Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NLS8800486, Submits Current plant-specific Seismic Verification Plans for Facility,In Response to Generic Ltr 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 + (ML20155E754)
- B12028, Forwards Revised Relief Requests PR-4 & PR-12 Re Performing Certain Preservice Insps.Requests Initially Submitted on 851223 & Approved in Sser 5 (NUREG-1031).Revised Requests Include Welds Identified After Initial Requests + (ML20155E755)
- ML20155E756 + (ML20155E756)
- BSEP-88-0971, Comments on NRC Concerns Raised During 880908 Enforcement Conference Re Status of Evaluation of Hpci/Rcic Event. Requirement for Clear & Concise Communications Between Util & NRC Recognized + (ML20155E757)
- ML20155E759 + (ML20155E759)
- ML20155E760 + (ML20155E760)
- ML20155E761 + (ML20155E761)
- ML20155E762 + (ML20155E762)
- 05000341/LER-1988-021, :on 880510,reactor Protection Sys High Pressure Scram Occurred 18 After Closure of Both Main Steam Bypass Valves.Caused by Faulty Relay.Relay Replaced.Mod to Alter Comparator Trip Circuits Planned + (ML20155E764)
- ML20155E765 + (ML20155E765)
- ML20155E766 + (ML20155E766)
- ML20155E767 + (ML20155E767)
- ML20155E770 + (ML20155E770)
- JAFP-98-0353, Forwards Rev 2 to IST Program for Pumps & Valves - Third Interval Plan, for Ja FitzPatrick NPP + (ML20155E771)
- IR 05000456/1998305 + (ML20155E778)
- CEO-88-247, Advises That Util Will Implement Second 10-year Inservice Insp Plan During Cycle 8 Refueling Outage Scheduled to Begin on 890701.List of Remaining Items for First Inservice Insp Encl + (ML20155E780)
- ML20155E781 + (ML20155E781)
- ML20155E783 + (ML20155E783)
- ML20155E786 + (ML20155E786)
- ML20155E787 + (ML20155E787)
- 05000285/LER-1988-013, :on 880509,Channel C Reactor Coolant Low Flow Trip Setpoint Found to Be Out of Tolerance Low.Caused by Failed Power Supply to Trip Unit.Supply Replaced,Unit Returned to Operability & Memo Issued + (ML20155E790)
- ML20155E791 + (ML20155E791)
- ML20155E792 + (ML20155E792)
- IR 05000424/1988039 + (ML20155E793)
- ML20155E794 + (ML20155E794)
- ML20155E795 + (ML20155E795)
- ML20155E796 + (ML20155E796)
- ML20155E797 + (ML20155E797)
- JAFP-88-0903, Responds to Concerns Identified in Emergency Operating Procedures Insp Rept 50-333/88-20.Corrective Actions:Rev to Emergency Operating Procedure Writers Guide Will Be Issued to Address Interruptions in Flow + (ML20155E798)
- ML20155E801 + (ML20155E801)
- ML20155E802 + (ML20155E802)
- ML20155E803 + (ML20155E803)
- ML20155E805 + (ML20155E805)
- IR 05000423/1988016 + (ML20155E808)
- ML20155E809 + (ML20155E809)
- ML20155E810 + (ML20155E810)
- ML20155E812 + (ML20155E812)
- U-601211, Forwards 1987 Annual Repts for Util & Associated Cooperatives + (ML20155E814)
- ML20155E815 + (ML20155E815)
- ML20155E816 + (ML20155E816)
- ML20155E818 + (ML20155E818)
- ML20155E819 + (ML20155E819)
- ML20155E821 + (ML20155E821)
- PY-CEI-NRR-0449, Forwards Snubber Augmented Inservice Insp/Exam & Functional Testing Program for Perry Nuclear Power Plant,Unit 1. Written Approval of Program & Encl Relief Request from ASME Requirements for Snubber Test Sample Sizes Requested + (ML20155E822)
- IR 05000324/1988028 + (ML20155E828)
- ML20155E830 + (ML20155E830)
- ML20155E832 + (ML20155E832)
- 05000260/LER-1988-001-03, :on 880510,diesel Generator 3A Started Due to Inadvertent Start Signal.Caused by Movement of Relay Cycling Causing Boots to Fall Off Contact Arm.Experiments Conducted W/Identical Relays & Boot Matl + (ML20155E837)
- ML20155E841 + (ML20155E841)
- ML20155E842 + (ML20155E842)
- ML20155E846 + (ML20155E846)