Forwards Insp Repts 50-313/88-25 & 50-368/88-25 on 880801-0915 & Notice of Violation,
ML20155J207
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/14/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20155J210 List:
References
NUDOCS 8810250389
Download: ML20155J207 (2)


See also: IR 05000313/1988025

Text

.

OCT I 41988

-

.

.

.

In Reply Refer To

Duckets: 50-313/88-25

50-368/88-25

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. W. D. Johnson, L. D.

Gilbert, and R. C. Haag of this office during the period August I through

September 15, 1988, of activities authorized by NRC Operating Licenses 9PR-51

and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the discussion of our

findings with Mr. J. M. Levine and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included followup of events, maintenance,

followup on previously identified items, operational safety verification,

surveillance, control of possible rnoderator dilution events, and Part 21

reports.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the inspectors. The findings are documented in the enclused

inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10 Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violotion enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511,

i

i

MU

r'

[88

l

RIV: I

SRI

C:PSA

bS

C:hPS

D:D

RHaag

WDJohnson

DDChamberlain LDGilbert

IBarnes

JLMIlhoan

/0 //2 /88

/> /s g88

/0 //2 /88

go M /88

go/(h/88

l0/Q /88

hoan

C

an

p/ p88

to /14/88

nen888: 88%

W.'

l

Q

PDC

i(

.

- -

A

.

.

. . -

.

.

-

_ - .

.

-

.

.

'

.

-

.

,

.

Arkansas Power & Light Company-

-2-

Should you have any questions concerning this inspection,'we will be pleased to

discuss them with you.

.

i

Sincerely,

Orighal Signed By

I

A.B. Ucach

L. J. Callan, Director

i

Division of Reactor Projects

!

!

Enclosures:

i

l

1.

Appendix A - Notice of Violation

,

l

2.

Appendix B - NRC Inspection Report

l

50-313/88-25

!

50-368/88-25

l

>

,

cc w/ enclosures:

'

l

Arkansas Nuclear One

"

l

ATTN:

J. M. Levine, Director

.;

l

Site Nuclear Operations

'

P.O. Box 608

Russellville, Arkansas 72801

l

l

Arkansas Radiation Control Program Director

(

l

bectoDMB(IE01)

,

l

'

bec distrib, by RIH

'

  • RRI

Robert D. Martin, RA

RPSB-DRSS

  • Section Chief (DRP/A)
  • Lisa Shea, RM/ALF
  • RIV File
  • DRP
  • MIS System

j

l

  • RSTS Operator
  • Project Engineer, GRP/A

L

l

  • C

Harbuck, NRR Project Manager

  • R. Hall

!

l

  • DRS

!

'

'

.

  • w/766

I

!

l

!

!

l

!

,

l

l

-

-

-

.

.

. -

-

-

-

-

.

- - .