ML20155J207
| ML20155J207 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/14/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20155J210 | List: |
| References | |
| NUDOCS 8810250389 | |
| Download: ML20155J207 (2) | |
See also: IR 05000313/1988025
Text
.
OCT I 41988
-
.
.
.
In Reply Refer To
Duckets: 50-313/88-25
50-368/88-25
Arkansas Power & Light Company
ATTN: Mr. Gene Campbell
Vice President, Nuclear
Operations
P.O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson, L. D.
Gilbert, and R. C. Haag of this office during the period August I through
September 15, 1988, of activities authorized by NRC Operating Licenses 9PR-51
and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the discussion of our
findings with Mr. J. M. Levine and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included followup of events, maintenance,
followup on previously identified items, operational safety verification,
surveillance, control of possible rnoderator dilution events, and Part 21
reports.
Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspectors. The findings are documented in the enclused
inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10 Code of
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violotion enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511,
i
i
MU
r'
[88
l
RIV: I
C:PSA
bS
C:hPS
D:D
RHaag
WDJohnson
DDChamberlain LDGilbert
IBarnes
JLMIlhoan
/0 //2 /88
/> /s g88
/0 //2 /88
go M /88
go/(h/88
l0/Q /88
hoan
C
an
p/ p88
to /14/88
nen888: 88%
W.'
l
Q
i(
.
- -
A
.
.
. . -
.
.
-
_ - .
.
-
.
.
'
.
-
.
,
.
Arkansas Power & Light Company-
-2-
Should you have any questions concerning this inspection,'we will be pleased to
discuss them with you.
.
i
Sincerely,
Orighal Signed By
I
A.B. Ucach
L. J. Callan, Director
i
Division of Reactor Projects
!
!
Enclosures:
i
l
1.
Appendix A - Notice of Violation
,
l
2.
Appendix B - NRC Inspection Report
l
50-313/88-25
!
50-368/88-25
l
>
,
cc w/ enclosures:
'
l
Arkansas Nuclear One
"
l
ATTN:
J. M. Levine, Director
.;
l
Site Nuclear Operations
'
P.O. Box 608
Russellville, Arkansas 72801
l
l
Arkansas Radiation Control Program Director
(
l
bectoDMB(IE01)
,
l
'
bec distrib, by RIH
'
- RRI
Robert D. Martin, RA
RPSB-DRSS
- Section Chief (DRP/A)
- Lisa Shea, RM/ALF
- RIV File
- DRP
- MIS System
j
l
- RSTS Operator
- Project Engineer, GRP/A
L
l
- C
Harbuck, NRR Project Manager
- R. Hall
!
l
- DRS
!
'
'
.
- w/766
I
!
l
!
!
l
!
,
l
l
-
-
-
.
.
. -
-
-
-
-
.
- - .