valve List Verification at More Frequent Intervals Will Be Evaluated + (ML20155J234)
- ML20155J235 + (ML20155J235)
- ML20155J236 + (ML20155J236)
- ML20155J237 + (ML20155J237)
- ML20155J240 + (ML20155J240)
- ML20155J241 + (ML20155J241)
- IR 05000369/1998009 + (ML20155J243)
- PNO-III-88-086, on 881016,reactor Automatically Shut Down Following Loss of Offsite power.Diesel-driven Auxiliary Feedwater Pumps Maintained Steam Generator Level.Caused by Explosion & Fire in Substation & Carboard in Delay Relay + (ML20155J248)
- ML20155J251 + (ML20155J251)
- ML20155J252 + (ML20155J252)
- IR 05000454/1988017 + (ML20155J257)